[{"k":"Service","u":"/services/air-balancing/","t":"Air balancing (TAB)","s":"We measure the airflow at every diffuser, grille and fan, adjust the system until it matches the design, and give you a report that proves it.","nh":"air balancing set airflow at every terminal and fan to design testing adjusting and balancing","nb":"mechanical contractor general contractor engineer and building owner air handler rooftop unit supply return and exhaust fan vav and constant volume terminal diffuser and grille a signed balance report with design and measured airflow for every terminal and fan project specification and drawing aabc national standard or nebb procedural standard ashrae standard 111 a new building or tenant fit out is nearing turnover and the engineer need a balance report occupant say some room are too hot too cold stuffy or drafty equipment ductwork or the floor layout has changed since the system was last balanced youre preparing for commissioning an energy retrofit or leed documentation review we go through the drawing specification equipment submittal and control sequence and flag anything that will stop the system reaching design before we arrive inspect and test we confirm damper filter belt and control are in working order then measure fan performance and the airflow at every terminal with calibrated instrument adjust we set volume damper terminal unit minimum and maximum fan speed and drive setting to bring each reading within the specified tolerance verify and report we re measure record final reading against design and list anything that couldnt be corrected and why design and measured airflow for every terminal fan and air handler fan data speed static pressure motor current and drive setting outstanding deficiency with the cause and a recommended fix a list of the instrument used and their calibration date how close to design doe the airflow need to be the project specification set the tolerance for air terminal its commonly within 10 of design we report every reading against that tolerance so the engineer can see exactly where the system stand can you balance a building that already occupied yes most of the work happen in the ceiling space and at the diffuser we plan it around the people using the building and most room are only disturbed briefly why not have the installi"},{"k":"Service","u":"/services/water-balancing/","t":"Water balancing (hydronic)","s":"We measure the water flow through every coil, pump and balancing valve in your heating or cooling system and set it to design, so every zone gets the capacity it was designed for.","nh":"hydronic water balancing set flow at every coil pump and valve to design testing adjusting and balancing","nb":"contractor at turnover facility manager and engineer heating water chilled water and condenser water system pump coil radiation heat exchanger and balancing valve a hydronic balance report with design and measured flow at every coil and pump project specification aabc national standard or nebb procedural standard ashrae standard 111 a new or renovated hydronic system need balancing before turnover zone near the boiler or chiller overheat or overcool while distant zone cant keep up pump are working harder than they should or the balancing valve have never been set youve added coil replaced pump or converted to variable flow pumping review we study the piping drawing pump curve coil schedule and valve location and confirm the system is filled vented flushed and clean measure we read flow at the balancing valve use an ultrasonic meter where there no fitting and record pump pressure and motor data set we adjust the balancing valve using a proportional method so each coil reache design flow with the least pump energy verify and report we confirm final flow and temperature and record every valve position so the system can be reset later design and measured flow for every coil terminal and heat exchanger pump flow head and motor data compared with the pump curve final balancing valve setting deficiency such as trapped air failed valve or undersized pump what the difference between air and water balancing air balancing set the airflow through duct and diffuser water balancing set the flow through the pipe coil and pump that heat or cool that air most building need both and each affect the other can balancing reduce pumping cost often once flow are correct the pump can usually be slowed down or its impeller trimmed instead of throttling valve which cut the energy it use do you need to shut the system down no hydronic balancing is done with the system running at its normal operating condition"},{"k":"Service","u":"/services/duct-leakage-testing/","t":"Duct leakage testing","s":"We pressurize sections of ductwork and measure how much air escapes, so leaks are found and sealed before the ceilings close.","nh":"duct leakage testing find and fix duct leak before ceiling close testing adjusting and balancing","nb":"mechanical contractor engineer and commissioning agent supply return and exhaust ductwork in commercial institutional and residential building a test report with measured leakage against the allowable rate for each section smacna hvac air duct leakage test manual project specification and applicable energy code the specification require leakage testing of medium or high pressure ductwork ductwork is installed and need testing before the ceiling or insulation goe in a fan is moving its rated airflow but the room arent getting it you need documentation for energy code compliance or leed plan the test section we work with you to divide the ductwork into testable section and agree on the test pressure and allowable leakage for each seal and pressurize we cap the opening of each section and pressurize it with a calibrated test rig measure and locate we measure leakage at the test pressure and if a section fail help find the leak so they can be sealed retest and report failed section are retested after repair and every result is documented section by section leakage measured for each section with test pressure and duct surface area pass or fail against the allowable leakage retest result for any section that were repaired marked up drawing showing what was tested why test before the ceiling close leak are cheap to seal while the ductwork is exposed once the ceiling is in finding and fixing them cost far more how much leakage is allowed it depend on the duct pressure class and the specification the engineer set an allowable rate usually based on smacna leakage classe and we test against it do you test ductwork in house yes leaky duct in unheated space are a common cause of cold room and high heating bill in home"},{"k":"Service","u":"/services/control-system-verification/","t":"Control system verification","s":"We check that every sensor reads correctly, every actuator moves when it’s told to, and the control sequences do what the engineer wrote.","nh":"control system verification prove sensor actuator and sequence work as written testing adjusting and balancing","nb":"owner engineer control contractor and commissioning agent building automation system thermostat sensor actuator vav controller and air handler and plant sequence point to point checklist sequence test result and a list of control deficiency project sequence of operation csa z320 building commissioning ashrae guideline 0 a new building automation system has been installed and need checking before turnover the control say one thing and the building doe another equipment run after hour short cycle or fight itself such as heating and cooling at once youre upgrading control or adding new equipment to an existing system point to point checkout we confirm every input and output sensor read accurately against a calibrated reference and every damper valve and relay respond to its command sequence testing we put each system through its mode including occupied unoccupied morning warm up economizer and alarm and compare what happen with the written sequence trend review where the system can log data we review trend to catch problem that only show up over several day report we document what passed what failed and what need a programming or hardware fix completed point to point verification sheet functional test result for each sequence an issue log with recommended correction recommended trend log and alarm setting isnt this the control contractor job the control contractor doe their own checkout independent verification confirm it and catche the problem that are easy to miss when youre checking your own work how doe this relate to air balancing balancing depend on the control vav box minimum fan speed control and damper position all have to be right before airflow can be set so the two are often done together"},{"k":"Service","u":"/services/residential-air-balancing/","t":"Residential air balancing","s":"If one bedroom is always cold and another always stuffy, your system probably isn’t sending air where the house needs it. We measure every room and fix the balance.","nh":"residential air balancing even out room that run too hot or too cold testing adjusting and balancing","nb":"homeowner builder and property manager of house and townhome forced air furnace heat pump air conditioner hrv and erv and their ductwork room by room airflow reading before and after adjustment with recommendation csa f280 room by room heating and cooling capacity manufacturer installation requirement some room are noticeably warmer or colder than other upstair is hot in summer and the basement is cold in winter youve finished the basement added a room or replaced the furnace or air conditioner your hrv or erv was never balanced after it was installed walk through we talk with you about which room are uncomfortable and when and inspect the furnace filter ductwork and register measure we measure the airflow at every supply and return register and check the furnace total airflow and static pressure adjust we set branch damper and fan speed to send air where the house need it and balance the hrv or erv recommend if the ductwork itself is the problem we explain what would fix it and what involved airflow for every room before and after system static pressure and fan setting a short list of fixe if adjustment alone isnt enough will balancing fix my cold room often it help a great deal if the room need more heat than its duct can deliver or the room itself is poorly insulated well tell you so youre not paying for adjustment that cant work do i need a new furnace not usually comfort problem are more often caused by airflow and ductwork than by the furnace itself measuring first tell you which it is should i close the vent in room i dont use generally no closing several register raise the pressure in the ductwork which can reduce total airflow and strain the fan adjusting the branch damper is a better way to redirect air"},{"k":"Service","u":"/services/fire-damper-verification/","t":"Fire damper verification","s":"We find, inspect and drop-test every fire damper in your building, and give you a damper-by-damper record your fire inspector can rely on.","nh":"fire damper inspection and testing inspect and drop test every fire damper with record life safety verification","nb":"building owner property manager facility manager and contractor fire damper and combination fire smoke damper in ductwork and air transfer opening a damper inventory with the location condition and test result of each damper national fire code of canada and provincial fire code nfpa 80 a new building or renovation need its damper tested before occupancy the annual fire inspection is due or an inspector has asked for damper record the damper have never been tested or nobody know where they all are ductwork or wall around the damper have been modified locate we work from the drawing and the ceiling space to find every damper and note any without access door inspect we check that each damper is installed unobstructed and undamaged and that its fusible link is in place drop test we release the link or trigger the actuator confirm the damper close fully and latche then reset it record each damper get a location tag and a line in the inventory with its result and any repair needed a damper inventory with location and access note a pass or fail result for each damper a deficiency list missing access door failed closure damaged link record ready for your fire inspector how often do fire damper need to be checked the national fire code of canada require fire damper to be inspected at least every 12 month and tested in accordance with nfpa 80 nfpa 80 call for testing after installation again one year later and then every four year or every six year in hospital your provincial code and fire department may set their own requirement what if a damper cant be reached we record it as inaccessible with its location so an access door can be installed a damper that cant be tested is a gap in the building fire protection what the difference between a fire damper and a smoke damper a fire damper close when heat melt its fusible link stopping fire spreading through a duct a smoke damper is closed by the fire alarm or control to stop smoke moving through the building many building have co"},{"k":"Service","u":"/services/stairwell-pressurization/","t":"Stairwell pressurization verification","s":"In a fire, the stairs have to stay clear of smoke. We measure the pressure across each stair door and the force it takes to open it, and confirm the system works as designed.","nh":"stairwell pressurization testing confirm stair stay smoke free and door still open life safety verification","nb":"high rise owner contractor fire protection engineer and integrated testing coordinator stair pressurization fan relief and makeup air damper door hardware and their fire alarm control a test report with pressure differential and door opening force at each floor plus the test condition design criteria from the fire protection engineer national building code of canada and provincial code can ulc s1001 integrated system testing a new high rise need its stair pressurization verified before occupancy the building integrated fire protection system are due for periodic testing door fan or control serving the stair have been changed stair door are hard to open whistle or wont close properly agree on criteria we confirm the design pressure differential door opening force limit and test scenario with the engineer and the authority having jurisdiction prepare we check fan damper and door closer and coordinate with the fire alarm contractor to trigger the system test we activate the system and measure the pressure across each stair door with door closed and in the specified open position and measure door opening force report result are recorded floor by floor along with the outdoor condition and building state at the time of the test pressure differential at each stair door by floor door opening force measurement test condition including weather and building state deficiency and recommended adjustment why doe the pressure vary from floor to floor stack effect wind and leakage through the building change the pressure at each level especially in cold weather that why reading are taken on many floor not just one how often doe it need to be tested where stair pressurization is integrated with other fire protection system can ulc s1001 call for testing before occupancy again one year after the initial test at least every five year after that and whenever the integrated system are modified check your provincial code and local fire department for what apply to your building what if a "},{"k":"Service","u":"/services/fume-hood-certification/","t":"Fume hood certification","s":"A fume hood only protects the person in front of it if it pulls enough air. We test each hood’s airflow and alarms, and certify the ones that pass.","nh":"fume hood testing and certification test face velocity and alarm and certify hood life safety verification","nb":"university hospital research lab school and industrial lab chemical fume hood their exhaust fan airflow monitor and alarm a certification label on each passing hood and a test report for every hood csa z316 5 fume hood and associated exhaust system ashrae 110 test method ansi aiha z9 5 laboratory ventilation annual certification is due under your lab safety program a new hood has been installed or an existing one moved the exhaust fan ductwork or the room supply air has been changed the hood airflow alarm is sounding or user notice odour escaping inspect we check the sash baffle airflow monitor and work surface and note clutter or equipment that block airflow measure face velocity we take a grid of air velocity reading across the hood opening at the working sash height visualize airflow we use smoke to confirm air is drawn into the hood without rolling back toward the user check alarm and certify we verify the airflow monitor and alarm then label the hood that pass and tag any that fail face velocity reading and average for each hood smoke visualization result alarm and monitor verification certification label and a list of failed hood with the reason how often should fume hood be certified most lab safety program require certification at least once a year and again after any change to the hood or its exhaust system what face velocity should a hood have it depend on the hood design and your organization standard many program specify an average of about 0 4 to 0 5 m s 80 to 100 fpm at the working sash height what happen if a hood fail its tagged out of service and we tell you why it failed whether that the exhaust fan a blocked baffle the room supply air or how the hood is being used"},{"k":"Service","u":"/services/building-commissioning/","t":"Building commissioning","s":"Commissioning checks that a new building’s systems are designed, installed and operating the way the owner needs, and that the people running the building know how to keep them that way.","nh":"building commissioning verify a new building work the way the owner need commissioning","nb":"owner developer project manager and design team hvac control and the building system they interact with a commissioning plan functional test result an issue log and a final commissioning report csa z320 building commissioning ashrae guideline 0 leed commissioning requirement youre building new and want proof the system work before you accept them the project is pursuing leed which require commissioning the building has complex system such as lab healthcare space or integrated control past project had problem at turnover and you want a different result define requirement we document the owner project requirement how the building will be used comfort criteria energy goal and maintenance expectation review the design we review drawing and specification against those requirement and flag issue while theyre still cheap to fix verify installation we check equipment as its installed and review start up and balancing result test function we test each system through its operating mode and track every issue to resolution hand over we confirm the operation staff have the training manual and documentation they need and revisit the building before the warranty end owner project requirement and a commissioning plan design review comment functional test result and an issue log tracked to close out a final commissioning report and input to the system manual when should commissioning start in design the cheapest problem to fix are the one caught on paper a commissioning agent brought in at turnover can only find problem not prevent them is commissioning worth the cost a lawrence berkeley national laboratory study of 643 u s building found median energy saving of 13 from commissioning new construction with a median payback of 4 2 year before counting fewer callback and warranty claim how is commissioning different from balancing balancing set airflow and water flow commissioning check the whole system including control sequence equipment and documentation against what the owner need "},{"k":"Service","u":"/services/retro-commissioning/","t":"Retro-commissioning","s":"Most existing buildings drift away from how they were meant to run. Retro-commissioning finds the problems, ranks the fixes by cost and payback, and verifies the savings.","nh":"retro commissioning existing building find and fix operating problem in existing building commissioning","nb":"building owner property manager and facility manager hvac equipment control and sequence central plant ventilation and schedule a finding report with measure ranked by cost and saving plus verification after the fixe ashrae guideline 0 2 for existing building csa z320 building commissioning energy bill are rising and you dont know why tenant complain about comfort even though the equipment seem fine equipment run at night and on weekend when the building is empty youre planning capital upgrade and want to fix how the building run first collect data we review utility bill drawing control sequence and maintenance record and talk with the operator investigate we walk the building test equipment and trend the control system to find out what run when and why prioritize we list each problem with its estimated cost to fix and its energy or comfort benefit so you can decide what to do first fix and verify once the measure are in place we verify that they work and that the saving show up a finding report with each issue its cause and its fix measure ranked by cost saving and payback verification result after implementation recommendation to keep the building on track how much can retro commissioning save in a lawrence berkeley national laboratory study of 643 u s building commissioning existing building produced median whole building energy saving of 16 with a median payback of 1 1 year result vary by building but the fixe are often low cost change to control and schedule what kind of problem do you find typical finding include equipment running when the building is empty heating and cooling fighting each other outdoor air damper stuck open or shut failed sensor and setpoint that were changed and never put back do we need new equipment usually not to start retro commissioning get existing equipment running properly it also show which equipment really doe need replacing"},{"k":"Service","u":"/services/infrared-thermography/","t":"Infrared thermography","s":"An infrared camera shows temperature differences the eye can’t see. We use it to find missing insulation, air leaks, moisture and overheating equipment without opening a wall.","nh":"infrared thermography find heat loss air leak and moisture without opening wall commissioning","nb":"owner property manager homeowner and commissioning team wall roof window and their junction piping radiant system motor and mechanical equipment thermal image paired with photo for each finding with recommended next step astm c1060 thermographic inspection of insulation iso 6781 infrared detection of thermal irregularity you suspect heat loss draft or ice damming but cant see the cause there are sign of moisture or mould and you need to know how far they extend a new building envelope need checking before the warranty end you want to check radiant heating steam trap or equipment for hot spot plan for condition envelope scan need a real temperature difference between inside and outside so we schedule them for cold weather usually early morning or evening scan we scan the building inside and out depressurizing the building with a blower door make air leak show up more clearly confirm we check suspect area with moisture meter or other tool before calling something a problem report each finding is shown as a thermal image beside a normal photo with what we think it is and what to do next thermal and visual image pair for each finding what each anomaly is missing insulation air leakage moisture or an equipment fault prioritized recommendation when is the best time for an envelope scan when its much colder outside than inside which in canada usually mean winter with the heat on a difference of about 10 c or more make problem clear can thermography see through wall no it read surface temperature a cold patch on a wall tell us something behind it is different and then we work out what is it worth doing on a new building yes a scan before the warranty end can catch missing insulation and air barrier gap while the builder is still responsible for them"},{"k":"Service","u":"/services/energy-audits/","t":"Energy audits","s":"An energy audit shows where your building’s energy goes and which changes are worth making, with the cost, savings and payback of each.","nh":"energy audit see where energy goe and which upgrade pay back energy and sustainability","nb":"owner property manager institution and industrial facility hvac central plant lighting building envelope domestic hot water and control an audit report with measure ranked by cost saving payback and emission ashrae standard 211 commercial building energy audit incentive program requirement energy cost are high compared with similar building youre planning capital work and want to know which upgrade pay back an incentive program lender or tenant require an audit your organization has emission target to meet analyze the bill we review at least a year of utility data to see how and when the building use energy and benchmark it against similar building survey the building we walk the building with your operator and inventory the major equipment control and envelope identify measure we find opportunity from no cost operating change to capital upgrade estimate and rank we estimate the cost energy saving payback and emission reduction of each so you can plan an energy use breakdown and benchmark measure with cost saving payback and emission impact a recommended order of work documentation for incentive application what the difference between audit level ashrae standard 211 define three a level 1 is a walk through that find low cost measure a level 2 add a detailed survey and saving calculation for each measure a level 3 add detailed engineering analysis and cost estimate for major capital project which level do i need many owner start with a level 2 which give enough detail to make decision and apply for most incentive a level 3 make sense once youre committing to a large capital project can an audit help with incentive many utility and government program fund audit or require one before funding upgrade well tell you what documentation each program need"},{"k":"Service","u":"/services/energy-modeling/","t":"Energy modeling","s":"An energy model simulates your building through a full year of weather. It shows how design choices change energy use and cost before anything is built.","nh":"energy modeling simulate a year of operation before you build energy and sustainability","nb":"architect engineer developer and owner whole building envelope hvac lighting plug load and on site renewable a modeling report with result for each design option plus compliance documentation national energy code of canada for building necb ashrae standard 90 1 appendix g provincial energy code and step code you need to show energy code compliance using the performance path the project is pursuing leed or another green building certification youre comparing design option such as different hvac system or window specification an incentive program require modeled saving build the model we model the building geometry envelope system and schedule from the drawing set the baseline we model the reference building that the code or program compare against test option we run the design and each alternative you want to compare and show the effect on energy cost and emission document we prepare the report and form the code official certification body or incentive program require annual energy use cost and emission for each option a comparison against the code or program baseline compliance and certification documentation recommendation for the design team when should modeling start in early design when changing the building orientation glazing or system type cost nothing late in design modeling mostly document decision already made how accurate is an energy model a model predict performance under standard assumption and its very good at comparing option against each other actual energy use also depend on how the building is run and occupied can you model an existing building yes a model calibrated to the utility bill is a strong way to test retrofit option before spending money on them"},{"k":"Service","u":"/services/leed-consulting/","t":"LEED consulting and certification","s":"We guide your project through LEED certification, from setting a target and choosing credits to energy modeling, commissioning and the documentation review.","nh":"leed consulting and certification plan document and deliver leed certification energy and sustainability","nb":"developer owner architect and project team new construction interior and existing building operation a credit strategy scorecard supporting analyse and submitted documentation leed v5 administered in canada by cagbc ashrae 90 1 and necb for energy credit youre starting design and want a realistic certification target a tenant lender or municipality require leed or a similar rating your project is registered and need help with energy commissioning or documentation you want to certify an existing building operation set the target we run a workshop with the team to build a scorecard and pick a certification level the budget support plan the credit we assign responsibility and identify the credit that need early decision such as energy performance and commissioning deliver analyse we provide the energy modeling commissioning and other analyse within our scope document and submit we track documentation through design and construction and manage the review to certification a leed scorecard and credit responsibility matrix energy modeling and commissioning documentation submission management and response to reviewer comment which version of leed apply leed v5 opened for registration in canada on april 28 2025 registration for leed v4 and v4 1 closed at the end of the first quarter of 2026 so new project register under v5 who run leed in canada the canada green building council cagbc administer leed in canada doe leed cost more to build it can depending on the target setting the target early and choosing credit that fit the project keep the added cost down and energy and water saving offset part of it over the building life"},{"k":"Service","u":"/services/energuide-home-evaluations/","t":"EnerGuide home evaluations","s":"An EnerGuide evaluation rates your home’s energy use and shows which upgrades will make the biggest difference to comfort and energy bills.","nh":"energuide home evaluation an official energy rating and upgrade plan for your home energy and sustainability","nb":"homeowner buyer and seller and home builder the whole house insulation air tightness window heating cooling ventilation and hot water an energuide rating and label a homeowner information sheet and a renovation upgrade report natural resource canada energuide rating system done by an nrcan registered energy advisor youre planning renovation and want to spend on the upgrade that matter most a rebate or financing program require an evaluation before the work the house is drafty uncomfortable or expensive to heat youre buying or selling and want an official energy rating book a visit a registered energy advisor visit the home make sure the furnace water heater and attic hatch are accessible inspect and test the advisor measure the house record the insulation window and equipment and run a blower door test to measure air leakage rate the data goe into natural resource canada software to produce your rating in gigajoule per year report you receive your rating a label and a personalized list of recommended upgrade showing how each would change your rating an energuide rating in gigajoule per year and a label a homeowner information sheet a renovation upgrade report with recommended upgrade and before and after result what doe the rating mean its your home estimated annual energy use in gigajoule under standard operating condition the lower the number the better the report also compare your home with a typical new house can i get a rebate many provincial municipal and utility program offer rebate for evaluation or upgrade and many require an evaluation before and after the work program change often so well check what available where you live who can do an energuide evaluation only registered energy advisor working through a service organization licensed by natural resource canada can issue an official energuide rating"},{"k":"Service","u":"/services/solar-systems/","t":"Solar PV systems","s":"We assess whether solar makes sense for your building, then design and deliver a photovoltaic system sized to your roof, your electricity use and your utility’s rules.","nh":"solar pv system feasibility design and delivery of solar pv energy and sustainability","nb":"building owner businesse institution and homeowner rooftop and ground mounted photovoltaic array inverter monitoring and utility connection a feasibility study system design permit and an installed commissioned system canadian electrical code part i csa c22 1 provincial micro generation and net metering rule utility interconnection requirement you want to cut electricity cost or meet an emission target a new building or roof replacement make it a good time to add solar youre pursuing leed or net zero energy you want to know whether your roof is suitable before getting quote assess feasibility we look at roof area orientation shading structure and your electricity use and estimate production and payback design we size the array and inverter lay out the system and prepare drawing for permit get approval we handle the electrical permit and the utility interconnection application install and commission the system is installed tested and connected with monitoring so you can see what it produce a production and financial estimate design drawing and permit application utility interconnection approval a commissioned system with production monitoring doe solar work in canada climate yes cold temperature actually help panel efficiency and much of southern canada get good sun particularly the prairy snow reduce winter output but most production happen from spring to fall what happen to power i dont use depending on your province and utility surplus power can be exported to the grid for a credit under net metering or micro generation rule is my roof strong enough we check panel add weight and wind load so older roof may need a structural review and a roof near the end of its life should be replaced first"},{"k":"Service","u":"/services/geothermal-systems/","t":"Geothermal heat pump systems","s":"A geothermal system uses the steady temperature of the ground to heat and cool your building with a heat pump. We assess the site, design the loop and the system, and see it through to start-up.","nh":"geothermal heat pump system ground source heat pump from loop design to start up energy and sustainability","nb":"building owner developer and homeowner vertical and horizontal closed loop open loop heat pump and distribution system a feasibility assessment loop and system design and a commissioned installation csa ansi igshpa c448 ground source heat pump system provincial drilling and water regulation youre planning a new building and want low operating cost and emission youre replacing a boiler or furnace and considering electrification the building need both heating and cooling youre pursuing leed or net zero energy assess the site we calculate heating and cooling load and assess ground condition and the space available for the loop design the loop we size the ground loop to your load and soil this is the step that most often goe wrong when its guessed design the system we select the heat pump and design the distribution control and any backup heating build and start up we coordinate drilling or excavation installation flushing and pressure testing then commission the system heating and cooling load calculation ground loop design and specification system design drawing commissioning and start up record how doe geothermal compare with an air source heat pump ground temperature stay nearly constant all year so a geothermal system keep its efficiency in the coldest weather it cost more to install because of the loop but usually cost less to run do i need a lot of land not necessarily vertical borehole need very little surface area horizontal loop are cheaper to install but need more space why doe loop sizing matter so much an undersized loop cant move enough heat so efficiency drop and backup heat run more an oversized loop cost more than it need to proper design use your actual load and ground condition"},{"k":"Service","u":"/services/hvac-design/","t":"New HVAC design","s":"We design heating, ventilation and air conditioning for new buildings, additions and major renovations. We join the architect’s team as the mechanical consultant, or work directly for the owner, from the first concept through permit, tender, construction and handover.","nh":"new hvac design for architect and owner mechanical design for new building and renovation as part of your design team hvac design and design build","nb":"architect owner developer and project manager office healthcare lab school multi unit residential industrial data center and cleanroom sealed mechanical drawing and specification energy code compliance and site review through to occupancy national building code of canada and provincial building code necb and ashrae 90 1 energy code ashrae standard 62 1 ventilation and standard 55 comfort youre an architect who need a mechanical consultant on a new building or addition youre an owner or developer planning a project and want hvac option and cost before the design is fixed a renovation or change of use mean the existing system no longer fit you have an energy carbon or certification target the building has to meet concept and option we confirm the owner requirement budget and energy goal then compare system option on first cost operating cost carbon and maintenance schematic design we size the system locate mechanical room shaft and rooftop equipment and coordinate space with the architect design development we calculate load room by room select equipment lay out duct and piping and model energy code compliance construction document we issue sealed drawing and specification for permit and tender coordinated with the structural electrical and architectural set construction and handover we review shop drawing answer contractor question inspect the installation and witness balancing and commissioning before occupancy a system option report with cost energy and carbon compared load calculation and equipment selection sealed drawing and specification for permit and tender energy code compliance documentation site review report deficiency list and a final letter of assurance where required do you work for the architect or the owner either most often we are the mechanical consultant on the architect team but owner and developer also hire us directly especially for early option study or design build when should the mechanical engineer join the project as early as possible deci"},{"k":"Service","u":"/services/hvac-design-build/","t":"HVAC design-build","s":"With design-build, one firm is responsible for the whole HVAC system: the design, the equipment, the installation, and proving it works. You get one contract, one schedule and one point of contact, and no gap between the people who drew it and the people who built it.","nh":"hvac design build one firm from drawing to start up we design install balance and commission the system under one contract hvac design and design build","nb":"owner developer general contractor and property manager new building tenant improvement equipment replacement and system upgrade a designed permitted installed balanced and commissioned hvac system with full documentation mechanical design and permit equipment supply and installation testing balancing and commissioning you want one firm accountable for both design and installation the schedule is tight and design need to overlap with procurement and construction you want a firm price early based on a design you can review existing equipment has to be replaced in an occupied building with minimal disruption define the scope and budget we review the building and your goal then agree the scope budget and schedule design and price we design the system and give you a firm price based on that design with option where they make sense permit and procure we obtain permit and order long lead equipment early to protect the schedule install we manage the installation and coordinate with other trade and building operation balance commission and hand over our own tab and commissioning team prove the system meet design then we train your operator and hand over the documentation design drawing and specification a firm price and schedule an installed balanced and commissioned system balance report and commissioning result o m manual warranty and operator training what is the difference between design build and design bid build in design bid build the owner hire an engineer to design then tender the work to a separate contractor in design build one firm doe both under one contract which usually shorten the schedule and remove dispute over whether a problem is design or installation can an architect still lead the project yes on larger project we often work as the design build mechanical partner within a team the architect or general contractor lead who balance and commission the system we do with our own testing and commissioning staff so the system is proven before handover rather t"},{"k":"Service","u":"/services/high-efficiency-hvac/","t":"High-efficiency HVAC upgrades","s":"When equipment is due for replacement, it’s the cheapest moment to upgrade. We help you choose higher-efficiency systems that cut energy use, emissions and operating costs.","nh":"high efficiency hvac upgrade replace aging equipment with system that cost less to run hvac design and design build","nb":"building owner property manager and homeowner heat pump condensing boiler and furnace heat and energy recovery ventilator variable speed drive and control an option analysis with cost and saving a design and an installed system necb and provincial energy code ashrae standard 90 1 csa f280 for residential sizing a boiler furnace chiller or rooftop unit is near the end of its life you have emission or electrification target energy cost are high and the equipment is old or oversized incentive are available for high efficiency equipment assess what you have we review the existing equipment its condition and how the building actually use it including whether its oversized compare option we compare replacement from like for like to heat pump and heat recovery on cost saving emission and incentive design we size the new equipment to the real load not the nameplate of the old unit install and verify we manage installation and confirm performance with balancing and commissioning an option comparison with cost saving payback and emission a recommended system and design installed balanced and verified equipment do heat pump work in a canadian winter cold climate air source heat pump now operate at very low outdoor temperature though most design include backup heat for the coldest day ground source heat pump arent affected by outdoor temperature at all why not replace the old unit with the same size many existing unit are oversized oversized equipment cycle on and off waste energy and control humidity poorly sizing to a proper load calculation often mean smaller cheaper equipment are there incentive often utility and government program fund many high efficiency upgrade program change frequently so we check what current for your project"},{"k":"Service","u":"/services/building-automation-bacnet/","t":"Building automation and BACnet integration","s":"A building automation system runs your HVAC on schedule, keeps conditions steady and tells you when something’s wrong. We design, upgrade and integrate these systems using BACnet, the open standard most equipment supports.","nh":"building automation and bacnet integration open integrated control that operator can actually use hvac design and design build","nb":"owner facility manager and engineer building automation system controller sensor operator workstation and packaged equipment integration control design and sequence integration and verified operation bacnet ashrae standard 135 and iso 16484 5 project sequence of operation your control are outdated proprietary or no longer supported equipment from different manufacturer cant talk to each other you want to see and adjust the building from one place with useful alarm and trend youre adding equipment or a new wing to an existing system survey we inventory the existing controller point and equipment and find out what your operator need from the system design we write sequence of operation point list and an integration plan using open protocol to avoid being locked in to one vendor integrate we connect controller and packaged equipment so the system work as one verify we check every point and sequence and train your operator a point list and sequence of operation integration and network design verified graphic alarm and trend operator training what is bacnet bacnet is an open communication protocol for building automation published as ashrae standard 135 and iso 16484 5 equipment from different manufacturer that support it can share data on one system do we need to replace the whole system not alway many upgrade keep working field device and replace the controller or operator software in stage what about cybersecurity building automation network should be separated from general it network with managed account and controlled remote access we plan for this as part of the design"},{"k":"Service","u":"/services/healthcare-hvac/","t":"Healthcare HVAC","s":"In healthcare, ventilation controls infection, protects patients and staff, and can’t simply be switched off for maintenance. We design, test and verify HVAC systems built for those demands.","nh":"hvac for hospital and healthcare ventilation that protect patient and staff verified hvac design and design build","nb":"hospital clinic long term care home health authority and their design team operating room isolation room pharmacy lab patient care area and the plant that serve them design testing and verification of air change rate pressure relationship and filtration csa z317 2 hvac system in health care facility csa z8001 commissioning of health care facility infection prevention and control requirement a healthcare space is being built or renovated isolation or procedure room need their pressure relationship verified an accreditation infection control review or incident call for documentation system are aging and must be upgraded without interrupting care plan around care we work with facility and infection control staff to schedule work so patient area stay protected design or assess we design system to csa z317 2 or assess existing system against it test we measure air change rate pressure relationship filtration temperature and humidity in critical area verify and document we document result for your facility infection control team and accreditation air change and pressure relationship result by room a comparison with csa z317 2 requirement deficiency and corrective action documentation for infection control and accreditation how can system be tested without shutting down most testing is measurement under normal operation where adjustment are needed theyre planned with infection control and done area by area why is room pressure so important pressure control which way air move between room airborne isolation room are kept negative to keep contaminant in while operating room and protective environment are kept positive to keep them out is there more saving potential in a 24 7 building usually healthcare building run around the clock so every efficiency improvement pay back every hour as long as it never compromise required air change and pressure"},{"k":"Service","u":"/services/restaurant-hvac/","t":"Restaurant and commercial kitchen HVAC","s":"Kitchens move a lot of air. We design exhaust and makeup air that keeps the cooks comfortable, keeps smoke out of the dining room and meets fire code.","nh":"restaurant and commercial kitchen hvac kitchen exhaust and makeup air that work together hvac design and design build","nb":"restaurant owner franchise developer food service operator and their designer kitchen exhaust hood and fan makeup air unit dining room hvac and control a ventilation design permit drawing and a balanced verified system nfpa 96 as adopted by provincial building code can ulc 646 commercial kitchen exhaust hood local fire department requirement youre opening a new restaurant or converting a space to food service the kitchen is too hot or smoke drift into the dining room door are hard to open or whistle because the building is under negative pressure youre changing the cooking line or adding appliance under the hood review the menu and line exhaust need depend on what cooked and on which appliance so we start with the cooking line size exhaust and makeup air we size the hood and fan to capture smoke and grease and supply matching makeup air so the building stay balanced design for comfort we design the dining room heating and cooling to handle the heat and air the kitchen draw away balance and verify after installation we measure exhaust and makeup air and adjust them so the building pressure is right a ventilation design and permit drawing an exhaust and makeup air balance report recommendation on hood operation and energy use why is makeup air so important every cubic metre of air the hood exhaust has to be replaced without enough makeup air the building goe negative door are hard to open hood capture smoke poorly and gas appliance can vent badly which code apply to kitchen exhaust provincial building code adopt nfpa 96 for commercial cooking ventilation and the article number vary by province hood themselve are listed to canadian product standard such as can ulc 646 can kitchen ventilation use less energy yes demand controlled ventilation slow the exhaust and makeup air fan when the line isnt cooking at full load and heating the makeup air efficiently cut winter cost"},{"k":"Service","u":"/services/data-center-cooling-design/","t":"Data center cooling design","s":"We design cooling for data centers, server rooms and edge sites, from containment and chilled water plants to direct-to-chip liquid cooling for high-density racks. Every design is built around uptime first, then efficiency.","nh":"data center cooling design air and liquid cooling designed for uptime density and efficiency hvac design and design build","nb":"data center owner colocation operator enterprise it developer and design build team crah and crac unit containment chilled water plant economizer rear door and in row cooling coolant distribution unit and direct to chip liquid cooling cooling concept and redundancy strategy load and cfd study drawing and specification and commissioning support ashrae tc 9 9 thermal guideline for data processing environment ashrae standard 90 4 energy standard for data center national building code of canada necb and csa b52 youre building a new data center data hall or server room rack density are rising past what your room level air cooling can handle youre planning gpu or ai workload that need liquid cooling hot spot high pue or a cooling failure have exposed weaknesse in the existing design you need a redundancy strategy that matche your uptime target define the load and the risk we confirm it load today and at full build out rack density the uptime target and how much downtime a cooling failure would cost choose the cooling architecture we compare air hybrid and liquid option containment strategy and free cooling hour for your site climate design for redundancy we size equipment and arrange piping power and control so a single failure or maintenance on any one unit doesnt take down cooling model and document we run load and airflow study then produce drawing and specification for permit tender and construction commission under load we support integrated testing with load bank including failure scenario before it equipment goe live a cooling basis of design with load density and redundancy assumption stated free cooling and annual energy estimate including predicted pue airflow or cfd study where density and layout warrant them drawing and specification for permit and construction commissioning script and load bank test result what inlet temperature should a data hall run at ashrae thermal guideline give a recommended server inlet range of 18 to 27 c for most equipment classe run"},{"k":"Service","u":"/services/cleanroom-design/","t":"Cleanroom HVAC design","s":"We design HVAC for cleanrooms and controlled environments: the air change rates, HEPA filtration, pressure cascades and temperature and humidity control that hold a space to its ISO class or GMP grade.","nh":"cleanroom hvac design airflow filtration and pressure design for controlled environment hvac design and design build","nb":"pharmaceutical and biotech manufacturer hospital pharmacy research lab electronic and medical device maker recirculating air handler fan filter unit ducted hepa pressure control humidity control and monitoring a cleanroom basis of design drawing and specification and testing support through certification iso 14644 cleanroom classification and testing health canada gmp guidance and eu gmp annex 1 grade usp 797 and 800 for compounding pharmacy youre building or expanding a cleanroom compounding pharmacy or controlled lab a room is failing particle count pressure differential or recovery test youre moving to a higher classification or a new regulatory requirement energy cost are high and you want to reduce air change without losing compliance set the requirement we confirm the process the required iso class or gmp grade at rest and in operation and the room by room pressure and environmental limit lay out airflow and pressure we set air change rate or velocity filter coverage return location and the pressure cascade between room airlock and corridor design the air system we size air handler hepa and fan filter unit and humidity and temperature control with the redundancy the process need document we produce drawing specification and a sequence of operation including alarm and monitoring test and certify we balance airflow set pressure and support particle count recovery and filter integrity testing through certification a basis of design stating class air change rate pressure and environmental limit drawing and specification for permit and construction a sequence of operation with alarm setpoint balancing and pressure test result to support certification how many air change doe a cleanroom need it depend on the class the room size and how much contamination the process and people generate published range are a starting point we size airflow to hit the class with margin and verify it with recovery testing can you reduce the energy a cleanroom use often yes demand based "},{"k":"Service","u":"/services/critical-airflow-control/","t":"Critical airflow control and air valves","s":"Labs, isolation rooms and cleanrooms depend on airflow that holds steady while fume hood sashes move and doors open. We design, verify and retrofit venturi air valve systems, the pressure-independent valves made by manufacturers such as Antec Controls, Phoenix Controls and Accutrol, so rooms keep their pressure and hoods keep their face velocity.","nh":"critical airflow control and venturi air valve venturi air valve and room pressure control for lab and hospital hvac design and design build","nb":"university research and hospital lab isolation room vivarium pharmacy and cleanroom venturi air valve fume hood control room pressure monitor lab exhaust and supply makeup valve schedule and control sequence verified room offset and face velocity and a documented test report csa z316 5 fume hood and associated exhaust system ansi assp z9 5 laboratory ventilation csa z317 2 and ashrae standard 170 for healthcare youre designing a new lab isolation room or vivarium room are losing pressurization when hood open or door are used fume hood fail face velocity test or alarm are frequent legacy air valve or control are obsolete and need replacing you want to cut lab energy with lower minimum air change rate or sash management review the room we document every hood valve offset and air change requirement and how the lab is actually used size and select valve we size supply exhaust and hood valve for the full flow range with the turndown material and response the application need write the sequence we define how supply track exhaust how offset are held and how the system respond to sash movement occupancy and alarm verify we measure valve flow across their range confirm room offset and pressure direction and test hood face velocity and response document you receive a report showing each valve hood and room against its design valve schedule with design minimum and maximum flow control sequence and bas integration point measured valve flow room offset and pressure direction for every room fume hood face velocity result and a deficiency list what is a venturi air valve its an airflow control valve with a spring loaded cone inside a venturi shaped body the cone move to compensate for change in duct pressure so the valve hold its set flow without needing a flow sensor and it can change setpoint in about a second do you only work with one brand no we design to performance requirement and work with the major air valve manufacturer and we can verify or retrofit system from any of the"},{"k":"Industry","u":"/industries/pharmacies/","t":"HVAC for pharmacies and sterile compounding","s":"Compounding rooms that meet USP and NAPRA, with the pressures and air changes to prove it.","nh":"pharmacy and compounding compounding suite design design build for tenant space pressure control and air valve balancing before certification commissioning and monitoring","nb":"sterile and hazardous compounding room live or die by their air clean hepa supply enough air change and pressure that alway move in the right direction we design these suite for retail hospital and specialty pharmacy and test them so your certifier and regulator see the number pharmacy regulator in most province now expect compounding room to follow the napra model standard which draw heavily on usp 797 and usp 800 hazardous drug room must be negative to their anteroom while non hazardous buffer room stay positive often side by side in a small footprint retail pharmacy are usually tenant with a shared rooftop unit so the compounding suite need its own dedicated controllable air supply room pressure temperature and humidity have to be monitored and recorded and a door left open or a loaded filter can push a room out of range compounding suite design layout hepa supply air change rate pressure cascade and dedicated exhaust for anteroom buffer room and hazardous drug room hvac design design build for tenant space one contract to design install and start up a compounding suite inside an existing pharmacy or clinic hvac design build pressure control and air valve room pressurization control and venturi valve that hold the cascade steady as door open and filter load critical airflow control balancing before certification airflow and pressure set to design so the room passe iso classification testing the first time air balancing commissioning and monitoring verification of control alarm and the room monitoring system with record ready for inspection building commissioning napra model standard for pharmacy compounding sterile and hazardous preparation usp general chapter 797 and 800 iso 14644 1 cleanroom classification ceta certification guidance for compounding facility your provincial college of pharmacist requirement do you certify the hood and the room we design balance and commission the room hvac hood and room certification is done by an independent certifier we set t"},{"k":"Industry","u":"/industries/hospitals/","t":"HVAC for hospitals and healthcare facilities","s":"Operating rooms, isolation rooms and clinics designed and verified to CSA Z317.2.","nh":"hospital and healthcare healthcare hvac design isolation and or airflow control testing and balancing commissioning life safety verification","nb":"in a hospital the ventilation system is part of infection control we design and verify the airflow filtration and pressure relationship that protect patient and staff in operating room isolation room pharmacy lab and clinic including while the building stay open during renovation csa z317 2 set air change rate filtration humidity and pressure relationship room by room and inspector expect proof that each room meet them isolation and operating room need pressure that hold as door open and staff move through with alarm that work renovation happen inside occupied building so construction dust and pressure change must not reach patient area aging air handler steam humidifier and control must keep running around the clock while they are upgraded healthcare hvac design mechanical design for new wing renovation and clinic room by room to csa z317 2 healthcare hvac isolation and or airflow control pressure control and air valve for airborne isolation protective environment and operating room critical airflow control testing and balancing air change and pressure verification for every critical room with a report for infection prevention and control air balancing commissioning functional testing of air handler control alarm and emergency power transfer before patient move in building commissioning life safety verification fire damper inspection and stairwell pressurization testing across the building fire damper verification csa z317 2 special requirement for hvac system in health care facility csa z317 13 infection control during construction renovation and maintenance csa z8000 canadian health care facility ashrae standard 170 for reference and us designed equipment national building code of canada and provincial amendment can you test isolation room while the unit is open yes we schedule room by room with your infection prevention team and test pressure air change and alarm with minimal disruption do you work on long term care and clinic as well as hospital yes long term c"},{"k":"Industry","u":"/industries/data-centers/","t":"Cooling solutions for data centers","s":"Cooling design, containment and commissioning for server rooms up to full data halls.","nh":"data center data center cooling design design build integrated commissioning airflow balancing monitoring and control","nb":"data center turn almost every watt into heat all day every day we design cooling that keep it equipment within its limit through failure and heat wave use canada cold climate for free cooling and is proven under load before go live rack density are climbing fast with ai and high performance computing past what room level air cooling can handle a cooling failure can take equipment offline within minute so redundancy and ride through must be designed and tested cooling is the largest energy user after the it load and pue is now reported to owner tenant and investor server room in office building often depend on base building system that shut down at night or in winter data center cooling design air in row rear door and direct to chip liquid cooling chilled water plant and free cooling sized for today and growth data center cooling design design build one firm responsible for the cooling system from design through installation and start up hvac design build integrated commissioning load bank testing failure scenario and control verification before the first server goe live building commissioning airflow balancing perforated tile containment and crah airflow set and verified to remove hot spot air balancing monitoring and control bacnet integration with dcim and the building automation system building automation bacnet ashrae tc 9 9 thermal guideline for data processing environment ashrae standard 90 4 energy standard for data center uptime institute tier concept csa b52 mechanical refrigeration code necb and provincial energy code do you handle small server room yes many project are a single server or telecom room that need dedicated cooling separate from the office system can you add liquid cooling to an existing data hall usually we assess the chilled water capacity piping route and floor loading then design coolant distribution unit and piping for the rack that need it how do you prove the cooling work before go live with load bank that simulate the it heat we run t"},{"k":"Industry","u":"/industries/industrial/","t":"HVAC and ventilation for industrial facilities","s":"Process exhaust, make-up air and plant heating that protect workers and cut energy.","nh":"industrial and manufacturing ventilation and exhaust design design build exhaust system testing energy audit thermography","nb":"manufacturing plant have heat fume dust and big door that open to canadian winter we design ventilation that capture contaminant at the source replace exhausted air without freezing the plant and keep energy cost in check welding fume dust solvent vapour and process heat must be captured at the source to keep worker within occupational exposure limit every cubic metre exhausted has to be replaced and heated which is a major cost through an alberta or ontario winter process line change over time so exhaust system end up unbalanced with hood that no longer capture high bay large door and stratified heat make comfort and freeze protection difficult ventilation and exhaust design local exhaust hood ductwork dust collector and make up air designed together as one system hvac design design build one contract to design supply and install exhaust make up air and heating system hvac design build exhaust system testing hood capture velocity and branch flow measured and balanced with a report for your health and safety program air balancing energy audit where heat and fan energy are going with heat recovery and control upgrade ranked by payback energy audit thermography infrared survey that find heat loss failed insulation and overheating equipment infrared thermography acgih industrial ventilation a manual of recommended practice provincial occupational health and safety regulation and exposure limit nfpa 652 and 654 for combustible dust where adopted csa b149 1 for gas fired make up air and heater national building code and national fire code of canada can you test our existing exhaust hood yes we measure capture and duct velocity at each hood compare them to design or industry guidance and rebalance or recommend change do we need make up air if we only added one exhaust fan almost alway without make up air the plant goe negative door are hard to open gas appliance can backdraft and the new fan underperform can heat be recovered from process exhaust often the option depend o"},{"k":"Industry","u":"/industries/restaurants/","t":"HVAC for restaurants and commercial kitchens","s":"Kitchen exhaust, make-up air and dining room comfort, designed and balanced together.","nh":"restaurant and food service restaurant hvac design design build air balancing equipment upgrade","nb":"a busy kitchen pushe huge volume of hot greasy air out through the hood and every bit of it has to come back in as make up air we design kitchen exhaust make up air and dining room hvac as one system so the hood capture the door close and guest stay comfortable hood exhaust and make up air must match or the restaurant goe negative and the front door whistle and slam grease duct hood and fire suppression have strict code requirement that inspector check before opening day gas cooking appliance need interlock with the exhaust system untempered make up air in a canadian winter make the kitchen cold and the gas bill high restaurant hvac design hood grease duct exhaust fan make up air and dining room system designed together and stamped for permit restaurant hvac design build one contract from drawing to a working kitchen for new restaurant and renovation hvac design build air balancing hood exhaust make up air and dining room airflow measured and set so the building pressure is right air balancing equipment upgrade demand controlled kitchen ventilation and high efficiency rooftop unit that cut energy cost high efficiency hvac nfpa 96 ventilation control and fire protection of commercial cooking operation ulc s650 commercial kitchen exhaust hood assembly and fire damper csa b149 1 natural gas and propane installation code national building code and national fire code of canada local health authority requirement why doe our front door blow open or slam usually because the kitchen exhaust more air than is supplied balancing the hood and make up air and sometime adding make up air capacity fixe it can you design a restaurant in a leased space yes we check the existing rooftop unit roof structure and shaft route then design the kitchen and dining system to fit the space and the landlord requirement do you do the hood cleaning or suppression system no we design the exhaust and make up air system and coordinate with your hood supplier and suppression contractor"},{"k":"Industry","u":"/industries/retail/","t":"HVAC for retail stores and shopping centres","s":"Tenant fit-outs, rooftop unit replacements and energy savings across a portfolio.","nh":"retail and shopping center tenant fit out design design build equipment upgrade air balancing energy audit and retro commissioning","nb":"retail hvac has to be fast to build cheap to run and invisible to shopper we design tenant fit out and rooftop replacement balance store before opening and help landlord and chain cut energy across many site fit out run on tight schedule and must work with the landlord base building system and criteria many store run on aging rooftop unit that are inefficient and hard to keep running entrance lighting and changing layout make some area too hot and other too cold chain want consistent performance and energy data across dozen of location tenant fit out design mechanical design and permit drawing that meet landlord criteria and code hvac design design build rooftop unit replacement and store fit out under one contract hvac design build equipment upgrade high efficiency rooftop unit and heat pump chosen on life cycle cost high efficiency hvac air balancing store balanced before opening so customer and staff are comfortable on day one air balancing energy audit and retro commissioning schedule setpoint and control fixed across a portfolio for quick saving retro commissioning ashrae standard 62 1 ventilation for acceptable indoor air quality necb and provincial energy code national building code of canada landlord tenant design criteria csa b52 for refrigeration and heat pump can you work to the landlord tenant criteria yes we review the lease exhibit and base building drawing first so the design is approved by the landlord and the permit office without rework should we repair or replace our rooftop unit it depend on age condition refrigerant and energy use we compare the option on cost over the next 15 year and check available utility incentive do you work across multiple province yes we have office in edmonton calgary vancouver and toronto and work on store across canada"},{"k":"Industry","u":"/industries/warehouses/","t":"HVAC for warehouses and distribution centres","s":"Efficient heating, ventilation and destratification for big, tall buildings.","nh":"warehouse and distribution heating and ventilation design design build energy audit thermography rooftop solar","nb":"warehouse are big boxe with tall ceiling dock door and forklift heat rise to the roof cold air pour in at the dock and exhaust build up in the aisle we design heating and ventilation that keep the floor comfortable and safe without heating the roof deck warm air stratify under the roof so the floor is cold while the heating system run flat out dock door and overhead door let in large amount of cold air through the winter propane and gas forklift produce carbon monoxide and nitrogen dioxide that need detection and ventilation racking layout and tenant use change leaving heating and ventilation in the wrong place heating and ventilation design radiant heater make up air unit destratification fan and exhaust designed for the space and its racking hvac design design build heating ventilation and gas detection system designed installed and started up under one contract hvac design build energy audit heat loss door losse and control reviewed with upgrade ranked by payback and incentive energy audit thermography infrared survey that find envelope leak failed insulation and door seal problem infrared thermography rooftop solar solar pv designed for large flat warehouse roof solar system national building code of canada csa b149 1 for gas fired heater and make up air unit provincial occupational health and safety regulation for co and no2 necb and provincial energy code nfpa 13 sprinkler clearance coordination for overhead equipment radiant heat or forced air for high bay with many door opening radiant heat usually keep the floor more comfortable for less fuel because it warm people and surface instead of air we compare both for your building do destratification fan really save energy in tall heated space they usually do by pushing warm air from the roof back down to the floor the saving depend on ceiling height heating type and control do we need gas detection for forklift if you run fuel burning forklift indoor co and no2 detection with ventilation control is normally requ"},{"k":"Industry","u":"/industries/education/","t":"HVAC for schools, colleges and universities","s":"Healthy classrooms, safe labs and campus energy savings.","nh":"school and university hvac design commissioning retro commissioning fume hood certification lab airflow control energy audit","nb":"student learn better in classroom with fresh air quiet system and steady temperature and campus lab need fume hood that protect the people using them we design commission and tune hvac for school board college and university often while classe continue classroom are densely occupied and too little outdoor air show up as high co2 stuffiness and complaint teaching and research lab need fume hood and room pressure that work without wasting energy around the clock many school run on aging boiler unit ventilator and control with tight capital budget work has to fit around the school calendar often in the summer break hvac design new school addition and system replacement designed for ventilation quiet operation and low energy hvac design commissioning new building and major renovation verified before student arrive building commissioning retro commissioning schedule ventilation and control tuned across existing school for comfort and saving retro commissioning fume hood certification annual hood testing for teaching and research lab fume hood certification lab airflow control venturi air valve and lab control that keep hood safe while cutting exhaust energy critical airflow control energy audit campus and school board energy audit with upgrade ranked by payback and incentive energy audit ashrae standard 62 1 ventilation for acceptable indoor air quality ashrae standard 55 thermal comfort csa z316 5 fume hood and associated exhaust system ansi ashrae 110 fume hood performance testing necb and provincial energy code can you measure ventilation in our classroom yes we measure outdoor airflow at the equipment and co2 in occupied room compare them with the design and ashrae 62 1 and recommend fixe can the work be done during the summer we plan design testing and commissioning around the school calendar so the noisy and disruptive work happen when building are empty do you work with school board on multiple building yes we can assess a portfolio of school and give you a ranked"},{"k":"Industry","u":"/industries/property-managers/","t":"HVAC solutions for property managers and building owners","s":"Fewer complaints, lower operating costs and life-safety testing done on schedule.","nh":"property manager and owner retro commissioning testing and balancing fire damper verification stairwell pressurization testing energy audit building automation","nb":"property manager juggle tenant complaint operating budget capital plan and annual life safety testing we are one firm that can investigate the hot and cold call tune the building test the life safety system and plan the replacement across your whole portfolio tenant comfort complaint take up staff time and threaten renewal and the cause is often hard to pin down energy and operating cost keep rising and owner want lower cost and better benchmarking score fire damper stairwell pressurization and other life safety system need periodic testing and record for the fire inspector aging equipment need a replacement plan that fit the capital budget retro commissioning find and fix control schedule and equipment problem that cause complaint and waste energy retro commissioning testing and balancing rebalance floor after fit out and layout change so every tenant get the air they need air balancing fire damper verification periodic inspection and drop testing with a record for each damper fire damper verification stairwell pressurization testing annual testing of stair and smoke control system stairwell pressurization energy audit upgrade ranked by payback with help applying for utility incentive energy audit building automation bas upgrade bacnet integration and remote access across your portfolio building automation bacnet national fire code of canada and provincial fire code nfpa 80 and nfpa 105 fire and smoke damper inspection can ulc s1001 integrated system testing ashrae standard 180 inspection and maintenance of hvac system provincial energy benchmarking requirement such as ontario ewrb can you handle a whole portfolio yes we work across edmonton calgary vancouver toronto and other canadian city and can schedule testing and audit across many building with one point of contact how often do fire damper need testing the fire code and the referenced nfpa standard set the interval commonly every one to four year depending on the damper type and occupancy we confirm what appl"},{"k":"Topic","u":"/guides/topic/fundamentals/","t":"HVAC fundamentals and load calculations","s":"Psychrometrics, heat gain, sizing and the design basics every commercial project starts from.","nh":"guide","nb":""},{"k":"Topic","u":"/guides/topic/air-systems/","t":"Air systems and air distribution","s":"Air handlers, fans, ductwork, terminals and diffusers: moving the right air to the right place.","nh":"guide","nb":""},{"k":"Topic","u":"/guides/topic/hydronics/","t":"Hydronic systems","s":"Chilled water, heating water, pumping and piping design for commercial buildings.","nh":"guide","nb":""},{"k":"Topic","u":"/guides/topic/central-plants/","t":"Chillers, boilers and central plants","s":"Selecting, arranging and operating the equipment at the heart of large HVAC systems.","nh":"guide","nb":""},{"k":"Topic","u":"/guides/topic/packaged-vrf/","t":"Rooftop units, VRF and packaged systems","s":"Unitary equipment, variable refrigerant flow and split systems for small and mid-size buildings.","nh":"guide","nb":""},{"k":"Topic","u":"/guides/topic/ventilation-iaq/","t":"Ventilation and indoor air quality","s":"Outdoor air, filtration, humidity and contaminant control for healthy buildings.","nh":"guide","nb":""},{"k":"Topic","u":"/guides/topic/controls/","t":"Controls and building automation","s":"Sequences of operation, BACnet, sensors and the logic that makes systems perform.","nh":"guide","nb":""},{"k":"Topic","u":"/guides/topic/tab-cx/","t":"Testing, balancing and commissioning","s":"Proving systems work as designed, from airflow readings to functional tests.","nh":"guide","nb":""},{"k":"Topic","u":"/guides/topic/energy/","t":"Energy efficiency and decarbonization","s":"Heat pumps, heat recovery, energy codes and the path to low-carbon buildings.","nh":"guide","nb":""},{"k":"Topic","u":"/guides/topic/data-centers/","t":"Data center cooling and HVAC design","s":"Air and liquid cooling, containment, redundancy and efficiency for mission-critical facilities.","nh":"guide","nb":""},{"k":"Topic","u":"/guides/topic/cleanrooms/","t":"Cleanroom HVAC design","s":"Classification, airflow, pressurization and validation for controlled environments.","nh":"guide","nb":""},{"k":"Topic","u":"/guides/topic/air-valves/","t":"Air valves and critical airflow control","s":"Venturi air valves, room pressurization and precise airflow control for labs, hospitals and cleanrooms.","nh":"guide","nb":""},{"k":"Topic","u":"/guides/topic/building-types/","t":"HVAC by building type","s":"What changes when the building is a hospital, lab, school, kitchen, arena or warehouse.","nh":"guide","nb":""},{"k":"Topic","u":"/guides/topic/codes-standards/","t":"Codes and standards in Canada","s":"The codes, CSA standards and ASHRAE documents that shape Canadian HVAC work.","nh":"guide","nb":""},{"k":"Topic","u":"/guides/topic/operations/","t":"Operations and maintenance","s":"Keeping systems efficient and reliable after handover.","nh":"guide","nb":""},{"k":"Guide","u":"/guides/air-density-altitude-and-hvac-design-in-calgary-and-the-rockies/","t":"Air density, altitude and HVAC design in Calgary and the Rockies","s":"Learn how elevation changes air density, which HVAC calculations and selections need correction, and what to check when designing, balancing or commissioning systems in Calgary and mountain communities.","nh":"hvac fundamental and load calculation how altitude change air what change in hvac calculation heat transfer per unit of airflow psychrometric fan selecting a fan at altitude coil condenser and cooling equipment motor and drive combustion equipment measuring airflow at altitude actual versus standard airflow frequently asked question doe a fan move less air in calgary do i need to correct for altitude in edmonton who is responsible for altitude correction key takeaway","nb":"most hvac equipment data rule of thumb and textbook equation assume standard air at sea level calgary sit at roughly 1 000 to 1 100 m about 3 300 to 3 600 ft above sea level and mountain community such as canmore banff and lake louise are higher still at these elevation air is noticeably less dense and that affect almost every air side calculation the correction are not difficult but they are easy to forget especially when equipment is selected by someone working from sea level catalogue data ignoring altitude can lead to undersized airflow misread balancing measurement overheated motor and poorly performing combustion equipment this guide explain what change and what to do about it how altitude change air atmospheric pressure fall with elevation because air density is proportional to pressure at a given temperature density fall too using the standard atmosphere model location approximate elevation approximate standard pressure density relative to sea level sea level vancouver toronto lakeshore 101 3 kpa 1 00 edmonton about 670 m about 93 5 kpa about 0 92 calgary about 1 050 to 1 100 m about 89 kpa about 0 88 banff about 1 380 m about 86 kpa about 0 85 lake louise about 1 540 m about 84 kpa about 0 83 actual barometric pressure vary with weather but the standard value for the site elevation is used for design standard air density at sea level is about 1 2 kg m 0 075 lb ft in calgary the equivalent is roughly 1 06 kg m at the same temperature what change in hvac calculation heat transfer per unit of airflow the familiar sensible heat equation q w 1 23 x l s x delta t contain air density at calgary elevation the constant drop to roughly 1 08 in imperial 1 08 x cfm x delta t become roughly 0 95 x cfm x delta t put simply each litre per second of air carry about 12 less heat to meet the same sensible load a system in calgary need about 12 to 14 more volumetric airflow than the same system at sea level the latent and total heat equation change in the same proportion usin"},{"k":"Guide","u":"/guides/commercial-cooling-load-calculations/","t":"Commercial cooling load calculations explained","s":"Understand what goes into a commercial cooling load, how the ASHRAE methods handle time lag and storage, and how to review a load report before equipment is selected.","nh":"hvac fundamental and load calculation heat gain versus cooling load component of a commercial cooling load calculation method heat balance method radiant time sery method older method input that drive the answer zone peak versus block load reviewing a load report canadian consideration frequently asked question can i size a rooftop unit from floor area alone why doe the peak occur in september for some space should ventilation be included in the room load key takeaway","nb":"a cooling load calculation estimate how much heat must be removed from a space to hold the design indoor condition on a design day it is the foundation of everything that follow airflow coil capacity chiller size duct and pipe size and electrical service get it wrong and every downstream decision inherit the error commercial cooling load are harder than heating load because they change hour by hour the sun move people arrive and leave and the building mass store heat and release it later this guide explain the component of a cooling load the method used to calculate it and how to review the result heat gain versus cooling load two term are often confused heat gain is the rate at which heat enter or is generated in a space at a given moment cooling load is the rate at which heat must be removed from the room air to hold its temperature they differ because radiant heat from the sun light and people is first absorbed by floor wall and furniture then released to the air later only convective gain become cooling load immediately a heavy concrete building can delay and flatten the peak by several hour compared with a lightweight one this is why simply adding up instantaneous gain overstate the peak component of a commercial cooling load component type note solar gain through glazing sensible often the largest perimeter load depend on orientation shgc and shading conduction through glazing sensible driven by outdoor to indoor temperature difference conduction through wall and roof sensible delayed by mass sun heated surface raise effective temperature people sensible and latent vary with activity level lighting sensible part radiant part convective return plenum can capture some equipment and plug load sensible sometime latent computer kitchen equipment process load infiltration sensible and latent small in pressurized building but not zero ventilation outdoor air sensible and latent a coil load not a room load unless delivered untreated fan and duct heat gain sensible sup"},{"k":"Guide","u":"/guides/diversity-and-safety-factors-in-load-calculations/","t":"Diversity and safety factors in load calculations","s":"Learn the difference between diversity and safety factors, where each should be applied in a load calculation, and how stacked margins quietly produce oversized systems.","nh":"hvac fundamental and load calculation diversity load do not all peak together diversity factor where diversity apply safety factor margin for the unknown where margin hide principle for applying margin apply each margin once make margin explicit distinguish margin from redundancy consider the consequence of shortfall designing for growth diversity in data center and lab checking your work frequently asked question what is a typical safety factor for cooling load is diversity the same as a reduction factor should redundancy count as safety margin key takeaway","nb":"no load calculation is exact input are estimate building change over time and weather doe not follow the design day engineer deal with this uncertainty using two tool diversity factor which recognize that not every load peak at the same time and safety factor which add a margin for the unknown both are legitimate the problem is that they are often applied informally repeatedly and without documentation a small margin at each step can compound into equipment that is far larger than needed this guide explain what each factor mean where it belong and how to keep margin honest diversity load do not all peak together diversity reflect the fact that the sum of individual peak is larger than the peak of the sum example occupancy in an office not every workstation is occupied at once and people move between room equipment computer printer and appliance cycle and idle lighting daylight control and occupancy sensor switch light off solar east zone peak in the morning west zone in the afternoon tenant and use a mixed use building has retail office and residential load that peak at different time diversity factor a diversity factor is the ratio of the actual simultaneous peak to the sum of individual peak a value of 0 8 mean the coincident peak is 80 of the sum hour by hour load calculation capture solar and schedule diversity automatically additional diversity is applied to input such as occupancy or plug load peak fraction based on the expected use where diversity apply equipment being sized diversity to apply diffuser terminal unit branch duct little or none each serve a local peak zone heating and cooling coil little or none air handler and main duct block load diversity across zone served chiller or boiler plant diversity across all system served pump and main piping plant level diversity considering control valve behaviour electrical service for hvac coincident demand often coordinated with the electrical engineer a zone must handle its own peak even when other zone are l"},{"k":"Guide","u":"/guides/envelope-heat-loss-u-values-thermal-bridging-and-infiltration/","t":"Envelope heat loss: U-values, thermal bridging and infiltration","s":"Learn how to calculate envelope heat loss accurately, why thermal bridges and air leakage often matter more than insulation thickness, and how these factors affect HVAC sizing.","nh":"hvac fundamental and load calculation conduction basic nominal clear field and effective value thermal bridging psi and chi value why it matter beyond energy infiltration and air leakage driving force measuring airtightness estimating infiltration for design exfiltration and moisture putting it together a heat loss procedure implication for hvac design frequently asked question why is my wall actual performance lower than the insulation rating is airtightness more important than insulation can thermography measure u value key takeaway","nb":"the building envelope separate conditioned indoor space from the canadian winter heat escape through it by conduction across wall roof floor and window and by air leaking through gap and crack together these losse set much of the heating load and a significant part of annual energy use for many year envelope performance was described simply by the insulation value in the wall cavity we now know that this can badly overstate actual performance thermal bridge and air leakage frequently dominate this guide explain how to account for all three mechanism and why they matter for hvac design conduction basic steady state conduction through an assembly is q u x a x delta t where u is the heat transfer coefficient in w m k a is area in m and delta t is the indoor to outdoor temperature difference in k u is the inverse of the total thermal resistance in canada resistance is expressed in si as rsi m k w and in imperial as r ft f h btu conversion value rsi to r r rsi x 5 678 r to rsi rsi r x 0 1761 u si to u imperial u imperial u si x 0 1761 example rsi 3 52 is about r 20 resistance of layer in sery add together including the inside and outside air film that give the center of assembly or clear field value which assume uniform layer with no interruption nominal clear field and effective value three level of accuracy are commonly used nominal the rated value of the insulation alone for example r 20 batt useful for product comparison only clear field the assembly including framing member repeated uniformly such as stud at regular spacing steel stud reduce performance much more than wood stud because steel conduct heat so well effective or overall the clear field plus all the linear and point thermal bridge at interface such as slab edge window perimeter parapet and penetration for load calculation and energy model the effective value is what count in many commercial assembly with steel framing concrete balcony or poorly detailed window interface the effective value is substantial"},{"k":"Guide","u":"/guides/heating-load-calculations-for-canadian-climates/","t":"Heating load calculations for Canadian climates","s":"Learn the components of a heating load, where Canadian design temperatures come from, and how to avoid the errors that leave buildings cold or with oversized boilers and heat pumps.","nh":"hvac fundamental and load calculation the design case where design temperature come from component of the heating load envelope conduction below grade and slab losse ventilation infiltration humidification calculating the load a step by step procedure pickup safety factor and oversizing heat pump change the question code context frequently asked question should i use the 2 5 or 1 design temperature can i credit internal gain in an office why do older building often have more heating capacity than needed key takeaway","nb":"in most of canada heating is the defining hvac load a building in edmonton or winnipeg must hold comfortable condition when it is minus 30 c or colder outside often for day at a time a heating load calculation determine the capacity of boiler heat pump coil terminal unit and perimeter heating needed to do that heating load are conceptually simpler than cooling load because the design case is usually steady state a cold night with no sun and few internal gain that simplicity is deceptive ventilation infiltration and thermal bridging often dominate and they are the part most frequently estimated poorly with the shift to heat pump where capacity drop as outdoor temperature fall an accurate heating load matter more than ever the design case the standard design case assume outdoor air at the winter design temperature no solar gain night or heavy overcast internal gain from people light and equipment ignored or heavily discounted because the building may be unoccupied when the coldest weather arrive steady state conduction through the envelope ignoring internal gain is conservative but generally appropriate for sizing since equipment must also recover the building after a weekend or holiday setback some design credit continuous internal load such as a 24 7 data room but only where they are reliable where design temperature come from the national building code of canada nbc division b appendix c list climatic design value for hundred of canadian location including january 2 5 and 1 design temperature the 2 5 value is exceeded during about 2 5 of the hour in january the 1 value is colder provincial code in alberta british columbia ontario and quebec adopt the same or very similar table city january 2 5 design temperature approximate nbc appendix c vancouver about 7 c 19 f toronto about 18 c 0 f calgary about 30 c 22 f edmonton about 30 c 22 f alway confirm value for the exact municipality in the code edition adopted for your project since value vary within metropolitan area"},{"k":"Guide","u":"/guides/internal-heat-gains-from-people-lighting-and-equipment/","t":"Internal heat gains from people, lighting and equipment","s":"Learn how people, lights and equipment add heat to a space, how to estimate each with realistic values and schedules, and why overestimating them leads to oversized systems.","nh":"hvac fundamental and load calculation people occupant density time lag lighting lighting power density where the heat goe equipment and plug load office equipment kitchen and lab motor it equipment schedule and diversity common mistake internal gain and energy frequently asked question should i use nameplate power for computer do daylighting control reduce cooling load how do i estimate load for a building with no tenant yet key takeaway","nb":"internal heat gain are the heat produced inside a building by the people who use it the light that illuminate it and the equipment plugged into it in many commercial building especially interior zone office with modern glazing and anything with dense occupancy internal gain are the largest cooling load they are also the input most often guessed default value carried forward from older project frequently overstate lighting and equipment load and occupancy density are often taken from code maximum rather than actual use this guide explain each source give typical range from established reference and show how to apply them sensibly people occupant release both sensible heat by convection and radiation and latent heat by breathing and perspiration the amount depend on activity level ashrae handbook fundamental tabulate heat gain by activity the value below are representative of that table for a room at typical comfort condition the exact split change with room temperature activity approximate sensible gain per person approximate latent gain per person seated at rest theatre about 60 to 70 w about 30 to 40 w seated light office work about 70 to 75 w about 45 to 60 w standing light work retail about 75 to 90 w about 55 to 75 w moderate work light bench work about 80 to 100 w about 100 to 140 w heavy work or exercise 140 w or more 250 w or more occupant density density matter as much as heat per person a code occupant load used for exit design is a maximum not a typical value an open office might be designed around one person per 10 to 15 m while a meeting room or classroom can be much denser use the owner planned occupancy where known and the default density in ashrae standard 62 1 or necb modelling rule as a fallback time lag roughly half of the sensible gain from people is radiant which is absorbed by surface and released later latent gain become a load immediately this is handled by the cooling load method see commercial cooling load calculation lighting all electrical"},{"k":"Guide","u":"/guides/part-load-performance-why-buildings-rarely-run-at-design/","t":"Part-load performance: why buildings rarely run at design","s":"Learn why design conditions occur only a few hours a year, how part-load efficiency differs from full-load ratings, and how to select equipment and controls that perform well across the whole year.","nh":"hvac fundamental and load calculation why design condition are rare load profile and bin analysis part load efficiency rating how iplv work what make equipment efficient at part load variable speed multiple stage and modular equipment condensing and lower temperature heat exchanger with more surface where part load cause problem designing for part load a checklist frequently asked question is full load efficiency irrelevant why did my new high efficiency equipment not save as much as expected is iplv a guaranteed annual efficiency key takeaway","nb":"hvac equipment is sized for design condition the coldest or hottest weather the building is expected to see with full occupancy and every light on those condition happen only a handful of hour a year for the rest of the year which is nearly all of it the system run at part load this simple fact has big consequence the efficiency that matter most for energy cost is not the full load rating on the nameplate but the performance across the range of partial load where equipment actually spend its time system that are efficient at design but poor at part load often disappoint this guide explain why and how to design for the real operating profile why design condition are rare design condition are defined statistically for example a 1 annual cooling design value is exceeded in only about 1 of the hour in a year and the nbc january 2 5 value is exceeded in about 2 5 of january hour see selecting outdoor design condition for canadian city several other factor push actual load further below design weather coincidence peak temperature peak solar and peak humidity rarely happen at the same hour occupancy building are seldom fully occupied internal gain lighting and equipment load are lower than design assumption much of the time safety factor and oversizing margin added during design increase installed capacity see diversity and safety factor in load calculation equipment size step selecting the next larger model add more margin the result is that many system spend most of their operating hour well below half of their installed capacity load profile and bin analysis a load profile show how many hour a system operate at each fraction of its capacity it can be estimated from bin analysis grouping annual weather hour into temperature range bin and calculating the load in each hourly energy modelling simulating all 8 760 hour of the year using a weather file trend data for existing building measured operating data from the building automation system the profile typically show a lon"},{"k":"Guide","u":"/guides/psychrometrics-for-hvac-engineers/","t":"Psychrometrics for HVAC engineers: a practical guide","s":"Learn the properties of moist air, how to read a psychrometric chart, and how to use psychrometric processes and equations to size coils, check humidity and troubleshoot systems.","nh":"hvac fundamental and load calculation the property of moist air reading the chart common psychrometric processe sensible heating and cooling cooling and dehumidifying humidification mixing chemical dehumidification the everyday air side equation a worked procedure for a cooling coil where psychrometric solve real problem frequently asked question why is humidity ratio more useful than relative humidity do i need an altitude corrected chart what is the apparent dew point of a coil key takeaway","nb":"psychrometric is the study of moist air a mixture of dry air and water vapour almost every air side decision in hvac from sizing a cooling coil to diagnosing a damp classroom come back to how temperature and moisture interact engineer who are comfortable with the psychrometric chart make better selection and spot problem faster this guide cover the property that matter how to read the chart the common processe you will draw on it and the equation that turn a chart reading into kilowatt it is written for practising engineer but building owner who want to understand why their system struggle with humidity will find it useful too the property of moist air each point on a psychrometric chart represent one state of moist air once you know any two independent property at a given barometric pressure you know them all property symbol typical si unit what it tell you dry bulb temperature t c ordinary air temperature what a thermometer read wet bulb temperature twb c temperature of a wetted sensor reflect evaporative potential dew point temperature tdp c temperature at which moisture start to condense relative humidity rh vapour present compared with the maximum the air could hold at that temperature humidity ratio w g kg dry air actual mass of water vapour per kilogram of dry air specific enthalpy h kj kg dry air total heat content sensible plus latent specific volume v m kg dry air volume occupied by one kilogram of dry air in the mixture two of these deserve special attention humidity ratio also called moisture content often given in grain per pound in imperial unit 7 000 grain equal one pound is the true measure of how much water is in the air relative humidity change whenever the air is heated or cooled even if no moisture is added or removed dew point is directly tied to humidity ratio so it is the most useful single number for judging condensation risk on cold surface reading the chart the standard ashrae chart plot dry bulb temperature along the horizontal axis and hu"},{"k":"Guide","u":"/guides/refrigeration-cycle-basics-for-commercial-hvac/","t":"Refrigeration cycle basics for commercial HVAC","s":"Learn how the vapour compression cycle moves heat, what superheat, subcooling and lift mean, how efficiency is measured, and why refrigerant choice and safety codes matter.","nh":"hvac fundamental and load calculation the four main component following the refrigerant around the loop superheat and subcooling superheat subcooling expansion device compressor type lift and efficiency efficiency metric heat pump the same cycle in reverse refrigerant and safety frequently asked question why doe my rooftop unit lose capacity on very hot day can a system be charged by pressure alone what doe a2l mean key takeaway","nb":"nearly every commercial cooling system from a small rooftop unit to a large centrifugal chiller and every heat pump use the same basic process the vapour compression refrigeration cycle it move heat from a cold place to a warm place against the natural direction of heat flow by using a refrigerant that evaporate and condense at convenient temperature understanding the cycle help building owner make sense of efficiency rating help engineer select equipment and help technician diagnose problem this guide explain the component the key measurement and the factor that determine efficiency the four main component the cycle has four essential component connected in a closed loop evaporator low pressure liquid refrigerant absorb heat from the air or water being cooled and boil into vapour this is where useful cooling happen compressor draw in low pressure vapour and compresse it to a higher pressure and temperature this is where most of the energy input occur condenser high pressure hot vapour reject heat to outdoor air cooling tower water or another medium and condense back into liquid expansion device drop the pressure of the liquid refrigerant which lower its boiling temperature so it can absorb heat again in the evaporator the key idea is that a refrigerant boiling point depend on pressure at low pressure it boil at a low temperature absorbing heat from a cold space at high pressure it condense at a high temperature releasing heat to a warmer place following the refrigerant around the loop point in cycle state pressure temperature leaving evaporator entering compressor superheated vapour low cool leaving compressor entering condenser superheated vapour high hot leaving condenser entering expansion device subcooled liquid high warm leaving expansion device entering evaporator mixture of liquid and vapour low cold engineer visualize the cycle on a pressure enthalpy p h diagram which show how much heat is absorbed in the evaporator how much work the compressor add and how "},{"k":"Guide","u":"/guides/rules-of-thumb-in-hvac-sizing/","t":"Rules of thumb in HVAC sizing and why they fail","s":"Learn where common HVAC sizing rules of thumb come from, why they fail for modern buildings, the real costs of oversizing, and the proper role of benchmarks in design review.","nh":"hvac fundamental and load calculation common rule of thumb why they fail they average away the variable that matter building have changed climate vary ventilation is not proportional to floor area they compound safety margin the real cost of oversizing replacement project the biggest trap how to use rule of thumb properly a better process frequently asked question is 350 to 400 cfm per ton still a valid rule can a contractor size equipment without an engineer my building has alway been comfortable with its current equipment why change size key takeaway","nb":"every hvac trade has its rule of thumb so many square metre per tonne of cooling so many litre per second per square metre a pipe size per kilowatt they are quick easy to remember and often right enough to keep a project moving they are also a leading cause of oversized equipment humidity problem noise and wasted energy rule of thumb are not useless used properly they are a valuable check on a calculation used as a substitute for one they hide the variable that actually determine the load this guide explain why they fail and how to use them responsibly common rule of thumb rule of thumb typical form what it ignore cooling capacity per floor area m per tonne or w m glazing orientation occupancy ventilation climate heating capacity per floor area w m envelope quality airtightness ventilation height supply airflow per area l s per m cfm ft supply temperature load density zone type airflow per tonne about 165 to 190 l s per tonne 350 to 400 cfm per ton latent load supply temperature equipment design chiller per area kw per m load diversity building type plant configuration duct sizing by velocity fixed m s for main and branche pressure drop noise criteria system layout many of these originated decade ago when building had single pane or early double glazing fluorescent lighting little insulation and high plug load from cathode ray tube monitor modern building differ on nearly every count why they fail they average away the variable that matter a square metre rule assume a typical mix of glazing occupancy and internal load real building vary widely a densely occupied training room and a lightly occupied storage area of the same size can differ several fold in cooling load a west facing glass corner office and an interior office differ again building have changed led lighting laptop computer better glazing and improved insulation have reduced load substantially energy code such as necb 2017 and necb 2020 have tightened envelope lighting and equipment requirement rule cali"},{"k":"Guide","u":"/guides/selecting-outdoor-design-conditions-for-canadian-cities/","t":"Selecting outdoor design conditions for Canadian cities","s":"Learn where Canadian outdoor design data comes from, what the percentage values mean, and how to pick heating, cooling and dehumidification conditions that suit the building's risk.","nh":"hvac fundamental and load calculation two main data source nbc appendix c ashrae climatic design data what the percentage mean choosing heating condition choosing cooling condition matching condition to building risk local factor the table miss climate change and future condition frequently asked question why not design for the record low can i use ashrae data instead of nbc data which wet bulb should i use for cooling tower key takeaway","nb":"outdoor design condition are the weather value used to size heating and cooling equipment they are not the most extreme temperature ever recorded they are statistical value chosen so that equipment meet the load almost all of the time without being sized for a once in fifty year event choosing these value is one of the first decision in any hvac design and one of the most consequential pick value that are too mild and the building struggle on cold or hot day pick value that are too extreme and every piece of equipment pipe and duct is oversized this guide explain the canadian data source and how to choose sensibly two main data source nbc appendix c the national building code of canada division b appendix c provide climatic design data for a long list of canadian location for hvac the relevant value are january 2 5 and 1 design temperature for heating july 2 5 dry bulb and wet bulb temperature for cooling heating degree day below 18 c used for energy code compliance path and climate zone determination provincial code including the alberta building code bc building code ontario building code and quebec construction code use the same or closely aligned data the adopted edition vary by province so confirm which table apply to your permit ashrae climatic design data ashrae handbook fundamental publishe climatic design data for many canadian weather station mostly airport it offer more detail than the nbc heating dry bulb at 99 6 and 99 annual frequency cooling dry bulb with mean coincident wet bulb at 0 4 1 and 2 evaporation wet bulb design value with mean coincident dry bulb dehumidification design value dew point with coincident dry bulb extreme annual value and monthly design data what the percentage mean the percentage describe how often a value is exceeded but the two source use different time base which cause confusion data source value time base meaning nbc appendix c january 2 5 hour in january colder for about 2 5 of january hour nbc appendix c july 2 5 dry bul"},{"k":"Guide","u":"/guides/sensible-and-latent-heat/","t":"Sensible and latent heat: why the ratio matters","s":"Learn the difference between sensible and latent heat, how to calculate the sensible heat ratio, and why matching equipment to that ratio is the key to humidity control.","nh":"hvac fundamental and load calculation definition typical sensible heat ratio calculating sensible and latent load why the ratio matter for equipment equipment shr the oversizing trap reading the ratio on a psychrometric chart strategy for low shr space diagnosing humidity complaint frequently asked question can a unit remove too much moisture doe a lower thermostat setpoint fix humidity is relative humidity a good control variable key takeaway","nb":"every cooling load has two part sensible heat change the temperature of the air latent heat is the energy tied up in water vapour and it is removed only when moisture condense out of the air a space can be at the right temperature and still feel clammy if the latent load is not handled the balance between the two expressed as the sensible heat ratio determine what kind of equipment can serve a space well many humidity complaint in otherwise well sized building come from a mismatch between the space ratio and the equipment capability definition sensible heat is heat that raise or lower dry bulb temperature without changing moisture content solar gain lighting computer and conduction through wall are almost entirely sensible latent heat is heat associated with a phase change in hvac usually water evaporating or condensing people exhaling and perspiring cooking open water plant and humid outdoor air are latent source total heat is the sum of both the sensible heat ratio shr is shr sensible load total load an shr of 1 0 mean a purely sensible load an shr of 0 70 mean 30 of the cooling effort must go into removing moisture typical sensible heat ratio value vary with occupancy ventilation strategy and climate the range below are indicative for room load not including outdoor air and should be confirmed by calculation space type typical room shr range why data center or server room 0 95 to 1 0 it equipment is almost entirely sensible perimeter office 0 85 to 0 95 solar and lighting dominate interior office 0 80 to 0 90 people contribute a modest latent share classroom 0 65 to 0 80 high occupant density auditorium or theatre 0 55 to 0 75 very high occupant density commercial kitchen dining area 0 60 to 0 80 people plus food and cooking moisture indoor pool or ice arena can be well below 0 6 evaporation from water or very low dew point target when outdoor air is added the coil shr can drop further especially in humid summer climate such as southern ontario in much of alberta"},{"k":"Guide","u":"/guides/solar-heat-gain-through-glazing-and-how-to-control-it/","t":"Solar heat gain through glazing and how to control it","s":"Learn how solar radiation enters buildings through glazing, how to read window performance ratings, and which glazing, shading and control strategies reduce cooling loads and glare.","nh":"hvac fundamental and load calculation how solar heat enter window performance rating solar gain in load calculation controlling solar gain glazing selection exterior shading interior shading dynamic glazing window area comfort near window balancing heating and cooling in canada frequently asked question is a lower shgc alway better do interior blind reduce cooling load what is the difference between center of glass and whole window value key takeaway","nb":"glazing is the most powerful thermal element in most commercial envelope a window admit daylight and view but it also admit solar radiation that become heat inside the building in perimeter zone of glass heavy office solar heat gain is often the largest single cooling load and the main cause of comfort complaint the good new is that solar gain is highly controllable glazing selection shading and orientation can change perimeter load dramatically often for less cost than the hvac capacity needed to deal with the heat this guide explain the physic the rating and the practical option how solar heat enter solar radiation reaching a window is either reflected absorbed by the glass or transmitted directly into the room transmitted radiation passe through and is absorbed by floor furniture and wall which then heat the air absorbed radiation heat the glass and part of that heat flow inward by convection and radiation reflected radiation leave the building the total solar heat entering is the transmitted portion plus the inward flowing part of the absorbed portion this is captured by a single number the solar heat gain coefficient separately heat is also conducted through the glazing because of the indoor to outdoor temperature difference that conduction is described by the u value and is a separate component of the load window performance rating rating what it measure typical range for commercial glazing better is shgc solar heat gain coefficient fraction of incident solar energy that become heat inside about 0 20 to 0 60 lower for cooling higher for passive heating vt or vlt visible transmittance fraction of visible light transmitted about 0 30 to 0 70 higher for daylight within glare limit lsg light to solar gain ratio vt divided by shgc about 1 0 to 2 0 higher mean more light per unit of heat u value or u factor conductive heat transfer whole window vary with frame and glazing lower sc shading coefficient older metric relative to clear single glass approximately shgc div"},{"k":"Guide","u":"/guides/thermal-comfort-and-ashrae-standard-55/","t":"Thermal comfort and ASHRAE Standard 55","s":"Learn what ASHRAE Standard 55 requires, how comfort depends on more than air temperature, and how to use the standard to design, commission and troubleshoot commercial spaces.","nh":"hvac fundamental and load calculation the six factor of thermal comfort metabolic rate and clothing operative temperature the pmv and ppd model the adaptive comfort model local thermal discomfort humidity elevated air speed applying standard 55 in practice in design in commissioning and verification frequently asked question is ashrae standard 55 required by canadian code what temperature should an office be why do people near window complain more key takeaway","nb":"thermal comfort is the condition of mind that expresse satisfaction with the thermal environment that definition from ashrae standard 55 capture an important truth comfort is subjective two people in the same office can disagree about whether it is too warm the goal of hvac design is not to please everyone which is impossible but to create condition that a large majority find acceptable ashrae standard 55 thermal environmental condition for human occupancy is the main north american reference for defining those condition it is widely referenced in canadian design specification green building program and owner project requirement even though it is not generally mandated by the national building code this guide explain its key concept and how to apply them the six factor of thermal comfort standard 55 recognize that air temperature alone doe not determine comfort six factor interact factor type what it mean air temperature environmental dry bulb temperature of the air around the occupant mean radiant temperature environmental average temperature of surrounding surface weighted by exposure air speed environmental velocity of air moving past the occupant humidity environmental moisture content of the air metabolic rate personal heat generated by activity measured in met unit clothing insulation personal insulation of clothing measured in clo unit a space can have the right air temperature and still be uncomfortable because of cold window draft or direct sun understanding all six factor is the key to solving comfort complaint see hvac troubleshooting for hot and cold complaint metabolic rate and clothing one met is the metabolic rate of a seated quiet person typical office work is around 1 0 to 1 3 met clothing insulation for typical indoor clothing is often taken as around 0 5 clo in summer and around 1 0 clo in winter these personal factor explain why winter and summer comfort range differ and why dress code affect comfort as much as thermostat setting operative temper"},{"k":"Guide","u":"/guides/units-and-conversions-every-hvac-engineer-uses/","t":"Units and conversions every HVAC engineer uses","s":"A practical reference for the units and conversion factors used daily in Canadian HVAC work, with the core air and water heat equations and tips to avoid common unit mistakes.","nh":"hvac fundamental and load calculation airflow and velocity pressure power cooling and heating capacity energy water flow temperature envelope and heat transfer efficiency metric the core heat equation air side water side worked example avoiding unit error frequently asked question why is the sensible heat constant 1 23 in si is a ton the same as a tonne why doe the water equation use 500 key takeaway","nb":"canadian hvac work happen in two unit system at once code and drawing are in si but much equipment data manufacturer software rule of thumb and field habit are still imperial a single project can have airflow in litre per second on the drawing cfm on the fan schedule and ton on the chiller nameplate moving fluently between the two is a basic skill and unit error are a surprisingly common source of mistake this guide collect the conversion used most often explain the core heat transfer equation in both system and highlight where error tend to creep in factor are rounded to a practical number of significant figure airflow and velocity quantity conversion volumetric airflow 1 l s 2 119 cfm 1 cfm 0 4719 l s volumetric airflow 1 m s 1 000 l s 2 119 cfm volumetric airflow 1 m h 0 2778 l s 0 5886 cfm velocity 1 m s 196 9 fpm 1 fpm 0 00508 m s airflow per area 1 l s m 0 1968 cfm ft typical example 2 5 m s is about 500 fpm a handy approximation multiply l s by about 2 to get a rough cfm but use 2 119 for anything that matter pressure quantity conversion air system pressure 1 in w c inch of water column 249 pa air system pressure 1 pa 0 004015 in w c water system pressure 1 psi 6 895 kpa water head 1 ft of water 2 99 kpa 1 m of water 9 81 kpa water head 1 psi 2 31 ft of water atmospheric pressure 101 325 kpa 14 696 psi 29 92 in hg at sea level duct static pressure are often given in pa on drawing and in inche of water on fan curve pump head are typically in kpa or metre in si and in feet of head in imperial power cooling and heating capacity quantity conversion heat rate 1 w 3 412 btu h 1 btu h 0 2931 w heat rate 1 kw 3 412 btu h refrigeration 1 ton of refrigeration 12 000 btu h 3 517 kw boiler output 1 mbh 1 000 btu h 0 2931 kw mechanical power 1 hp 746 w 0 746 kw the ton of refrigeration originated as the rate of heat absorbed by melting one short ton of ice over 24 hour it remain the standard way chiller and rooftop unit are described in north america energy quantity conve"},{"k":"Guide","u":"/guides/zoning-a-commercial-building-for-hvac/","t":"Zoning a commercial building for HVAC","s":"Learn how to group spaces into thermal zones that can be controlled properly, how zoning affects comfort and energy use, and the mistakes that cause persistent hot and cold complaints.","nh":"hvac fundamental and load calculation why zoning matter perimeter and interior zone perimeter zone interior zone zoning by use and schedule how many zone zoning and system type thermostat and sensor placement common zoning mistake zoning in renovation frequently asked question how deep is a perimeter zone can one vav box serve several office why is an interior zone cooling in january key takeaway","nb":"a thermal zone is a space or group of space controlled by a single thermostat or temperature sensor every space in the zone get the same response from the hvac system if those space have similar load everyone is comfortable if they do not someone is alway too hot or too cold zoning is one of the most important decision in hvac design and one of the hardest to fix later it affect comfort energy use and first cost too few zone and comfort suffer too many and the building pay for terminal unit control and maintenance it doe not need this guide explain how to zone a commercial building sensibly why zoning matter load vary across a building in three way by exposure a south office receive strong solar gain while a north office doe not east and west zone peak at different time of day by depth perimeter space see envelope losse and solar gain interior space see only internal gain and often need cooling year round by use a conference room swing from empty to full a server room run a constant load a corridor has almost no load a single thermostat cannot satisfy space whose load move in different direction in winter a west perimeter office may need heat in the morning while an interior meeting room need cooling if both are on one zone one of them will be uncomfortable perimeter and interior zone the first division is between perimeter and interior perimeter zone perimeter zone are space adjacent to exterior wall typically extending about 4 to 5 m 12 to 15 ft in from the exterior wall this is the depth over which envelope and solar effect dominate each perimeter exposure north south east west should normally be a separate zone because each peak at a different time corner space with two exposure are often zoned separately or grouped with the more demanding exposure interior zone interior zone have no exterior exposure except possibly the roof on the top floor their load is mostly internal gain from people light and equipment so they typically need cooling whenever occupied even "},{"k":"Guide","u":"/guides/air-handling-unit-components-and-configurations/","t":"Air handling unit components and configurations","s":"Learn what each section of an air handling unit does, how common configurations compare, and what owners and designers should check for performance, freeze protection and maintenance.","nh":"air system and air distribution main component outdoor air return air and exhaust damper mixing box or plenum filter energy recovery preheat coil cooling coil and drain pan heating coil humidifier supply and return fan sound attenuator and discharge plenum casing typical component sequence configuration what to check during design and commissioning frequently asked question why do ahu coil freeze in canada should the final filter be before or after the fan how often should ahus be inspected key takeaway","nb":"an air handling unit ahu condition and move air for a building or part of one it bring in outdoor air mixe it with return air filter it heat or cool it sometime humidify or dehumidify it and pushe it through ductwork to the space it serve ahus range from small packaged unit to large custom built field erected unit serving entire hospital or campuse understanding the section of an ahu help owner make good decision on specification maintenance and replacement and help engineer anticipate problem such as freezing coil wet filter and poor airflow this guide walk through the main component and common configuration with particular attention to canadian winter condition main component outdoor air return air and exhaust damper damper control how much outdoor air enter how much return air is recirculated and how much is exhausted in an economizer arrangement the damper modulate to use cool outdoor air for free cooling low leakage damper with insulated blade and good seal are important in cold climate both for energy and to prevent coil freezing when unit are off see economizer type control and common failure mixing box or plenum the mixing section combine outdoor and return air poor mixing create layer of cold and warm air stratification that can freeze coil or trip freezestat even when the average mixed air temperature is above freezing blender baffle and careful damper arrangement help see mixing boxe stratification and freeze protection filter filter protect coil and fan from dirt and improve indoor air quality a common arrangement is a pre filter for example merv 8 followed by a final filter often merv 13 or higher ashrae standard 62 1 set minimum filtration requirement upstream of wetted surface such as cooling coil and many owner now specify merv 13 as a baseline for occupied building higher efficiency filter increase pressure drop which affect fan energy see filtration merv rating hepa and pressure drop energy recovery many ahus include an energy recovery device betwe"},{"k":"Guide","u":"/guides/chilled-beams-active-and-passive-systems/","t":"Chilled beams: active and passive systems","s":"Learn how active and passive chilled beams deliver cooling, why dew point control is essential, and which buildings and spaces suit chilled beam systems.","nh":"air system and air distribution passive chilled beam active chilled beam comparison condensation control the critical issue chilled water plant implication where chilled beam fit and where they do not design checklist frequently asked question do chilled beam need maintenance can chilled beam provide heating key takeaway","nb":"chilled beam cool space by circulating chilled water through a finned coil mounted at or in the ceiling they move much less air than all air system because water carry most of the cooling and water is far more effective than air at transporting heat that can mean smaller duct and air handler lower fan energy quiet operation and reduced floor to floor height chilled beam have been widely used in europe and are increasingly common in canadian office laboratory healthcare facility and higher education building this guide explain the difference between active and passive beam their limit and the design detail that matter most passive chilled beam a passive chilled beam is a coil inside a casing mounted at or above the ceiling with no ducted air connection warm room air rise to the beam is cooled as it passe over the coil become denser and fall back into the room cooling occur by natural convection characteristic no fan or primary air connection so they are silent and have no moving part cooling capacity is modest limited by natural convection require a separate system for ventilation dehumidification and heating need open ceiling area or perforated ceiling around the beam so air can circulate passive beam suit space with moderate sensible load and a separate source of ventilation such as a doa with displacement or ceiling outlet active chilled beam an active chilled beam is connected to a primary air supply usually from a dedicated outdoor air system primary air is discharged through nozzle inside the beam creating a high velocity jet that induce room air through the coil the mixed air primary plus cooled room air is discharged into the space through slot along the beam characteristic higher cooling capacity than passive beam because induction force airflow across the coil primary air provide ventilation and latent cooling can include a heating coil four pipe or use the same coil for heating and cooling with changeover two pipe discharge pattern is similar to a linear s"},{"k":"Guide","u":"/guides/constant-volume-vs-variable-air-volume-systems/","t":"Constant volume vs variable air volume systems","s":"Learn how constant volume and VAV systems control temperature, how they differ in energy use, comfort and complexity, and how to decide which suits a building or a retrofit.","nh":"air system and air distribution how constant volume system work single zone constant volume multi zone constant volume with reheat multizone and dual duct how vav system work comparison ventilation in vav system vav minimum airflow and reheat fan control and static pressure reset when constant volume still make sense converting cv to vav frequently asked question is vav alway more efficient than constant volume why are some vav zone too cold can a rooftop unit be vav key takeaway","nb":"all air hvac system control space temperature by delivering conditioned air there are two basic way to vary the cooling or heating delivered to a space change the temperature of the air while keeping the volume fixed or keep the temperature roughly fixed and change the volume the first is a constant volume cv system the second is a variable air volume vav system both remain common in canadian commercial building many older building have cv system often with reheat while vav has been the dominant approach for office and institutional building for decade understanding the difference matter when designing new building upgrading old one or troubleshooting comfort and energy problem how constant volume system work a cv system deliver a fixed airflow to each space temperature control come from changing the supply air temperature single zone constant volume a single unit serve one zone the thermostat cycle or modulate heating and cooling to vary supply temperature this is simple and effective for space such as gym auditorium small retail store and single room where one thermostat represent the whole space multi zone constant volume with reheat to serve multiple zone a cv system supply cold air to all zone and each zone has a reheat coil that warm the air as needed this give good zone control but is very energy intensive the system cool all the air and then reheat much of it energy code including necb restrict simultaneous heating and cooling which effectively limit new cv reheat system except in specific application multizone and dual duct older multizone unit mix hot and cold deck air at the unit for each zone dual duct system run separate hot and cold duct to mixing boxe at each zone both provide good zone control but mix heated and cooled air wasting energy many have been converted to vav over time how vav system work a vav system supply air at a relatively constant temperature typically around 12 to 14 c 54 to 57 f in cooling and vary the airflow to each zone using a v"},{"k":"Guide","u":"/guides/dedicated-outdoor-air-systems-doas/","t":"Dedicated outdoor air systems (DOAS) explained","s":"Learn what a DOAS is, how it separates ventilation from space conditioning, the main design choices, and how to make it work well in cold Canadian climates.","nh":"air system and air distribution how a doa differ from a conventional system typical doa component pairing doa with terminal system supply air temperature neutral or cold energy recovery in canadian climate controlling outdoor airflow design checklist frequently asked question is a doa alway more efficient than a mixed air system can a doa provide free cooling key takeaway","nb":"a dedicated outdoor air system or doa is a unit that bring in filter and condition 100 outdoor air and deliver it directly to the space separately from the equipment that heat and cool those space instead of one air handler doing everything the ventilation job and the space temperature job are split between two system doa has become a common approach in office school multi unit residential building and healthcare especially where the space conditioning is done by vrf fan coil chilled beam radiant system or water source heat pump this guide explain how it work where it fit and the design choice that matter most in canada how a doa differ from a conventional system in a conventional mixed air vav system outdoor air is mixed with return air in one air handler and the combined airflow is sized for the cooling load the amount of outdoor air reaching each zone depend on how much total air that zone receive which vary with load ashrae standard 62 1 account for this with the multiple zone system ventilation efficiency calculation which often require more outdoor air at the unit than the sum of zone requirement a doa deliver a known quantity of outdoor air to each zone regardless of the zone thermal load that give verified ventilation to each space which is easier to measure and balance smaller ventilation airflow because the doa move only outdoor air typically a fraction of what an all air system move decoupled latent control since the doa can be designed to dehumidify outdoor air and handle most of the building latent load smaller duct for the ventilation system often freeing ceiling space typical doa component a typical doa unit include outdoor air intake with damper and filtration often merv 8 prefilter and merv 13 final filter energy recovery device an enthalpy wheel sensible wheel fixed plate exchanger or run around glycol loop cooling coil chilled water or dx for dehumidification heating hot water electric gas or heat pump optional reheat which may use hot gas reheat "},{"k":"Guide","u":"/guides/diffuser-and-grille-selection-for-comfort-and-low-noise/","t":"Diffuser and grille selection for comfort and low noise","s":"A practical guide to choosing diffusers and grilles that mix air well, avoid drafts and stay quiet, including throw, ADPI, NC ratings and common mistakes.","nh":"air system and air distribution what a supply outlet has to do key selection term matching throw to the room throw too short throw too long the vav turndown problem heating from overhead noise getting nc right return and exhaust grille outlet type at a glance key takeaway","nb":"the diffuser is the only part of the air system most occupant ever notice when it is selected well people do not think about it at all when it is selected poorly they complain about draft stuffiness hot and cold spot or a constant hiss from the ceiling many comfort complaint that get blamed on the air handler or the control actually start at the outlet this guide cover how to select supply diffuser return grille and register so that the air mixe properly the space stay comfortable across the full range of airflow and noise stay within the target for the room what a supply outlet has to do a mixing type supply outlet has three job deliver the design airflow at an acceptable pressure drop mix supply air with room air before it reache the occupied zone so that people feel neither cold draft nor stagnant warm pocket stay quiet at design airflow within the room noise criterion the occupied zone is usually taken as the volume from the floor to about 1 8 m 6 ft high and about 0 6 m 2 ft in from wall consistent with ashrae standard 55 comfort depend mainly on air speed and temperature in that zone key selection term term meaning why it matter throw distance from the outlet to where the air jet slow to a stated terminal velocity usually 0 75 0 5 or 0 25 m s 150 100 or 50 fpm determine how far the air travel and whether it reache wall or collide with other jet characteristic length l distance from the outlet to the nearest wall or to the midpoint between outlet used to match throw to the space adpi air diffusion performance index percentage of point in the occupied zone meeting draft and temperature criteria a measure of mixing quality higher is better nc rating noise criterion of the outlet at a given airflow per manufacturer data must be below the room target after adding other source pressure drop total pressure required at the outlet affect fan energy and balance coanda effect tendency of a jet to attach to an adjacent surface such as a ceiling keep cool air at the ceilin"},{"k":"Guide","u":"/guides/displacement-ventilation-in-commercial-spaces/","t":"Displacement ventilation in commercial spaces","s":"Learn the principles of displacement ventilation, which spaces benefit most, the key design parameters and the limitations designers must plan around.","nh":"air system and air distribution how it work where displacement ventilation work well key design parameter supply air temperature supply velocity and outlet sizing vertical temperature gradient cooling capacity limit the ventilation benefit heating the main limitation energy consideration design procedure outline frequently asked question can displacement ventilation be used in an existing building is displacement ventilation good for infection control key takeaway","nb":"displacement ventilation supply cool air at low velocity near the floor and remove warm air near the ceiling instead of mixing the whole room to a uniform temperature it let fresh air pool across the floor rise around people and heat source and carry heat and contaminant upward and out the result is a room that is stratified on purpose cooler and cleaner at breathing level warmer near the ceiling used in the right space displacement ventilation can improve air quality in the breathing zone and reduce energy use used in the wrong space or designed like a mixing system it cause cold draft at the ankle and fail to heat this guide explain when and how to use it how it work every warm object in a room including people computer and light create a rising column of warm air called a thermal plume in a displacement system supply air enter through large low velocity outlet near the floor a few degree cooler than the room the cool air spread across the floor as a thin layer thermal plume draw this air upward around heat source including around occupant body bringing fresh air to the breathing zone warm contaminated air rise above the occupied zone and form a warmer upper layer return or exhaust air is taken from at or near the ceiling the height at which the upward plume flow equal the supply airflow is often called the stratification height below it air is relatively clean above it air is warmer and more contaminated a good design keep this height above the breathing zone of occupant where displacement ventilation work well space type why it suit displacement consideration classroom high occupant density ventilation driven load high ceiling wall space for outlet heating strategy needed theatre and auditorium tall space seated occupant low noise need under seat or riser outlet common place of worship and atria very tall volume where only the lower zone need conditioning upper zone heat can be left unconditioned restaurant and cafeteria heat and odour source benefit from upward"},{"k":"Guide","u":"/guides/duct-design-methods-equal-friction-static-regain-and-more/","t":"Duct design methods: equal friction, static regain and more","s":"A practical comparison of the main duct sizing methods used in commercial HVAC, with typical design values and guidance on choosing the right method for a project.","nh":"air system and air distribution what every method is trying to do equal friction method strength weaknesse static regain method strength weaknesse velocity reduction method t method and optimization approache comparing the method practical velocity and noise limit a practical design procedure frequently asked question which method should a typical office vav system use doe the method affect balancing key takeaway","nb":"duct sizing decide how much a building pay to move air for the next 30 year undersized duct push fan pressure energy and noise up oversized duct waste ceiling space sheet metal and money and can make low flow control harder the duct design method is the set of rule a designer use to turn airflow requirement into duct dimension there is no single correct method each one trade simplicity against accuracy and first cost against operating cost this guide explain the common method the typical value behind them and how to pick one for a given system what every method is trying to do all duct design method solve the same problem deliver the design airflow to every outlet while keeping total pressure loss noise and cost reasonable the total pressure a fan must overcome in a branch is the sum of friction losse in straight duct which depend on velocity duct size length and surface roughness dynamic fitting losse at elbow transition takeoff damper and terminal calculated using loss coefficient from the ashrae duct fitting database or the ashrae handbook fundamental component losse for coil filter terminal unit sound attenuator and diffuser taken from manufacturer data the critical path sometime called the index run is the path from the fan to the outlet with the highest total pressure requirement the fan is selected for that path and every other branch has surplus pressure that must be absorbed by balancing damper or terminal unit a good design keep that surplus small which reduce both damper throttling and noise equal friction method equal friction is the most widely used method for low and medium pressure system the designer pick a constant friction rate then size every section of duct to hit that rate at its airflow typical friction rate for commercial supply duct fall in the range of about 0 8 to 1 2 pa m roughly 0 1 to 0 15 in w c per 100 ft lower rate give larger duct and lower fan energy many designer now aim toward the lower end because energy code such as necb 2020 an"},{"k":"Guide","u":"/guides/duct-sealing-classes-and-smacna-leakage-standards/","t":"Duct sealing classes and SMACNA leakage standards","s":"Understand SMACNA duct seal classes and leakage classes, how allowable leakage is calculated, and how to specify and verify duct sealing on commercial projects.","nh":"air system and air distribution the two key smacna document seal classe pressure classe leakage classe and the leakage factor why it matter energy airflow and comfort critical space energy code requirement writing a duct sealing and testing specification how testing work in brief frequently asked question doe sealing all duct to seal class a guarantee low leakage how much of the ductwork should be tested key takeaway","nb":"duct leakage is invisible once the ceiling is closed but it cost energy every hour the fan run leaky supply duct deliver less air to the space they serve forcing fan to work harder leaky return or exhaust duct can draw air from unwanted place in critical facility leakage can compromise pressure relationship and contamination control the sheet metal and air conditioning contractor national association smacna publishe the standard most often used in north america to specify duct sealing and test leakage this guide explain seal classe leakage classe and how they fit together in a specification the two key smacna document smacna hvac duct construction standard metal and flexible define duct construction by pressure class and set out seal classe describing which joint and seam must be sealed smacna hvac air duct leakage test manual define leakage classe and the method for testing ductwork for leakage recent edition of the duct construction standard call for all duct to be sealed to seal class a by default regardless of pressure class a change from older edition in which lower pressure duct could have lower seal classe specification still often reference seal classe so it is worth understanding them confirm which edition is cited in the project specification seal classe seal classe describe what must be sealed seal class what must be sealed class a all transverse joint longitudinal seam and duct wall penetration class b all transverse joint and longitudinal seam class c transverse joint only transverse joint connect section of duct longitudinal seam run along the length of each section wall penetration include rod screw pipe and fitting passing through the duct wall sealing is done with mastic gasket approved tape or a combination product must be compatible with the duct material and pressure and must meet flame spread and smoke developed requirement under can ulc s102 where required by the nbc or provincial code pressure classe smacna duct construction is organized by st"},{"k":"Guide","u":"/guides/duct-static-pressure-and-how-to-reduce-it/","t":"Duct static pressure and how to reduce it","s":"Learn what static, velocity and total pressure mean in a duct system, how to diagnose high static pressure, and which fixes deliver real reductions in fan energy and noise.","nh":"air system and air distribution static velocity and total pressure how static pressure is measured typical cause of high static pressure why it matter fan energy and the fan law way to reduce static pressure fix the component first correct fan system effect lower and reset the duct static setpoint remove avoidable resistance address design bottleneck a short diagnostic sequence frequently asked question what is a normal external static pressure for a rooftop unit will reducing static pressure reduce airflow key takeaway","nb":"static pressure is one of the most useful number in an air system it tell you how hard the fan is working whether the ductwork and component are causing excessive resistance and often why a system is noisy short on airflow or expensive to run many existing building operate with static pressure well above what the original design intended and some of that resistance can be removed at modest cost this guide explain the term how static pressure is measured the usual cause of high reading and the fixe that make a measurable difference static velocity and total pressure air in a duct carry two kind of pressure static pressure is the pressure exerted equally in all direction pushing outward on the duct wall it is what the fan must create to overcome resistance velocity pressure is the pressure due to the air motion it depend only on velocity and air density for standard air velocity pressure in pascal is roughly 0 6 time the velocity in m s squared total pressure is the sum of the two total pressure alway drop in the direction of airflow because of friction and fitting losse static pressure can rise along a duct when air slow down as velocity pressure convert back to static this is called static regain and it is why static pressure alone can be misleading if reading are taken at point with very different velocity fan performance is usually rated in total static pressure tsp or external static pressure esp external static pressure is the resistance outside the packaged unit such as ductwork diffuser and accessory and is the number most rooftop unit and fan coil manufacturer ask for how static pressure is measured static pressure is measured with a manometer usually a digital differential pressure gauge connected to a static pressure tip or a probe inserted through a small hole in the duct reading are taken perpendicular to the airflow in straight duct away from fitting where possible a typical air handler survey include static pressure at the unit inlet return or mixed air"},{"k":"Guide","u":"/guides/economizers-types-controls-and-common-failures/","t":"Economizers: types, controls and common failures","s":"Learn the types of economizers, how high-limit controls decide when to use outdoor air for cooling, and how to find and fix the failures that quietly waste energy.","nh":"air system and air distribution airside economizer waterside economizer energy code requirement high limit control common failure finding economizer problem canadian winter consideration frequently asked question should economizer run in winter how often should economizer be checked key takeaway","nb":"an economizer use cool outdoor air or cool water from a cooling tower or dry cooler to cool a building instead of running mechanical refrigeration in most canadian city outdoor condition are cool enough for a large share of the year that economizer can provide substantial free cooling particularly in interior zone that need cooling even in winter economizer are also among the most failure prone part of an hvac system stuck damper failed sensor and bad control setting are very common and many go unnoticed because the building stay comfortable while the energy is wasted this guide cover how economizer work how they are controlled and how they fail airside economizer an airside economizer modulate outdoor air return air and relief damper on an air handler or rooftop unit when outdoor air is cool enough the outdoor air damper open beyond its minimum ventilation position the return damper close and the relief damper or fan remove the excess air operation typically follow this sequence economizer only outdoor air damper modulate to maintain the mixed or supply air temperature setpoint mechanical cooling is off integrated economizer when outdoor air alone cannot meet the setpoint mechanical cooling run while outdoor damper stay fully open minimum outdoor air when outdoor air is warmer or more humid than return air the economizer is locked out and damper return to minimum ventilation position integrated operation where the economizer and mechanical cooling can run at the same time give significantly more saving than non integrated design which lock out the economizer once compressor start necb and ashrae 90 1 generally require integrated economizer on system that require economizer at all waterside economizer a waterside economizer use a heat exchanger to cool chilled water with condenser water from a cooling tower or with glycol from a dry cooler bypassing the chiller it is common in building with chilled water plant data center and system where airside economizer are impr"},{"k":"Guide","u":"/guides/exhaust-system-design-for-commercial-buildings/","t":"Exhaust system design for commercial buildings","s":"A practical overview of commercial exhaust systems: required exhaust rates, fan types and locations, discharge and re-entrainment, makeup air and code requirements.","nh":"air system and air distribution type of exhaust system setting exhaust rate washroom and general space kitchen garage laboratory fan type and placement locating fan at the end of the system common fan type discharge location and re entrainment makeup air and building pressure energy recovery from exhaust ductwork balancing and verification key takeaway","nb":"exhaust system remove air that should not be recirculated odour from washroom moisture from shower grease from kitchen vehicle fume from garage chemical from lab and heat from equipment room they also drive building pressure and air movement so a poorly designed exhaust system can cause problem well beyond the room it serve this guide cover the main type of commercial exhaust how exhaust rate are set fan and discharge consideration makeup air and the canadian code context type of exhaust system system purpose key requirement general and toilet exhaust remove odour and moisture from washroom janitor room change room rate from ashrae 62 1 or local code continuous during occupancy commercial kitchen exhaust remove grease heat and smoke from cooking nfpa 96 listed hood grease duct fire suppression parking garage exhaust control co and no2 nbc and provincial requirement gas detection laboratory exhaust remove hazardous fume from fume hood and lab ansi assp z9 5 csa z316 5 high discharge velocity process and equipment exhaust heat dust or fume from industrial processe acgih guidance capture velocity electrical and mechanical room exhaust heat removal refrigerant leak ventilation csa b52 for refrigeration machinery room dryer and specialty exhaust lint moisture specific contaminant manufacturer requirement code limit on duct length setting exhaust rate washroom and general space ashrae standard 62 1 include minimum exhaust rate for space such as public toilet private toilet janitor closet and locker room typical value for public toilet are in the order of 25 l s 50 cfm per water closet or urinal with alternative minimum for continuous versus intermittent operation provincial code and the nbc reference ventilation standard in different way so the governing value depend on the jurisdiction see ashrae standard 62 1 ventilation rate procedure kitchen kitchen hood exhaust rate depend on the hood type the cooking appliance light medium heavy or extra heavy duty and hood listing "},{"k":"Guide","u":"/guides/fan-arrays-and-fan-wall-technology/","t":"Fan arrays and fan wall technology","s":"Learn how fan arrays replace a single large fan with multiple smaller direct-drive fans, the benefits and trade-offs, and what to consider when designing or retrofitting.","nh":"air system and air distribution how a fan array work benefit redundancy shorter air handler efficiency maintenance and replacement acoustic benefit more uniform airflow trade off and limitation sizing and selection control retrofitting existing air handler frequently asked question doe a fan array alway save energy what happen if multiple fan fail key takeaway","nb":"a fan array often called a fan wall replace one or two large fan in an air handling unit with a grid of smaller direct drive plenum fan each fan typically has its own motor often an ec motor or a premium efficiency motor on a variable frequency drive together they deliver the same airflow and pressure as a single large fan fan array have become common in new air handler for office hospital laboratory and data center and as retrofit in older unit where a large belt driven fan has reached the end of its life this guide explain the advantage the limitation and the design point that matter how a fan array work multiple identical fan are mounted in a wall across the air handler cross section each discharging into a common plenum because the fan operate in parallel their airflow add while the pressure stay the same for example nine fan each delivering one ninth of the design airflow at the full system pressure combine to meet the design point most fan array use plenum plug fan which are unhoused centrifugal fan that pressurize the surrounding plenum direct drive plenum fan eliminate belt pulley and bearing on a separate shaft benefit redundancy if one fan fail in an array the remaining fan can speed up to compensate often maintaining full or near full airflow depending on how much spare capacity was designed in designer sometime add one extra fan n 1 so that design airflow is maintained with a fan out of service for critical facility such as hospital data center and laboratory this is a major advantage over a single fan where a failure mean total loss of airflow each fan typically has a backdraft damper or a blank off arrangement to prevent recirculation through a failed fan without this air can flow backward through the failed fan and reduce delivered airflow significantly shorter air handler smaller fan require less depth for airflow to develop and for uniform discharge a fan array section can be considerably shorter than a single large plenum or housed fan section whic"},{"k":"Guide","u":"/guides/fan-coil-units-in-commercial-buildings/","t":"Fan coil units in commercial buildings","s":"An overview of fan coil units: configurations, two-pipe and four-pipe piping, how to provide ventilation, and the design and maintenance issues that affect comfort and cost.","nh":"air system and air distribution unit configuration two pipe and four pipe system two pipe four pipe pipe and valve consideration providing ventilation fan coil fan motor noise condensate management maintenance planning control frequently asked question are fan coil more efficient than vav can existing two pipe system be improved key takeaway","nb":"a fan coil unit is a small air handler serving one room or zone it contain a fan a coil supplied with chilled water hot water or both a filter and a drain pan and it recirculate room air through the coil to heat or cool the space fan coil are common in hotel condominium and apartment office hospital and school especially where a central plant already supply chilled and hot water fan coil give each room independent temperature control without the large duct of an all air system they also bring maintenance obligation hundred of small fan filter drain pan and valve spread throughout a building this guide cover the main type piping arrangement ventilation strategy and the practical issue owner should plan for unit configuration type description typical application vertical exposed floor mounted cabinet often under a window older office hotel school vertical concealed installed in a wall chase or closet condominium apartment vertical stack hi rise unit with integral riser stacked floor to floor high rise residential and hotel horizontal concealed above ceiling ducted to one or more diffuser office hotel corridor and room ceiling cassette recessed in ceiling with integral grille retail office retrofit horizontal ducted unit allow more flexible air distribution while vertical exposed unit are easier to service but take floor space two pipe and four pipe system two pipe a two pipe system has one supply and one return pipe to each unit the whole system or each zone is switched between chilled water in summer and hot water in winter two pipe system are cheaper to install but they cannot provide heating in one room and cooling in another at the same time changeover is the main weakness in canadian shoulder season sunny south facing room may need cooling while north room need heat switching the whole loop take time since a large mass of water must change temperature and frequent changeover waste energy some building add electric heat to the unit to cover shoulder season which r"},{"k":"Guide","u":"/guides/fan-laws-and-how-to-apply-them/","t":"Fan laws and how to apply them","s":"Learn the fan affinity laws, how to use them to predict fan performance after speed or density changes, and why real VAV systems save less energy than the cube law suggests.","nh":"air system and air distribution the basic fan law applying the law worked example example 1 increasing airflow during balancing example 2 estimating vfd saving example 3 density correction the system curve where the fan law break down system with a fixed pressure component changing system resistance fan efficiency change motor and drive efficiency diameter law need similar fan using the fan law in the field fan law and energy strategy frequently asked question doe halving fan speed cut power by 87 5 do the fan law apply to pump can i use the fan law to compare two different fan key takeaway","nb":"the fan law also called fan affinity law describe how a fan airflow pressure and power change when its speed size or the density of the air change they are among the most used tool in hvac for predicting the effect of a sheave change estimating saving from a variable frequency drive correcting for altitude or adjusting a system during balancing they are also frequently misapplied the law are exact only for geometrically similar fan operating at the same point of rating on a fixed system curve real system often violate those condition this guide explain the law show how to use them and highlight where they break down the basic fan law for a given fan operating on a fixed system same ductwork same damper position with constant air density change airflow q pressure p power w speed n q2 q1 n2 n1 p2 p1 n2 n1 2 w2 w1 n2 n1 3 wheel diameter d similar fan same speed q2 q1 d2 d1 3 p2 p1 d2 d1 2 w2 w1 d2 d1 5 air density rho same speed q unchanged p2 p1 rho2 rho1 w2 w1 rho2 rho1 in word airflow vary directly with speed pressure vary with the square of speed power vary with the cube of speed a 20 speed reduction give 80 of the airflow 64 of the pressure and about 51 of the power that cube relationship is why variable speed fan save so much energy applying the law worked example example 1 increasing airflow during balancing a supply fan deliver 4 000 l s about 8 480 cfm at 900 rpm against 500 pa 2 0 in w c of total static pressure using 3 0 kw at the shaft the balancer find the system need 4 400 l s a 10 increase new speed 900 x 4 400 4 000 990 rpm new pressure 500 x 990 900 2 about 605 pa new power 3 0 x 990 900 3 about 4 0 kw a 10 airflow increase require about 33 more power before changing sheave check that the motor has enough capacity that the fan is within its maximum safe speed and that the new operating point is in a stable region of the fan curve example 2 estimating vfd saving a fan run at reduced speed for much of the year at 70 speed ideal power is 0 7 3 or about 34"},{"k":"Guide","u":"/guides/fan-selection-curves-efficiency-and-system-effect/","t":"Fan selection: curves, efficiency and system effect","s":"Learn how to read fan and system curves, choose an efficient fan type and operating point, and avoid the installation details that rob fans of performance.","nh":"air system and air distribution reading a fan curve the system curve and operating point fan type selecting the operating point stay to the right of the peak select near peak efficiency consider the whole operating range efficiency metric feg and fei system effect common cause accounting for system effect drive and motor selection checklist frequently asked question why doe a new fan not deliver design airflow is a bigger fan more efficient what is surge key takeaway","nb":"fan are the heart of every air system and they are often among the largest energy user in a commercial building a well selected fan run quietly and efficiently across its operating range a poorly selected fan waste energy make noise surge or fail to deliver its design airflow sometime all of these at once fan selection is more than picking a model that meet the design airflow and pressure it involve understanding fan curve choosing the right fan type operating near peak efficiency and accounting for how the installation affect performance this guide cover each of these reading a fan curve a fan curve show how a fan perform at a given speed the main curve are pressure versus airflow as airflow increase the pressure the fan can develop generally decrease power versus airflow show the brake power required at each point efficiency versus airflow show where the fan convert shaft power to air power most effectively multi rating chart show these at several speed with line of constant efficiency or power overlaid fan curve are based on laboratory test under ideal inlet and outlet condition typically performed to amca standard 210 ansi ashrae 51 real installation rarely match these condition which is where system effect come in the system curve and operating point the system curve show the pressure the ductwork coil filter damper and terminal require at each airflow for fixed ductwork pressure rise roughly with the square of airflow the operating point is where the fan curve and system curve intersect if the actual system pressure is higher than calculated the fan deliver less airflow than design if lower it deliver more field balancing then adjust fan speed to reach design airflow see fan law and how to apply them fan type fan type typical application characteristic forward curved centrifugal small ahus fan coil residential equipment compact and quiet at low pressure lower efficiency power rise with airflow so motor can overload backward inclined and airfoil centrifugal med"},{"k":"Guide","u":"/guides/hvac-noise-and-vibration-control/","t":"HVAC noise and vibration control","s":"Learn where HVAC noise and vibration come from, how they travel to occupied spaces, what targets to design for and the most effective ways to control them.","nh":"air system and air distribution source path and receiver noise criteria major noise source fan airflow in duct terminal unit compressor pump and tower transmission path and control measure duct borne noise duct breakout structure borne noise and vibration airborne noise through construction vibration isolation diagnosing an existing noise problem frequently asked question why is low frequency noise so hard to control do vfd make noise key takeaway","nb":"noise is one of the most common complaint about hvac system and one of the hardest to fix after construction a rumble from a rooftop unit a hiss from a diffuser or a hum transmitted through the structure can make an otherwise well performing system unacceptable to occupant most hvac noise problem are predictable and can be avoided in design at relatively low cost this guide explain the source and transmission path of hvac noise the criteria used to set target and the practical measure for controlling noise and vibration in new and existing building source path and receiver every noise problem has three part source fan compressor pump cooling tower vav boxe damper diffuser and turbulent airflow path how sound travel from the source to the listener through ductwork through wall and floor or through the structure as vibration receiver the occupant whose sensitivity depend on the space type and activity control can happen at any point but it is usually most effective and cheapest at the source and along the main path noise criteria room noise from hvac is usually evaluated with one of the following rating method described in the ashrae handbook hvac application nc noise criteria the most widely used based on octave band sound pressure level compared with a set of curve rc room criteria and rc mark ii also consider the spectral balance identifying rumble too much low frequency or hiss too much high frequency dba a single a weighted number simple but less useful for diagnosing hvac noise because it underweight low frequency typical hvac background noise design target space type typical nc range concert hall recording studio nc 15 to 20 theatre large conference room nc 20 to 30 private office classroom patient room nc 25 to 35 open plan office nc 35 to 40 lobby corridor nc 35 to 45 retail cafeteria nc 35 to 45 gymnasium kitchen nc 40 to 50 these are typical range drawn from ashrae guidance project target should be agreed with the owner and for school and healthcare checked"},{"k":"Guide","u":"/guides/mixing-boxes-stratification-and-freeze-protection/","t":"Mixing boxes, stratification and freeze protection","s":"Learn why air streams fail to mix in air handlers, how this leads to frozen coils and freezestat trips, and the design, control and operating practices that prevent it.","nh":"air system and air distribution what a mixing box doe why air stream stratify how coil freeze design measure improve mixing preheat and glycol circulation pump and minimum flow chilled water coil in winter control measure freezestat and low limit sensor mixed air low limit control sequence operating practice diagnosing stratification in an existing unit key takeaway","nb":"in much of canada outdoor air in winter can be colder than 30 c 22 f when that air enter an air handler and is not properly mixed with warmer return air cold stream can travel straight to heating and cooling coil the result is frozen and burst coil freezestat trip that shut down unit on the coldest night and expensive water damage frozen coil are one of the most common and costly air handler failure in canadian building most are preventable this guide explain why stratification happen how freezing occur and what designer contractor and operator can do about it what a mixing box doe a mixing box or mixing plenum is the section of an air handler where outdoor air and return air meet the goal is to produce a uniform mixed air temperature across the full face of the downstream filter and coil if the outdoor air fraction is 30 and the outdoor air is 20 c while return air is 22 c the ideal mixed temperature is about 9 c if mixing is poor part of the coil face may see air much colder than that average why air stream stratify cold outdoor air is denser than warm return air left to itself cold air tend to sink and flow along the bottom of the plenum while warm air stay at the top several design feature make this worse outdoor and return damper on adjacent face at right angle that do not direct the stream into each other short mixing distance between the damper and the first coil or filter parallel blade damper that direct air in one direction sending stream along a wall low velocity through the mixing section which reduce turbulence large outdoor air fraction especially in economizer mode or 100 outdoor air unit oversized damper operating barely open creating jet stratification can produce temperature difference of many degree across a coil face an average mixed air reading that look safe can hide a band of sub zero air along the bottom of the coil how coil freeze water expand as it freeze in a coil tube ice form first where air is coldest and water flow is lowest trapped wa"},{"k":"Guide","u":"/guides/return-air-plenums-benefits-risks-and-code-limits/","t":"Return air plenums: benefits, risks and code limits","s":"Learn the advantages of ceiling return plenums, the combustibility and fire separation rules that govern them in Canada, and the common performance problems to avoid.","nh":"air system and air distribution why designer use return plenum code limit in canada combustibility of material in the plenum fire separation smoke control interaction performance risk negative pressure and envelope leakage where plenum should not be used a practical review procedure for existing building frequently asked question can tenant run any data cable in a return plenum are ducted return alway better key takeaway","nb":"a return air plenum use the space above a suspended ceiling or occasionally below a raised floor as the path for return air back to the air handler instead of ducting every return grille air passe through opening in the ceiling into the plenum and travel to a few central return duct connection or shaft ceiling return plenum are common in canadian office retail and institutional building because they save cost and ceiling space they also bring real constraint what material can be in the plenum how the plenum interact with fire separation and how well air actually find its way back this guide cover the benefit the risk and the code limit why designer use return plenum lower first cost less return ductwork fewer fitting and less labour lower pressure drop a large plenum offer very little resistance reducing return fan or supply fan pressure ceiling space the space otherwise taken by return duct is available for other service flexibility tenant fit out can add or move return grille without reworking ductwork heat removal from lighting some of the heat from recessed light fixture goe directly into the return air instead of the room reducing room cooling load slightly code limit in canada requirement for plenum come mainly from the national building code of canada nbc part 3 and part 6 the provincial code that adopt or modify it and the standard they reference exact wording differ between edition and province so the design team should confirm requirement with the authority having jurisdiction the following theme are consistent combustibility of material in the plenum in building required to be of noncombustible construction the nbc limit combustible material exposed in a ceiling space used as a plenum typical consequence include electrical and communication cable in the plenum must have an appropriate flame spread and smoke rating in canada this is commonly the ft6 rating csa c22 2 no 0 3 horizontal flame and smoke test or cable must run in noncombustible raceway plastic "},{"k":"Guide","u":"/guides/underfloor-air-distribution-design/","t":"Underfloor air distribution design","s":"An overview of underfloor air distribution (UFAD): how it works, its benefits and risks, key design parameters and the details that decide whether a system performs.","nh":"air system and air distribution how ufad work benefit risk and common problem plenum leakage thermal decay key design parameter load calculation difference perimeter zone in canadian climate commissioning consideration frequently asked question doe ufad save energy is ufad suitable for retrofit key takeaway","nb":"underfloor air distribution usually called ufad deliver conditioned air through a pressurized plenum under a raised access floor and into the space through floor diffuser air rise through the occupied zone pick up heat and contaminant and is returned at or near the ceiling most ufad system are used in office though they also appear in some institutional and educational building ufad can provide good comfort flexibility for changing layout and some energy benefit it also has a reputation for problem when the detail are not handled carefully this guide cover how the system work what drive its performance and how to avoid the common pitfall how ufad work a raised access floor typically 300 to 450 mm 12 to 18 in deep create a plenum above the structural slab an air handler supply air into this plenum either through duct that discharge into the plenum or directly through floor opening near the shaft the plenum is kept at a low positive pressure typically around 12 to 25 pa 0 05 to 0 1 in w c and air leave through floor diffuser unlike overhead mixing system ufad aim for partial stratification supply air at a moderate temperature fill the lower part of the room and warmer air collect above the occupied zone where it is returned the occupied zone is conditioned but the upper part of the room is allowed to run warmer ufad sit between fully mixed overhead system and displacement ventilation floor diffuser introduce air with more velocity than displacement outlet so there is more mixing near the floor but heat from light and other overhead source is still largely kept above the occupied zone see displacement ventilation in commercial space for the related approach benefit layout flexibility floor diffuser can be relocated when furniture or partition move and the raised floor carry power and data cabling higher supply air temperature supply air at around 16 to 18 c 61 to 64 f instead of 13 c 55 f extend economizer hour and can improve chiller efficiency lower fan pressure the "},{"k":"Guide","u":"/guides/vav-box-types-and-selection/","t":"VAV box types and selection","s":"Learn the main VAV terminal unit types, how to choose between them, and how to size boxes for controllability, low noise and efficient minimum airflows.","nh":"air system and air distribution main vav box type single duct cooling only single duct with reheat fan powered sery fan powered parallel dual duct induction unit comparing box type pressure independent control selecting box size minimum airflow setting noise installation and commissioning frequently asked question what is the most common vav box problem should i use sery or parallel fan powered boxe can vav minimum be lowered in an existing building key takeaway","nb":"a vav terminal unit usually called a vav box is the device that control airflow to each zone in a variable air volume system it contain a damper an airflow sensor a controller and often a reheat coil or fan the box respond to the zone thermostat opening to deliver more cool air when the space is warm and closing to a minimum airflow when it is cool vav boxe look simple but their selection affect comfort noise energy use and ventilation oversized boxe cannot measure low airflow accurately undersized boxe are noisy and waste fan energy this guide explain the main type and how to select them well main vav box type single duct cooling only the simplest type a damper and airflow sensor in a single inlet it serve interior zone that need only cooling when the load drop airflow drop to the minimum single duct with reheat the same box with a hot water or electric heating coil on the discharge it serve perimeter zone or any zone that may need heat when the zone need heat airflow is held at a minimum or modestly increased while the coil heat the air this is the most common vav box in canadian building fan powered sery a small fan in the box run continuously whenever the zone is occupied drawing return air from the ceiling plenum and mixing it with primary air from the ahu the fan deliver a constant airflow to the space while the primary air damper vary constant airflow to the space improve air distribution and reduce dumping at low load allow lower primary air temperature in some design the fan run continuously adding fan energy and noise at the box fan powered parallel a fan in the box run only when the zone need heat in cooling primary air flow through the damper alone in heating the fan draw warm plenum air heated by light and other gain to provide heat before or along with a reheat coil use recovered plenum heat reducing reheat energy fan run only part of the time saving energy compared with sery boxe space airflow vary so diffuser selection must consider low airflow dual "},{"k":"Guide","u":"/guides/air-and-dirt-separation-in-hydronic-systems/","t":"Air and dirt separation in hydronic systems","s":"Learn where air and dirt in hydronic systems come from, the equipment that removes them, and how location and pressure decide whether that equipment actually works.","nh":"hydronic system where air come from where dirt come from air removal equipment locating the air separator dirt removal equipment flushing and cleaning new system sign of trouble in existing system frequently asked question should i install automatic air vent everywhere is a magnetic separator worth it key takeaway","nb":"closed hydronic loop are supposed to be clean airless and stable in practice every new system start full of air and construction debris and many existing system carry a steady load of entrained air magnetite and scale for year the result are familiar to any facility manager gurgling terminal cold radiator at the top of the building noisy pump stuck control valve and coil that lose capacity air and dirt separation equipment is inexpensive relative to the system it protect getting it right is mostly about understanding where air and dirt come from and putting the right device in the right place where air come from air enter a hydronic system in three form free air pocket trapped at high point during filling entrained bubble carried along with flowing water dissolved air held in solution invisible until temperature rise or pressure fall the amount of air water can hold in solution decrease as temperature rise and as pressure fall a relationship described by henry law that is why air tend to come out of solution in boiler and at the top of building and why the best place to remove it is the point in the system with the highest temperature and lowest pressure ongoing source of new air include makeup water fresh water carry dissolved oxygen and nitrogen leak at high point where pressure fall below atmospheric and automatic air vent that let air in when system pressure at their location is too low correct expansion tank placement and system pressurization is the first line of defence where dirt come from construction debris welding slag pipe dope cutting chip sand corrosion product mostly magnetite black iron oxide and hematite red rust produced when oxygen react with steel piping scale from hard makeup water biological growth and degraded glycol in poorly maintained system fine magnetite particle are a particular nuisance they are magnetic abrasive and small enough to pass through ordinary strainer and they accumulate in pump motor with wet rotor in control valve seat and"},{"k":"Guide","u":"/guides/chilled-water-system-design-fundamentals/","t":"Chilled water system design fundamentals","s":"A foundation guide to chilled water systems covering supply temperatures, delta T, flow arrangements, piping, coils and controls, with notes on Canadian practice.","nh":"hydronic system main component supply temperature and delta t supply temperature delta t pumping arrangement constant primary flow primary secondary variable primary flow piping design coil selection control valve pump control free cooling in canadian climate plant control and sequencing frequently asked question is a higher delta t alway better should chilled water system use glycol key takeaway","nb":"a chilled water system produce cold water at a central plant and distribute it to coil in air handler fan coil chilled beam or process equipment chilled water is the dominant cooling approach in large commercial institutional and data center building because water carry heat efficiently over long distance and allow plant equipment to be centralized maintained and optimized good chilled water design come down to a handful of decision supply temperature temperature difference pumping arrangement piping layout coil selection and control this guide explain each and how they interact main component chiller produce chilled water using a refrigeration cycle type include centrifugal screw scroll and absorption either water cooled or air cooled heat rejection cooling tower fluid cooler or air cooled condenser pump circulate chilled water and condenser water distribution piping supply and return main riser and branche terminal unit coil in air handler fan coil chilled beam crah and process heat exchanger control valve sensor vfd and the plant control system accessory expansion tank air separator dirt separator chemical treatment and makeup supply temperature and delta t supply temperature conventional comfort system often use a chilled water supply temperature around 6 to 7 c 42 to 45 f cold enough for coil to dehumidify air to typical indoor humidity level system serving chilled beam radiant panel or data center cooling can use much warmer water 12 to 18 c 54 to 64 f because they handle sensible load only warmer supply water improve chiller efficiency since the compressor lift is lower and extend free cooling hour colder water reduce flow and pipe size and can support low temperature air distribution the choice is a trade off that depend on dehumidification need delta t the temperature difference between supply and return water delta t determine flow for a given load flow is inversely proportional to delta t flow l s load kw 4 19 x delta t in k for water in imperial unit gpm"},{"k":"Guide","u":"/guides/condenser-water-systems-and-cooling-towers/","t":"Condenser water systems and cooling towers","s":"Learn how a condenser water system works, the design values that drive tower and pump selection, and the control and water management issues owners need to understand.","nh":"hydronic system how the loop work key term typical design value water use control tower fan control condenser water temperature setpoint condenser pump control winter and shoulder season operation water treatment and legionella common problem frequently asked question why use a cooling tower instead of an air cooled chiller what is an equalizer line key takeaway","nb":"a water cooled chiller remove heat from the chilled water loop and reject it along with the energy used by its compressor into a second loop called the condenser water system that water is pumped to a cooling tower where a small portion evaporate and carry the heat away into the atmosphere the cooled water return to the chiller to pick up more heat condenser water system are open to the atmosphere at the tower which make them very different from closed chilled water loop they lose water continuously collect airborne dirt need active water treatment and present a legionella risk that must be managed this guide cover how the system work and the decision that shape its performance how the loop work the basic component are chiller condenser a shell and tube heat exchanger where refrigerant condense and heat the water condenser water pump usually one per chiller plus standby or headered pump serving all chiller cooling tower one or more cell where water is sprayed over fill while fan draw air through causing evaporation tower basin or remote sump collect cooled water water treatment and filtration chemical feed blowdown control and often side stream filtration makeup water replace water lost to evaporation drift and blowdown key term term meaning range temperature drop of water across the tower entering minus leaving approach difference between leaving tower water temperature and ambient wet bulb temperature wet bulb temperature the lowest temperature evaporation can cool water to the driving limit for tower performance cycle of concentration ratio of dissolved solid in tower water to those in makeup water drift water carried out of the tower as droplet blowdown bleed water deliberately drained to control dissolved solid typical design value a classic north american design for centrifugal chiller use condenser water entering the chiller at 29 4 c 85 f and leaving at about 35 c 95 f a range of about 5 6 k 10 f with a flow of roughly 0 054 l s per kw of cooling 3 gpm per t"},{"k":"Guide","u":"/guides/control-valve-selection-and-authority/","t":"Control valve selection and authority","s":"Learn how valve authority, flow characteristics and proper sizing determine whether a coil controls smoothly, and how to choose between valve types for HVAC systems.","nh":"hydronic system flow coefficient cv and kv valve authority authority in variable flow system flow characteristic why equal percentage suit coil rangeability two way versus three way valve two way valve three way valve valve type actuator and close off a practical selection procedure common valve problem frequently asked question is it acceptable to install a valve the same size as the pipe do picv make valve authority irrelevant key takeaway","nb":"a control valve is the device that turn a controller signal into a change in heating or cooling if the valve is sized and selected well a coil respond smoothly and predictably across its full range if the valve is oversized poorly matched to the coil or installed in a system with large pressure swing the coil hunt overshoot and waste energy many comfort and low delta t problem trace back to control valve this guide explain the key concept flow coefficient valve authority and flow characteristic and show how to apply them when selecting valve for hvac hydronic system flow coefficient cv and kv a valve flow capacity is described by its flow coefficient cv imperial is the flow in us gallon per minute of water at about 15 6 c 60 f that passe through a fully open valve with a pressure drop of 1 psi kv metric is the flow in cubic metre per hour with a pressure drop of 1 bar kv is approximately 0 865 time cv for water the relationship is q kv x square root of delta p with q in m3 h and delta p in bar equivalently q gpm cv x square root of delta p psi to size a valve the designer choose a design pressure drop across the valve at design flow and calculate the required kv or cv then select the closest standard valve usually not larger than calculated valve authority valve authority describe how much of the total pressure drop in a controlled circuit occur across the valve itself it is commonly defined as authority delta p across fully open valve delta p across fully open valve delta p across the rest of the controlled circuit the rest of the circuit include the coil piping fitting and balancing valve between the point where the differential pressure is held roughly constant high authority close to 1 mean the valve control most of the pressure drop so its inherent characteristic is preserved in operation low authority well below 0 5 mean the valve has little influence until it is nearly closed distorting its characteristic small change in valve position near closed produce lar"},{"k":"Guide","u":"/guides/expansion-tanks-and-system-pressurization/","t":"Expansion tanks and system pressurization","s":"Learn why closed hydronic systems need expansion control, how to size and locate expansion tanks, and how pressurization affects pumps, air removal and relief valves.","nh":"hydronic system why pressure control matter the point of no pressure change type of expansion tank sizing an expansion tank tall building makeup water and fill system relief valve common problem frequently asked question how do i check if my expansion tank is working do chilled water system need expansion tank key takeaway","nb":"water expand when it is heated and contract when it cool in a closed hydronic loop that change in volume has to go somewhere or system pressure will swing between level high enough to lift relief valve and low enough to draw air in at high point expansion tank and the makeup water system manage that volume change and set the pressure baseline the whole system operate around expansion control is often treated as a minor accessory but a wrongly sized or wrongly located tank is behind many recurring complaint air in terminal unit relief valve that weep pump that cavitate and glycol system that lose fluid this guide explain the principle and the decision that matter why pressure control matter a closed loop need three pressure condition to be satisfied at all time minimum pressure at the highest point must be above atmospheric with margin so air is not drawn in and automatic air vent can work a common rule is to maintain at least 30 to 35 kpa 4 to 5 psi above atmospheric at the top of the system though designer vary pressure at the pump suction must exceed the pump net positive suction head requirement especially in hot water system where vapour pressure is higher maximum pressure anywhere must stay below the relief valve setting and the rating of the weakest component typically the boiler chiller barrel or terminal equipment the expansion tank is the one point in the system where pressure is fixed everything else float relative to it as pump start and stop the point of no pressure change wherever the expansion tank connect is the point where pump operation doe not change pressure when a pump run it add pressure on its discharge side and reduce pressure on its suction side relative to that point for this reason the tank should normally connect at or near the suction side of the main system pump the pump then add pressure to the system when it run which help keep high point positive if the tank connect on the discharge side starting the pump lower pressure throughout muc"},{"k":"Guide","u":"/guides/glycol-systems-concentration-freeze-protection-and-performance/","t":"Glycol systems: concentration, freeze protection and performance","s":"Learn how glycol protects hydronic systems from freezing, how to pick the right type and concentration, and what glycol does to heat transfer, pumping and maintenance.","nh":"hydronic system ethylene vs propylene glycol freeze protection vs burst protection typical freeze point choosing a design temperature effect on performance filling and makeup testing and maintenance frequently asked question can i mix ethylene and propylene glycol why did my glycol loop freeze even though it was filled correctly key takeaway","nb":"in most of canada any hydronic loop that see outdoor air or outdoor equipment need freeze protection air cooled chiller dry cooler heat recovery coil makeup air unit preheat coil snow melting system and ground loop are routinely filled with a glycol and water mixture instead of plain water glycol solve the freezing problem but it is not free it reduce heat transfer increase pumping power change expansion volume need its own maintenance and cost money to buy and dispose of choosing the right type and concentration is a balance between protection and performance ethylene vs propylene glycol property ethylene glycol propylene glycol toxicity toxic if ingested low toxicity heat transfer better somewhat poorer viscosity at low temperature lower higher especially below freezing concentration for same freeze point lower higher typical use closed industrial and commercial loop with no risk of potable or food contact system with possible contact with potable water food or where spill are a concern propylene glycol is generally selected where a heat exchanger could leak into potable water in food facility and where local requirement or the owner policy favour it plumbing code and the authority having jurisdiction may also require double wall heat exchanger between treated loop and potable water regardless of glycol type check provincial plumbing code requirement for the specific application alway use an inhibited hvac grade glycol formulated for hydronic system automotive antifreeze contain silicate and other additive that can gel foul heat exchanger and attack pump seal in hvac system freeze protection vs burst protection manufacturer publish two different temperature freeze protection freeze point the temperature at which ice crystal begin to form below this the fluid become slushy and cannot be pumped effectively burst protection a lower temperature to which the fluid can fall without expanding enough to burst pipe the slush still occupy the system but it doe not rupture i"},{"k":"Guide","u":"/guides/heating-hot-water-system-design/","t":"Heating hot water system design","s":"Learn how to design heating hot water systems for Canadian commercial buildings, including temperature selection, terminal units, pumping, piping and controls that support condensing boilers and heat pumps.","nh":"hydronic system why supply temperature matter condensing boiler heat pump distribution losse typical design temperature terminal unit at lower temperature delta t and flow pumping arrangement piping and system component glycol control transition to heat pump frequently asked question can existing building run at lower temperature do low temperature system need more piping key takeaway","nb":"heating hot water system are the backbone of space heating in most canadian commercial and institutional building a central plant traditionally boiler and increasingly heat pump heat water that is pumped to air handler coil perimeter radiation fan coil radiant floor vav reheat coil and domestic water heat exchanger the single most important design decision today is supply water temperature older system were designed around 82 c 180 f supply water modern system built to work with condensing boiler and heat pump are designed for much lower temperature this guide cover temperature selection terminal unit pumping piping and control why supply temperature matter condensing boiler condensing boiler achieve their high rated efficiency only when return water is cool enough to condense water vapour in the flue gase for natural gas that mean return water below roughly 54 c 130 f and efficiency continue to improve as return temperature drop a condensing boiler connected to a system returning 70 c 158 f water will perform little better than a non condensing boiler see condensing boiler getting the efficiency you paid for heat pump air to water and water to water heat pump lose capacity and efficiency as the supply water temperature rise many commercial heat pump have a practical maximum supply temperature well below traditional boiler temperature and their coefficient of performance is markedly better at lower supply temperature designing for low temperature heating is essential to electrification see air to water heat pump for commercial heating distribution losse lower water temperature reduce heat losse from piping especially in long distribution run and older poorly insulated building typical design temperature design approach supply return at design suit traditional high temperature 82 71 c 180 160 f older non condensing boiler system condensing friendly 60 to 71 38 to 49 c 140 to 160 100 to 120 f condensing boiler retrofit of existing terminal low temperature 45 to 55 30 "},{"k":"Guide","u":"/guides/hydronic-heat-pump-loops/","t":"Hydronic heat pump loops","s":"Learn how a shared water loop lets heat pumps transfer heat around a building, how to keep the loop in its temperature band, and the design choices that affect efficiency.","nh":"hydronic system how the loop work typical temperature band where the system work well design consideration loop flow and pumping heat rejection heat addition thermal storage ventilation control maintenance issue frequently asked question is a water loop heat pump system the same as geothermal can existing water loop heat pump building be electrified key takeaway","nb":"a hydronic heat pump loop connect many water to air or water to water heat pump to a common water circuit each heat pump draw heat from the loop when its zone need heating and reject heat to the loop when it need cooling when some zone heat while other cool energy move between them through the loop and the central plant only need to make up the difference this arrangement often called a water loop heat pump or wlhp system has been common in canadian office school hotel and multi unit residential building for decade with the push toward electrification it has gained new attention as a flexible way to combine heat pump with geothermal field heat recovery chiller and waste heat source how the loop work the loop is a closed hydronic circuit maintained within a moderate temperature band typical component are heat pump at each zone usually water to air unit in ceiling or closet or water to water unit serving radiant or fan coil system loop circulating pump usually with variable speed drive a heat rejection device that remove heat when the loop get too warm a closed circuit fluid cooler a cooling tower with a plate heat exchanger or a geothermal field a heat addition device that add heat when the loop get too cold a boiler an electric boiler an air to water heat pump a geothermal field or a waste heat source expansion air separation and water treatment equipment like any closed loop typical temperature band conventional boiler and tower loop often operate roughly between 15 c and 32 c 60 f and 90 f the plant add heat when the loop fall toward the lower limit and reject heat when it rise toward the upper limit between those point the loop float and no central energy is needed geothermal loop operate over a wider and lower band often near or below 0 c 32 f entering water in heating mode in colder canadian climate which require antifreeze see geothermal heat exchange for commercial building the heat pump performance depend on loop temperature a warmer loop improve heating eff"},{"k":"Guide","u":"/guides/hydronic-piping-sizing-and-velocity-limits/","t":"Hydronic piping sizing and velocity limits","s":"Learn how to size hydronic piping using friction rates and velocity limits, why those limits exist, and how pipe material, glycol and noise sensitivity affect the choice.","nh":"hydronic system why velocity and friction matter friction and pump energy noise erosion air removal typical friction rate target typical velocity limit copper pipe plastic pipe sizing procedure effect of glycol variable flow consideration special case condenser water steam and condensate data center and critical system frequently asked question should i alway size for the lowest friction rate why doe my existing system make noise at valve key takeaway","nb":"pipe sizing in hydronic system balance first cost against operating cost and reliability smaller pipe cost less to buy and install but they increase friction losse pump energy and the risk of noise and erosion larger pipe cost more but run quieter and cheaper most designer size pipe using a combination of a target friction rate and maximum velocity limit this guide explain the method typical value from industry guidance and the factor that should push a designer toward larger or smaller pipe why velocity and friction matter friction and pump energy friction loss in pipe rise roughly with the square of velocity more precisely around the 1 8 to 2 power depending on flow regime pump power depend on flow and head doubling velocity in a pipe roughly quadruple its friction loss since pump often run thousand of hour per year friction rate is a direct driver of lifetime energy cost noise high velocity produce flow noise and can transmit noise through piping especially at fitting valve and where pipe pass through occupied space entrained air make noise worse erosion high velocity particularly in copper pipe and at fitting can erode pipe wall over time erosion corrosion in copper is a known issue at high velocity and high temperature often seen at elbow and tee downstream of pump air removal velocity that are too low can allow air to collect at high point and dirt to settle a minimum velocity often around 0 6 m s 2 fps help carry entrained air to separator in horizontal piping though dedicated air separation and vent remain essential typical friction rate target a commonly used design range for hydronic piping is a friction rate of about 100 to 400 pa m roughly 1 to 4 ft of head per 100 ft of pipe many designer target the middle of that range around 250 pa m about 2 5 ft per 100 ft and lower in long run or where pump energy matter most the ashrae handbook fundamental pipe sizing chapter provide friction chart and discusse typical range designer increasingly use lower friction"},{"k":"Guide","u":"/guides/low-delta-t-syndrome/","t":"Low delta-T syndrome and how to fix it","s":"Learn why chilled water plants often return water colder than designed, what that costs in pump and chiller capacity, and how to find and fix the root causes.","nh":"hydronic system why delta t matter common cause diagnosing low delta t fixing it eliminate unnecessary bypasse repair and right size control valve correct control and setpoint clean and repair coil address the plant setting realistic target frequently asked question is low delta t only a chilled water problem can i fix low delta t by raising the chilled water supply temperature how long doe a low delta t investigation take key takeaway","nb":"a chilled water system is designed around a temperature difference or delta t between supply and return water if a plant is designed for 6 7 c 44 f supply and 13 3 c 56 f return the 6 7 k 12 f delta t set the flow needed to move a given load when the actual return temperature is lower than design the system has to circulate more water to deliver the same cooling that condition is called low delta t syndrome it is one of the most common performance problem in chilled water plant and it is rarely caused by a single fault the symptom show up at the plant but the cause are usually spread across coil valve and control throughout the building why delta t matter heat transfer in a water loop follow a simple relationship load equal flow multiplied by delta t multiplied by a constant for the fluid for water in si unit kilowatt of cooling roughly equal litre per second multiplied by 4 19 multiplied by delta t in kelvin in imperial unit ton equal gpm multiplied by delta t in f divided by 24 if delta t fall to half of design flow must double to carry the same load the consequence cascade pump energy rise sharply pump power vary roughly with the cube of flow in a variable speed system so extra flow is expensive chiller cannot load fully a chiller rated for a design flow and delta t may reach its maximum flow before it reache its rated capacity operator then start another chiller running two machine at part load where one should do primary secondary system reverse flow in the decoupler when secondary flow exceed primary flow warm return water mixe into the supply raising supply temperature and making the problem worse see primary secondary vs variable primary flow for how each arrangement respond dehumidification suffer warmer supply water reduce coil latent capacity and space humidity can climb common cause cause how it lower delta t three way valve or open bypasse supply water return to the plant without passing through a coil oversized or leaking two way valve valve pass water"},{"k":"Guide","u":"/guides/pressure-independent-control-valves/","t":"Pressure-independent control valves: pros and cons","s":"Learn how pressure-independent control valves (PICVs) hold flow steady as system pressure changes, when they are worth the extra cost, and the mistakes that undermine them.","nh":"hydronic system how a picv work the minimum differential pressure advantage reduced balancing effort stable coil control at part load protection against overflow and low delta t disadvantage and limitation picv do not remove the need for balancing selection guidance electronic and energy valve pumping and differential pressure setpoint commissioning and verification frequently asked question can i retrofit picv into an existing system with circuit setter do picv save energy are picv required by code key takeaway","nb":"a conventional two way control valve set an opening not a flow when the pump speed up or other valve in the system close the differential pressure across that valve change and so doe the flow through the coil even though the valve position has not moved the controller then has to chase the disturbance and the coil may be overfed or starved in the meantime a pressure independent control valve picv combine a control valve with a built in differential pressure regulator so that for a given actuator position flow stay close to constant across a wide range of inlet pressure in variable flow chilled water and heating water system this can simplify balancing and improve coil control but picv are not a cure for every hydronic problem this guide cover how they work where they help and where they do not how a picv work inside the valve body there are typically three functional element a flow setting element that set the maximum flow either a separate adjustable orifice or a limit on actuator stroke a control element positioned by the actuator which modulate flow between zero and the set maximum a differential pressure regulator usually a spring loaded diaphragm or piston that hold the pressure drop across the control element constant because the pressure drop across the control element is held constant the valve authority is effectively close to 1 0 within its operating range flow become a function of actuator position alone which is the property designer want and rarely get from a standard globe or ball valve with modest authority for background on authority and why it matter see control valve selection and authority the minimum differential pressure every picv need a minimum differential pressure across the whole valve before the regulator can do its job manufacturer publish this as a start up or minimum operating pressure commonly in the range of roughly 15 to 35 kpa 2 to 5 psi though value vary by size and model below that threshold the regulator spring is fully open and "},{"k":"Guide","u":"/guides/primary-secondary-vs-variable-primary-flow/","t":"Primary-secondary vs variable primary flow","s":"A clear comparison of primary-secondary and variable primary flow pumping, with how each handles chiller flow, bypass control and energy, and how to choose.","nh":"hydronic system primary secondary system advantage disadvantage variable primary flow system advantage disadvantage side by side comparison minimum flow bypass in vpf chiller staging difference other arrangement how to choose frequently asked question is variable primary flow alway more efficient can heating hot water system use variable primary flow key takeaway","nb":"chilled water plant must reconcile two competing need chiller prefer stable flow through their evaporator within manufacturer limit building need variable flow because coil use less water at part load the pumping arrangement is how the design reconcile these need the two most common arrangement in modern plant are primary secondary also called decoupled and variable primary flow both can perform well this guide explain how each work its advantage and pitfall and how to choose primary secondary system in a primary secondary system there are two set of pump primary pump circulate a constant or stepped flow through each operating chiller usually one primary pump is dedicated to each chiller secondary pump are variable speed pump that distribute chilled water to the building coil modulating to maintain differential pressure the two loop connect through a decoupler a short low resistance common pipe when primary flow exceed secondary flow the excess flow through the decoupler from supply to return when secondary flow exceed primary flow warm return water flow backward through the decoupler and mixe with chiller supply water raising supply temperature to the building that is a sign that another chiller should be started advantage simple robust chiller flow control each chiller see constant design flow chiller and distribution pump can be selected independently which is helpful when chiller are far from load or in campus system with tertiary loop well understood by operator and designer tolerant of control problem chiller are protected even if distribution control misbehave disadvantage more pump more space and more first cost primary pump run at constant speed consuming energy even at part load low delta t in the building cause secondary flow to exceed primary flow forcing more chiller and primary pump to run than the load require see low delta t syndrome reverse flow in the decoupler raise supply temperature reducing dehumidification some design include a check valve in "},{"k":"Guide","u":"/guides/pump-selection-and-system-curves/","t":"Pump selection and system curves","s":"Learn how pump curves and system curves interact, how to select an efficient, reliable pump for a hydronic system, and how variable speed and parallel pumping change the picture.","nh":"hydronic system the pump curve the system curve the operating point calculating pump head selecting the pump aim near the best efficiency point avoid the largest and smallest impeller check npsh choose pump type motor sizing variable speed pumping parallel and sery pumping parallel sery common selection error frequently asked question can an oversized pump be fixed without replacement doe pump efficiency matter in small system key takeaway","nb":"pump move the water that carry heating and cooling through a building they run for thousand of hour a year so a pump selected far from its best efficiency point or oversized by a generous safety factor waste energy for decade and often wear out early good pump selection start with understanding two curve the pump curve and the system curve this guide explain how those curve work how to select a centrifugal pump for hvac service and how variable speed drive and parallel pump change the selection the pump curve a centrifugal pump curve published by the manufacturer show the head a pump develop at each flow rate for a given impeller diameter and speed head is the energy the pump add to the water expressed in metre or feet of water column or as pressure in kpa a typical pump curve chart include head versus flow curve for several impeller diameter efficiency contour or curve with a best efficiency point bep for each impeller power curve showing shaft power at each flow npsh required net positive suction head curve minimum and maximum flow limit recommended by the manufacturer head fall as flow increase a pump selected near its bep run efficiently quietly and with low radial load on bearing and seal the system curve the system curve show the head required to move water through the piping system at each flow rate for a closed hydronic loop the static height of the system doe not count because water going up one side come down the other the head required is mostly friction which vary approximately with the square of flow h2 h1 x q2 q1 2 in variable flow system with differential pressure control there is also a fixed component the differential pressure setpoint the pump must maintain across the remote coil and valve this flatten the system curve and shift it upward at low flow for open system such as cooling tower condenser water the static lift from the tower basin water level to the top of the tower distribution system must be added the operating point the pump run where i"},{"k":"Guide","u":"/guides/radiant-heating-and-cooling-systems/","t":"Radiant heating and cooling systems","s":"Learn how radiant systems deliver comfort through surfaces instead of air, where they fit in commercial buildings, and the design and control issues that decide whether they succeed.","nh":"hydronic system why radiant work system type typical design value heating cooling condensation control design consideration floor covering zoning and control combining with air system acoustic and architectural coordination commissioning advantage and limitation frequently asked question can radiant floor be used in warehouse and garage doe radiant cooling work in humid climate key takeaway","nb":"radiant system heat or cool a space by changing the temperature of large surface usually floor or ceiling rather than by blowing conditioned air people exchange heat with those surface directly by radiation and the surrounding air is warmed or cooled by convection off the same surface the result can be very even comfort quiet operation and low energy use radiant heating has a long history in canada from in floor heating in garage and warehouse to radiant ceiling panel at perimeter window radiant cooling is less common but growing especially in high performance and net zero ready building paired with dedicated outdoor air system this guide cover the main system type typical design value and the practical issue that matter most why radiant work thermal comfort depend on air temperature and on mean radiant temperature the average temperature of the surface around a person ashrae standard 55 combine them into operative temperature a warm floor or ceiling raise mean radiant temperature so occupant can feel comfortable at a slightly lower air temperature in winter a cool ceiling doe the opposite in summer see thermal comfort and ashrae standard 55 water carry heat far more compactly than air moving heat with pump and pipe instead of fan and duct reduce transport energy and allow smaller ductwork since air system only need to handle ventilation and latent load system type type construction response typical use embedded slab thermally active tubing cast in structural slab or topping slow hour office school atria warehouse garage thin slab or panel floor tubing in thin topping or grooved panel moderate retrofit residential light commercial radiant ceiling panel metal panel with bonded tubing fast minute perimeter heating office healthcare lab capillary mat small diameter tubing in plaster or ceiling fast to moderate retrofit high end office radiant wall tubing in wall assembly moderate specialty space embedded slab system have large thermal mass they are well suited to stead"},{"k":"Guide","u":"/guides/snow-melting-system-design/","t":"Snow melting system design","s":"Learn how hydronic snow melting systems are sized and laid out, which heat sources and fluids suit Canadian winters, and how controls keep operating costs reasonable.","nh":"hydronic system defining the performance level heat losse to account for system component heat source fluid tubing manifold and pumping design procedure control operation and maintenance frequently asked question hydronic or electric snow melting can a snow melt system be added to an existing walkway key takeaway","nb":"snow melting system keep sidewalk entrance parkade ramp loading dock and helipad clear by circulating warm fluid through tubing embedded below the surface in canada they are common at hospital entrance emergency ramp accessible route steep parkade ramp and high end commercial frontage where plowing and salting are impractical or undesirable they are also large energy user a snow melting slab can demand as much heating capacity as the building it serve good design balance the level of performance the owner actually need against capital and operating cost and use control to run the system only when necessary defining the performance level the ashrae handbook hvac application volume classify snow melting system by how clear the surface must stay class performance typical application class i residential and light duty surface may accumulate some snow during heavy snowfall cleared after the storm residential driveway and walkway class ii commercial surface stay mostly wet with little accumulation for most snowfall commercial sidewalk entrance parkade ramp class iii industrial and critical surface stay clear during essentially all snowfall hospital emergency entrance helipad toll plaza higher classe require higher heat output design heat flux depend on the class the local climate snowfall rate air temperature and wind during snowfall and the free area ratio which is how much of the surface must be snow free ashrae tabulate design heat fluxe for many north american city including several canadian one and the resulting value commonly range from a few hundred to several hundred w m2 windy cold location need considerably more than mild calm one choosing a lower class or a lower free area ratio is the single largest lever on cost a hospital ambulance bay may justify class iii a retail sidewalk often doe not heat losse to account for the design heat output must cover melting snow and warming the meltwater evaporation of water from the surface convection and radiation from the s"},{"k":"Guide","u":"/guides/steam-systems-in-older-canadian-buildings/","t":"Steam systems in older Canadian buildings","s":"Learn how the steam systems in older Canadian buildings work, why they often heat unevenly and waste energy, and how to decide between restoring them and converting to hot water.","nh":"hydronic system how steam heating work low pressure steam common system type common problem failed steam trap poor venting water hammer condensate return problem overheating and lack of zone control boiler oversizing and short cycling assessing an existing steam system improve or convert restore and optimize convert to hot water electrify code and regulatory note frequently asked question why are some room too hot and other too cold how often should steam trap be tested key takeaway","nb":"many older canadian building including heritage office school churche hospital university and apartment block are still heated by steam some generate it in their own low pressure boiler other buy it from a district steam network these system were well engineered for their time and can last a century but most have been modified neglected or partly converted over the decade and they rarely perform as originally intended steam system are different enough from modern hot water system that maintenance staff and contractor without steam experience often misdiagnose them this guide explain the basic the most common problem and the option owner have how steam heating work a boiler heat water until it boil the steam travel through supply piping under its own pressure to radiator convector unit heater or coil there it give up its latent heat and condense back to water the condensate drain back to the boiler by gravity or through a condensate pump or vacuum pump to be boiled again because steam carry most of its energy as latent heat a small mass of steam deliver a lot of heat and no circulating pump is needed on the supply side that simplicity is one reason steam was so widely used low pressure steam building heating system almost alway operate at low pressure generally defined as not exceeding 103 kpa 15 psig many well functioning system run at only a few kpa well under 2 psig higher pressure than needed waste fuel make venting harder and increase noise common system type type description one pipe steam supply and condensate return share the same pipe to each radiator rely on air vent on radiator and main two pipe separate supply and return a steam trap at each radiator keep steam out of the return vacuum two pipe system with a vacuum pump on the return allowing lower steam temperature and faster distribution vapour early low pressure two pipe system operating near atmospheric pressure often with proprietary component district steam building receive steam from a utility netw"},{"k":"Guide","u":"/guides/variable-speed-pumping-and-differential-pressure-setpoints/","t":"Variable speed pumping and differential pressure setpoints","s":"Learn how variable speed pumps track load, how sensor location and setpoint choice decide how much energy they save, and how to reset setpoints using valve position.","nh":"hydronic system how variable speed control work where to put the differential pressure sensor choosing the setpoint setting it in the field setpoint reset using valve position minimum speed and minimum flow multiple pump in parallel common problem frequently asked question is sensorless pump control good enough can i add a vfd to an existing constant speed pump key takeaway","nb":"most commercial hydronic system built in the last few decade use two way control valve and variable speed pump as valve throttle in response to falling load the pump slow down to match and because pump power fall steeply with speed the saving can be large necb include variable flow requirement for larger hydronic system for exactly this reason how much energy a variable speed pump actually save depend almost entirely on how it is controlled the location of the differential pressure sensor and the value of the setpoint matter more than the drive or the pump this guide explain the principle and the practical choice how variable speed control work a variable frequency drive vfd change pump speed a controller compare a measured variable usually differential pressure somewhere in the system to a setpoint and adjust speed to hold it when load fall and valve close system resistance rise and differential pressure start to climb the controller slow the pump to bring pressure back to setpoint the pump follow a control curve rather than the system curve and the shape of that control curve determine energy use the affinity law say flow vary with speed head with speed squared and power with speed cubed those relationship apply strictly only along a system curve that passe through zero head at zero flow because a differential pressure setpoint hold some head even at low flow real saving are less than the cube law suggest the higher the setpoint relative to total head the smaller the saving see pump selection and system curve for the underlying curve where to put the differential pressure sensor sensor location control curve energy use note across the pump nearly flat constant head highest simple but save little mostly used for small system or as a fallback at the plant across supply and return main moderately flat moderate easy to install and maintain setpoint must cover all pipe losse to the far end near the hydraulically most remote load steeper follow system curve more closely"},{"k":"Guide","u":"/guides/water-treatment-for-closed-and-open-loops/","t":"Water treatment for closed and open loops","s":"Learn how water treatment protects hydronic and condenser systems from corrosion, scale and biological growth, and what a sound treatment and testing program looks like.","nh":"hydronic system the three problem water treatment addresse closed loop common treatment approache what to test in closed loop the makeup water meter open loop cooling tower program element legionella management pre commissioning cleaning what owner should expect from a treatment provider frequently asked question how often should closed loop water be tested can i discharge treated water to the sewer key takeaway","nb":"the water inside a building hvac system is a working fluid and like any other component it need care untreated or poorly treated water corrode piping from the inside deposit scale on heat transfer surface and support bacterial growth the damage is usually invisible until a pinhole leak appear a chiller lose capacity or a pump fail early closed loop heating water chilled water glycol and open loop cooling tower condenser water have very different treatment need this guide explain the principle of each the test that matter and how to tell whether a treatment program is working the three problem water treatment addresse problem what happen consequence corrosion metal react with oxygen and other agent in the water pipe thinning leak magnetite and rust sludge failed valve and pump scale dissolved mineral such as calcium carbonate precipitate on hot surface reduced heat transfer higher chiller and boiler energy use blocked tube biological growth bacteria algae and fungi form biofilm fouling microbiologically influenced corrosion legionella risk in open system a fourth concern suspended solid is handled mainly with filtration and separation rather than chemistry see air and dirt separation in hydronic system closed loop a tight closed loop once filled and treated should need very little new water that is the key to closed loop treatment if makeup is low oxygen and mineral are added only once and the chemistry stay stable common treatment approache nitrite based program long used for steel system nitrite is an effective corrosion inhibitor but can be consumed by certain bacteria molybdate based program effective inhibitor often blended with nitrite molybdate is easy to test organic or blended program various proprietary blend with azole for copper protection azole such as tolyltriazole protect copper and brass component in mixed metal system oxygen scavenger used in some heating system especially those with steel boiler the choice depend on system metallurgy temperature the"},{"k":"Guide","u":"/guides/boiler-plant-design-and-sequencing/","t":"Boiler plant design and sequencing","s":"Learn how boiler plants are sized, piped and staged, how condensing and non-condensing boilers differ in sequencing, and the controls that keep a plant efficient and safe.","nh":"chiller boiler and central plant sizing the plant configuration and redundancy piping arrangement primary secondary variable primary reverse return and boiler isolation condensing and non condensing boiler sequencing logic safety and code requirement commissioning and operation frequently asked question should all boiler in a plant be the same size can i mix old and new boiler key takeaway","nb":"the boiler plant is the heart of a hydronic heating system in a canadian climate it has to deliver full output on the coldest night of the year and still run efficiently through long shoulder season when the building need only a fraction of that capacity it also has to keep running when a boiler fail because a heating outage in january can freeze pipe and close a building plant design and sequencing decision determine whether a boiler plant achieve both goal this guide cover sizing configuration piping control and staging with note on the difference between condensing and conventional boiler sizing the plant start with an accurate heating load calculation for the building at the local design temperature including ventilation and any process or domestic hot water load served by the plant see heating load calculation for canadian climate common sizing issue oversizing from stacked safety factor each designer contractor and supplier add margin and the plant end up far larger than needed oversized plant cycle more and spend more hour at low fire like for like replacement old boiler were sized for leaky building often with generous margin after envelope and window upgrade the load may be much lower pickup allowance morning warm up after night setback can require extra capacity but this is better handled with optimal start than with large margin for existing building gas consumption data correlated with outdoor temperature give a reliable measure of the real peak load configuration and redundancy splitting capacity among several boiler improve turndown efficiency and reliability common arrangement configuration capacity with one boiler out note 2 x 100 100 full redundancy but each boiler is large and spend most hour at low load 2 x 67 67 common compromise often enough for most of the season 3 x 50 100 n 1 at design good turndown 4 or more modular boiler 75 or more excellent turndown and staging flexibility critical facility such as hospital long term care home and laborat"},{"k":"Guide","u":"/guides/central-plant-redundancy-and-n-1-design/","t":"Central plant redundancy and N+1 design","s":"Learn what redundancy terms like N+1 and 2N actually mean for a central plant, how to decide how much redundancy a building needs, and where single points of failure tend to hide.","nh":"chiller boiler and central plant what the term mean choosing a redundancy level sizing for redundancy efficiently hidden single point of failure control and redundancy testing redundancy frequently asked question is n 1 alway required doe redundancy waste energy how often should redundancy be tested key takeaway","nb":"redundancy is the extra capacity or extra path a plant carry so that it can keep serving the building when a component fail or is taken out for maintenance in central plant the shorthand is usually written as n 1 n 2 or 2n where n is the number of unit needed to meet the design load the right level of redundancy is a business decision as much as an engineering one a hospital data center or pharmaceutical plant may need to ride through a chiller failure on the hottest day of the year a typical office may accept a few uncomfortable hour getting it right mean understanding the term the real load profile and the part of the plant that are not covered by duplicate equipment what the term mean term meaning example 1 400 kw 400 ton peak load n exactly enough capacity to meet design load no spare two 700 kw chiller n 1 one spare unit beyond what is needed three 700 kw chiller n 2 two spare unit four 700 kw chiller 2n a full duplicate of the required capacity four 700 kw chiller in two independent system 2 n 1 two independent system each n 1 two system of three 700 kw chiller two point are often misunderstood n 1 is about unit not percentage with two chiller each sized for 100 percent of the load the plant is n 1 with four chiller each at 33 percent the plant is also n 1 but the spare unit is a smaller fraction of total capacity which usually cost less 2n imply independence true 2n mean two separate system including distribution power and control so that a failure in one doe not affect the other four chiller on a common header with a single pump set is not 2n even if total capacity is double choosing a redundancy level start with the consequence of losing capacity not with the equipment define critical load which space must stay within limit during a failure in a hospital operating room isolation room and imaging may be critical while office are not standard such as csa z317 2 address essential hvac system in canadian health care facility define the failure scenario is the d"},{"k":"Guide","u":"/guides/chiller-plant-sequencing-and-optimization/","t":"Chiller plant sequencing and optimization","s":"Learn how chiller plant sequencing works, why staging on temperature alone wastes energy, and how resets and total plant optimization reduce kW per ton of delivered cooling.","nh":"chiller boiler and central plant the goal total plant efficiency chiller staging staging up staging down running chiller at efficient load unequal chiller size pump sequencing cooling tower sequencing reset strategy chilled water supply temperature reset condenser water temperature reset total plant optimization a practical optimization process common sequencing problem frequently asked question how much can sequencing improvement save do i need optimization software key takeaway","nb":"a central chiller plant is a set of interacting machine chiller chilled water pump condenser water pump and cooling tower each can be operated efficiently on its own and still produce an inefficient plant if they are not coordinated sequencing is the logic that decide which equipment run when to add or drop unit and what setpoint each should hold good sequencing often reduce plant energy significantly without any new equipment poor sequencing such as starting a second chiller too early or running tower at fixed temperature is one of the most common finding when existing plant are reviewed the goal total plant efficiency the useful measure is the energy of all plant equipment per unit of cooling delivered often expressed as plant kw ton or plant cop optimizing one component at the expense of another can make the total worse colder condenser water help chiller but cost tower fan energy warmer chilled water help chiller but can increase pump flow and air handler fan energy running more chiller at lower load can help or hurt depending on their part load curve optimization mean finding combination that minimize the total at each load and weather condition chiller staging staging up the traditional approach add a chiller when supply temperature rise above setpoint for some period that is too slow and too blunt better staging use one or more of chiller load or current stage up when running chiller exceed a percentage of capacity for example 85 to 95 percent for a defined time calculated plant load flow multiplied by delta t compared to the capacity of running chiller chiller flow limit stage up if evaporator flow approache the maximum for running chiller a common symptom of low delta t syndrome supply temperature as a backup when the chiller clearly cannot hold setpoint staging down drop a chiller when the remaining chiller can carry the load comfortably with enough margin to avoid immediate restaging a deadband and minimum run and off time prevent short cycling running ch"},{"k":"Guide","u":"/guides/chiller-selection-efficiency-iplv-and-part-load/","t":"Chiller selection: efficiency, IPLV and part-load","s":"Learn what chiller efficiency metrics mean, why most chillers spend their lives at part load, and how to compare selections at the conditions your plant will actually see.","nh":"chiller boiler and central plant efficiency metric full load efficiency iplv nplv code minimum in canada why part load dominate a practical selection procedure selection detail that affect efficiency frequently asked question should i choose the chiller with the best iplv doe a variable speed drive alway pay back key takeaway","nb":"choosing a chiller is often treated as a matter of capacity and price with efficiency checked against a code minimum that misse most of the story a chiller sized for the hottest afternoon of the year spend the large majority of its operating hour well below full load at cooler condenser condition than design how efficient it is in those hour determine most of its lifetime energy cost this guide explain the efficiency metric used in chiller rating and code table what they do and do not tell you and how to compare selection in a way that reflect real operation efficiency metric metric definition better when cop coefficient of performance cooling output divided by power input both in the same unit kw kw higher kw ton electrical input in kw per ton 3 517 kw of cooling lower eer cooling output in btu h divided by input in w used mainly for air cooled unit higher iplv integrated part load value a weighted average of efficiency at four load point under standard condition higher cop or lower kw ton nplv non standard part load value same weighting calculated at project specific design condition higher cop or lower kw ton the conversion are simple cop equal 3 517 divided by kw ton a water cooled centrifugal chiller at 0 55 kw ton has a cop of about 6 4 full load efficiency full load efficiency is measured at the rated design condition it matter for peak electrical demand and for sizing electrical service but it represent only a small fraction of annual operating hour for most comfort cooling plant iplv iplv is defined in ahri standard 550 590 the north american rating standard for water chilling package it weight efficiency at four load point load point weighting water cooled entering condenser water air cooled entering air 100 1 29 4 c 85 f 35 c 95 f 75 42 23 9 c 75 f 26 7 c 80 f 50 45 18 3 c 65 f 18 3 c 65 f 25 12 18 3 c 65 f 12 8 c 55 f the weighting reflect an aggregate of building type and climate across the united state they show the important point clearly most operati"},{"k":"Guide","u":"/guides/chiller-types-centrifugal-screw-scroll-and-absorption/","t":"Chiller types: centrifugal, screw, scroll and absorption","s":"Learn how the main chiller types differ in compressor technology, capacity range, part-load efficiency and maintenance, so you can narrow the options for a project.","nh":"chiller boiler and central plant quick comparison scroll chiller screw chiller centrifugal chiller surge variable speed and oil free design low pressure refrigerant absorption chiller air cooled vs water cooled how to narrow the choice frequently asked question which chiller type is most efficient are absorption chiller still used key takeaway","nb":"a chiller produce chilled water for air handler fan coil process load and data center most chiller use the vapour compression refrigeration cycle and they are grouped mainly by the type of compressor centrifugal screw or scroll absorption chiller are the main exception using heat rather than mechanical work to drive the cycle each type has a natural capacity range a characteristic efficiency curve and its own maintenance need understanding these difference help owner and designer narrow the field before getting into detailed selection quick comparison type typical capacity range compressor action strength limitation scroll small roughly up to a few hundred kw per module two interleaved spiral compress gas simple reliable low cost modular limited capacity per compressor staged rather than smooth capacity unless variable speed screw mid range roughly a few hundred to over 1 500 kw meshing helical rotor compress gas robust good at high lift handle air cooled duty well can be noisy part load efficiency depend on capacity control centrifugal large commonly from several hundred kw to many mw high speed impeller add velocity diffuser convert to pressure highest full and part load efficiency in large size surge risk at low load with high lift larger footprint and cost absorption mid to large heat drive a lithium bromide and water cycle use waste heat or steam little electricity low cop large size need cooling tower capacity capacity range overlap and vary by manufacturer in imperial term scroll unit often cover roughly up to 200 ton screw chiller from about 70 to 500 ton and centrifugal chiller from about 150 ton upward with oil free magnetic bearing centrifugal extending into smaller size scroll chiller scroll compressor are hermetic have few moving part and are very reliable a scroll chiller usually combine several compressor on one or more refrigerant circuit and stage them on and off to match load scroll chiller dominate small air cooled application and modular plant wh"},{"k":"Guide","u":"/guides/combined-heat-and-power-for-commercial-facilities/","t":"Combined heat and power for commercial facilities","s":"Learn how a combined heat and power system generates electricity and useful heat on site, which facilities have the right load profile, and what to check before committing to one in a Canadian context.","nh":"chiller boiler and central plant how chp work prime mover type which facility suit chp sizing follow the thermal base load economic the spark spread carbon it depend on the grid design and code consideration operation and maintenance frequently asked question can chp provide cooling what is a realistic payback for chp doe chp replace the need for boiler key takeaway","nb":"combined heat and power chp also called cogeneration produce electricity and useful heat from a single fuel source on site a conventional power plant reject most of the fuel energy as waste heat a chp system capture that heat and use it for space heating domestic hot water process load or absorption cooling because both output are used overall fuel utilization can reach roughly 65 to 85 percent compared with the separate purchase of grid electricity and boiler heat whether that translate into cost saving or carbon reduction depend heavily on the facility load profile local utility rate and in canada the carbon intensity of the provincial electricity grid how chp work a chp system has three main part a prime mover that burn fuel usually natural gas and drive a generator heat recovery equipment that capture heat from engine jacket water lubricating oil and exhaust gase integration with the building electrical service and heating system including control switchgear and thermal storage where used prime mover type prime mover typical size range recoverable heat note reciprocating engine ten of kw to several mw hot water from jacket and exhaust most common in commercial building good part load performance microturbine about 30 kw to a few hundred kw modular hot water or low pressure steam from exhaust low emission fewer moving part lower electrical efficiency gas turbine about 1 mw and up high temperature exhaust steam common on campuse hospital and district plant fuel cell ten of kw to mw low to medium temperature water high electrical efficiency high capital cost for most commercial facility reciprocating engine dominate because they offer good electrical efficiency at modest size and deliver hot water at temperature suitable for building heating system which facility suit chp chp pay off when a building has a steady simultaneous demand for electricity and heat for a large number of hour each year good candidate usually share these trait long operating hour often 24 7 a"},{"k":"Guide","u":"/guides/condensing-boilers-getting-the-efficiency-you-paid-for/","t":"Condensing boilers: getting the efficiency you paid for","s":"Learn how condensing boilers achieve high efficiency, why many installations never condense, and the system design, control and maintenance steps that let them deliver.","nh":"chiller boiler and central plant how condensing work why many installation underperform system designed for high temperature small design delta t bypasse and three way valve mixing with non condensing boiler fixed high supply setpoint how to make condensing boiler condense 1 reset supply temperature with outdoor temperature 2 design for lower temperature and larger delta t 3 eliminate bypasse and use two way valve 4 pipe boiler correctly 5 sequence for efficiency 6 commission combustion installation requirement verifying performance frequently asked question is a condensing boiler worth it in a high temperature system do condensing boiler last as long as conventional boiler key takeaway","nb":"condensing boiler are sold on high efficiency rating often in the mid 90 percent range many owner discover later that their gas bill did not drop as expected the boiler is usually working fine the problem is that the heating system around it return water too hot for the boiler to condense so it operate much like the conventional boiler it replaced getting the efficiency you paid for depend less on the boiler than on the system it is connected to this guide explain why and what designer contractor and operator can do about it how condensing work when natural gas burn it produce water vapour along with carbon dioxide in a conventional boiler that vapour leave up the flue carrying its latent heat with it a condensing boiler has a heat exchanger large enough to cool the flue gase below their dew point so the vapour condense and release its latent heat into the boiler water for natural gas the flue gas dew point is typically around 55 c 130 f depending on excess air the boiler heat exchanger surface must be below that temperature for meaningful condensing which mean the return water entering the boiler must be cooler than about 55 c 130 f the cooler the return the more condensing and the higher the efficiency return water temperature typical condensing boiler behaviour above about 60 c 140 f little or no condensing efficiency similar to a good non condensing boiler about 50 to 55 c 122 to 130 f partial condensing about 30 to 45 c 86 to 113 f strong condensing efficiency in the low to mid 90s below about 30 c 86 f highest efficiency exact efficiency depend on the boiler firing rate and excess air manufacturer publish efficiency curve against return water temperature lower firing rate generally improve efficiency because the heat exchanger has more surface per unit of heat why many installation underperform system designed for high temperature many existing canadian heating system were designed for around 82 c 180 f supply and 71 c 160 f return replacing the boiler without"},{"k":"Guide","u":"/guides/cooling-tower-selection-and-winter-operation/","t":"Cooling tower selection and winter operation","s":"Learn how cooling tower types compare, what drives selection, and the freeze protection and control strategies that let towers operate safely in cold Canadian weather.","nh":"chiller boiler and central plant tower type selection criteria thermal performance energy material sound maintenance access siting winter operation freeze risk protection strategy free cooling transition frequently asked question should i drain my cooling tower for winter do tower lose capacity in winter key takeaway","nb":"cooling tower reject heat from water cooled chiller plant process load and heat pump loop by evaporating a small portion of the circulating water selecting the right tower mean balancing thermal performance energy water use noise footprint and maintenance in canada there is an additional challenge many tower have to keep running when outdoor temperature are well below freezing this guide cover tower type the main selection criteria siting and the freeze protection and control strategy that make winter operation reliable tower type type description typical strength typical limitation induced draft crossflow fan on top pull air horizontally through fill as water fall by gravity easy access to distribution basin low pump head larger footprint more prone to icing on air inlet induced draft counterflow fan on top pull air upward against falling water compact efficient heat transfer higher pump head spray distribution less accessible forced draft centrifugal or axial fan at the base pushe air through can be ducted suit indoor installation lower sound with centrifugal fan higher fan energy risk of recirculation closed circuit fluid cooler process fluid run inside a coil spray water and air cool the coil keep loop fluid clean and closed can run dry in winter higher cost and weight larger for same duty hybrid or adiabatic cooler dry coil with water spray or pre cooling pad on hot day very low water use larger and less effective at peak than evaporative tower open tower are usually paired with a chiller condenser closed circuit fluid cooler are common for water loop heat pump system and for winter free cooling because the loop fluid can contain glycol and is not exposed to air selection criteria thermal performance a tower is selected for a flow rate an entering and leaving water temperature the range and a design wet bulb the difference between leaving water and wet bulb is the approach a closer approach require a larger tower typical comfort cooling design use approache of "},{"k":"Guide","u":"/guides/district-energy-connections-for-commercial-buildings/","t":"District energy connections for commercial buildings","s":"Learn how a building connects to a district heating or cooling network, what the energy transfer station does, and which design decisions inside the building decide whether the connection performs.","nh":"chiller boiler and central plant how a district energy connection work the energy transfer station typical operating temperature why delta t matter so much designing a building for a district connection new building converting an existing building metering billing and contract commissioning the connection frequently asked question is district energy cheaper than an on site plant doe a district connection help with carbon target key takeaway","nb":"a district energy system produce heating cooling or both in a central plant and distribute it through buried pipe to many building instead of running its own boiler and chiller a connected building buy thermal energy usually metered in kilowatt hour or megawatt hour and pay a capacity or demand charge on top district network operate in many canadian city and campuse and some municipality now encourage or require new development to be district energy ready for an owner the connection decision affect capital cost plant room space carbon intensity and how the building own hvac system must be designed how a district energy connection work most modern network use an indirect connection the district water never circulate through the building instead a set of heat exchanger in an energy transfer station ets separate the utility side primary from the building side secondary the energy transfer station a typical ets include plate heat exchanger for heating cooling or both often split into two or more unit for redundancy and turndown utility owned control valve on the primary side modulating to hold a building supply temperature setpoint an energy meter consisting of a flow meter and a matched pair of temperature sensor used for billing isolation valve strainer pressure gauge and thermometer on both side on the heating side often a domestic hot water heat exchanger as well the demarcation point between utility and owner is normally the secondary side flange of the heat exchanger but it vary by utility read the service agreement carefully it define who own maintain and replace each component typical operating temperature network temperature depend on the system generation and the utility design standard the table below show common range alway confirm with the specific utility design guide network type typical supply temperature typical return target steam legacy downtown system low to medium pressure steam condensate return or dumped conventional hot water 80 to 120 c 176 to 2"},{"k":"Guide","u":"/guides/heat-recovery-chillers/","t":"Heat recovery chillers","s":"Learn how a heat recovery chiller works, which buildings benefit most, how to size it against simultaneous heating and cooling loads, and the piping and control details that make it pay off.","nh":"chiller boiler and central plant how a heat recovery chiller work efficiency in combined mode where heat recovery chiller fit best sizing do not size for the peak heating loop temperature the key design decision piping arrangement sidestream on the return dedicated heat recovery loop heat rejection and source backup control refrigerant consideration frequently asked question how much can a heat recovery chiller save can a heat recovery chiller replace boiler entirely key takeaway","nb":"a heat recovery chiller is a water to water heat pump that produce chilled water and useful hot water at the same time instead of rejecting condenser heat to a cooling tower it deliver that heat to a building heating loop every kilowatt of cooling become roughly 1 2 to 1 3 kw of heating because the compressor work is added to the heat removed from the chilled water in canadian building that need cooling and heating at the same time such as hospital laboratory data intensive office and large mixed use building a heat recovery chiller can displace a large share of boiler fuel it is also one of the most practical first step in electrifying an existing gas fired heating plant how a heat recovery chiller work all chiller move heat from an evaporator to a condenser a conventional chiller send condenser water at 29 to 35 c 85 to 95 f to a cooling tower or dry cooler a heat recovery chiller raise its condensing temperature so the condenser leaving water is hot enough to use for space heating reheat or domestic water preheating the amount of useful heat equal the cooling delivered plus the compressor input chilled water enter the evaporator for example at 12 c 54 f and leave at 6 c 43 f the compressor raise the refrigerant pressure and temperature using electrical energy hot water enter the condenser for example at 40 c 104 f and leave at 50 to 60 c 122 to 140 f if there is more heat than the building can use it is rejected to a cooling tower or fluid cooler through a second condenser or a separate heat rejection loop efficiency in combined mode a heat recovery chiller efficiency is often expressed as a combined or total cop useful cooling plus useful heating divided by electrical input because both output are useful combined cop of 5 to 7 are achievable when the lift between chilled water and hot water temperature is modest the higher the hot water temperature the higher the lift and the lower the efficiency so the temperature of the heating loop is one of the most importan"},{"k":"Guide","u":"/guides/plant-room-layout-and-serviceability/","t":"Plant room layout and serviceability","s":"Learn the layout principles that make a mechanical room easy to operate, maintain and eventually replace equipment in, along with the code requirements that shape chiller and boiler rooms in Canada.","nh":"chiller boiler and central plant start with the life of the equipment clearance manufacturer clearance tube pull and coil removal electrical clearance typical layout checklist access and height lifting and replacement route code requirement that shape the room refrigeration machinery room boiler room and gas appliance other requirement piping layout for serviceability noise lighting and environment frequently asked question how much floor area doe a plant room need who review plant room serviceability key takeaway","nb":"a mechanical plant room is usually designed once and then operated for 50 year or more during that time filter will be changed thousand of time pump rebuilt chiller retubed and boiler replaced a layout that look efficient on a drawing can make every one of those task slow unsafe or expensive space for plant room is often the first thing squeezed during design because floor area has a direct value good serviceability doe not mean a large room it mean a room where every component that will need attention can be reached isolated and removed start with the life of the equipment before arranging equipment list what will happen to each item over its life daily or weekly visual check gauge reading log entry monthly to annually filter change strainer cleaning belt change water treatment combustion analysis tube inspection every few year pump seal motor bearing valve replacement heat exchanger cleaning tube brushing once or twice in the building life full replacement of chiller boiler pump tank and air handler every one of those task need physical space and a path for people tool and part the replacement task need a path big enough for the largest single piece of equipment to leave the building and a new one to arrive clearance manufacturer clearance every major piece of equipment come with manufacturer clearance requirement usually shown on the submittal drawing these typically include front access for control panel and starter side clearance for service and top clearance for compressor or motor removal treat these as minimum not target tube pull and coil removal shell and tube chiller heat exchanger and some boiler need clear space at one end equal to roughly the length of the tube bundle so tube can be pulled or brushed some design place a door or removable wall panel opposite the tube sheet to provide pull space without dedicating floor area plate heat exchanger need space to slide plate out along the frame air handler coil need a removal path which is often forgotten in"},{"k":"Guide","u":"/guides/refrigerant-regulations-and-low-gwp-options-in-canada/","t":"Refrigerant regulations and low-GWP options in Canada","s":"Learn how federal regulations and the HFC phase-down affect HVAC equipment in Canada, which low-GWP refrigerants are replacing the old ones, and what owners should consider when buying or servicing equipment.","nh":"chiller boiler and central plant the regulatory framework federal regulation provincial and territorial rule safety code csa b52 safety classification common refrigerant and their replacement what this mean for owner buying new equipment managing existing equipment leak management frequently asked question do i have to replace my r 410a rooftop unit now are a2l refrigerant safe in occupied building is co2 practical for commercial hvac key takeaway","nb":"refrigerant in canadian hvac equipment are going through their biggest change since the phase out of cfc hydrofluorocarbon hfc such as r 410a r 134a and r 404a do not deplete ozone but they are powerful greenhouse gase canada is reducing their use under the kigali amendment to the montreal protocol and equipment manufacturer are moving to refrigerant with much lower global warming potential gwp for owner and designer this affect what equipment can be bought how machine room and occupied space must be designed how technician must be trained and how long existing equipment can be economically serviced the regulatory framework refrigerant rule in canada come from several level of government federal regulation the federal ozone depleting substance and halocarbon alternative regulation odshar made under the canadian environmental protection act 1999 control the import manufacture and use of ozone depleting substance and hfc they include two main tool for hfc a consumption phase down canada allowable hfc consumption measured in co2 equivalent tonne is being reduced in step from a baseline the schedule follow the kigali amendment for developed country a 10 percent reduction in 2019 40 percent in 2024 70 percent in 2029 80 percent in 2034 and 85 percent from 2036 onward product gwp limit certain category of new product manufactured in or imported into canada cannot use hfc above a set gwp for example new chiller have been limited to refrigerant with a gwp of 750 or less since january 1 2025 other limit apply to specific refrigeration and foam product the phase down doe not ban existing equipment system already installed can keep operating and be serviced but the supply of high gwp hfc will tighten over time and price may rise accordingly federal regulation are amended periodically check the current text of odshar and environment and climate change canada guidance before finalizing an equipment specification provincial and territorial rule province and territory regulate the"},{"k":"Guide","u":"/guides/thermal-energy-storage-ice-and-chilled-water/","t":"Thermal energy storage: ice and chilled water","s":"Learn how thermal energy storage works, the differences between ice and chilled water systems, and how utility rates, plant size and resilience goals decide whether it makes sense.","nh":"chiller boiler and central plant how storage create value chilled water storage characteristic ice storage common ice storage type characteristic full vs partial storage design and operation storage and electrification frequently asked question doe thermal storage save energy is storage practical for a small building key takeaway","nb":"thermal energy storage tes let a cooling plant make chilled water or ice at one time and use it later most commonly chiller run at night when electricity is cheaper and demand on the grid is lower and the stored cooling is used during the afternoon peak storage can reduce peak electrical demand shrink chiller plant size and provide backup cooling when chiller are offline storage is not new many large campuse and district system have used it for decade change in utility rate structure peak demand program and electrification are renewing interest in canada this guide explain the main technology operating strategy and the factor that determine whether storage make sense how storage create value benefit how it work lower demand charge chiller run less during peak hour cutting the building peak kw lower energy cost more cooling energy is bought at off peak rate where time of use pricing apply smaller chiller plant chiller are sized for average rather than peak load in partial storage design capacity for growth adding storage can meet new load without new chiller resilience stored cooling can carry critical load during chiller failure or power interruption grid support load shifting help utility manage peak sometime with incentive value depend heavily on the utility rate structure large demand charge time of use energy rate or program that charge customer based on demand during system peak hour make storage more attractive in ontario for example large customer share of certain electricity cost is based on their demand during a small number of province wide peak hour which give strong incentive to shift load rate structure vary by province and utility and change over time so analysis must use current tariff see utility incentive for hvac upgrade in canada chilled water storage chilled water storage use a large insulated tank usually stratified cold water being denser stay at the bottom while warmer return water sit at the top separated by a thin transition layer called the"},{"k":"Guide","u":"/guides/water-cooled-vs-air-cooled-chillers/","t":"Water-cooled vs air-cooled chillers","s":"Learn how water-cooled and air-cooled chiller plants differ in efficiency, water use, space, maintenance and winter operation, and which factors usually decide the choice.","nh":"chiller boiler and central plant how they differ efficiency water use space and structure noise maintenance and risk winter operation in canada cost choosing between them frequently asked question can i convert from water cooled to air cooled are there hybrid option key takeaway","nb":"every chiller must reject the heat it remove from the building plus the energy its compressor use air cooled chiller reject that heat directly to outdoor air through finned condenser coil and fan water cooled chiller reject it to a condenser water loop which carry it to a cooling tower where evaporation release it to the atmosphere the choice affect efficiency water consumption plant layout maintenance and winter operation neither is universally better this guide compare them on the factor that usually decide the question for canadian project how they differ factor air cooled water cooled heat rejection limited by outdoor dry bulb temperature outdoor wet bulb temperature typical full load efficiency lower higher equipment chiller outdoor roof or grade chiller indoor plus cooling tower condenser pump and water treatment water use essentially none continuous evaporation and blowdown indoor space little or none mechanical room for chiller and pump maintenance coil cleaning fan tower cleaning water treatment legionella program condenser tube cleaning capacity range small to mid size large plant use many unit mid size to very large winter operation simpler but freeze protection needed tower freeze protection and control needed efficiency water cooled chiller are more efficient because wet bulb temperature is lower than dry bulb often by a considerable margin on hot day and because water is a better heat transfer medium than air lower condensing temperature mean lower compressor lift and less energy typical full load efficiency differ significantly a large water cooled centrifugal chiller may operate in the range of roughly 0 5 to 0 6 kw ton cop about 5 9 to 7 0 at design while air cooled chiller commonly operate around 1 0 to 1 3 kw ton cop about 2 7 to 3 5 including condenser fan necb minimum efficiency table reflect a similar gap water cooled plant also need condenser pump and tower fan which should be included in any comparison at part load and in cooler weather both "},{"k":"Guide","u":"/guides/waterside-economizers-and-free-cooling-in-canada/","t":"Waterside economizers and free cooling in Canada","s":"Learn how waterside economizers produce chilled water from cooling towers or dry coolers in cold weather, how to arrange and control them, and where they pay off in Canada.","nh":"chiller boiler and central plant how a waterside economizer work when free cooling is available integrated vs non integrated arrangement integrated sery economizer non integrated parallel economizer design consideration for canadian climate freeze protection heat exchanger selection chiller start up and transition pumping control water use frequently asked question is an airside economizer better than a waterside economizer can an existing chiller plant add a waterside economizer key takeaway","nb":"many canadian building need cooling in winter interior office zone data room laboratory hospital and process load produce heat year round and the chiller that serve them often keep running while snow fall outside a waterside economizer take advantage of cold outdoor condition to produce chilled water directly using cooling tower or dry cooler and a heat exchanger instead of compressor canada climate make waterside free cooling especially attractive many location have long period with wet bulb temperature well below what is needed to produce chilled water this guide explain how waterside economizer work how to arrange them and the design issue specific to cold climate how a waterside economizer work in cold weather a cooling tower can produce condenser water colder than the chilled water return temperature a plate and frame heat exchanger transfer heat from the chilled water loop to that cold condenser water when condition allow the heat exchanger carry the full load and the chiller shut off in partial economizer mode it pre cool return water before it reache the chiller alternative arrangement include closed circuit fluid cooler or dry cooler with glycol connected through a heat exchanger or directly to a glycol chilled water loop air cooled chiller with integral free cooling coil which pass returning glycol through an outdoor coil ahead of the chiller evaporator strainer cycle or direct tower water use where tower water passe directly into the chilled water system this is generally discouraged because it contaminate the closed loop when free cooling is available free cooling capacity depend on the chilled water temperature the building need and the approach temperature of the tower and heat exchanger roughly the tower must produce water colder than the required chilled water supply temperature by the heat exchanger approach often about 1 to 2 k 2 to 4 f the tower in turn produce water warmer than the outdoor wet bulb by its approach which widen at low wet bulb and "},{"k":"Guide","u":"/guides/cold-climate-heat-pumps-for-commercial-buildings/","t":"Cold climate heat pumps for commercial buildings","s":"Learn what makes a heat pump suitable for cold climates, how capacity and efficiency change with outdoor temperature, and how to design backup heat, defrost and controls for commercial buildings in Canada.","nh":"rooftop unit vrf and packaged system what make a heat pump cold climate how performance change with temperature design step for commercial system backup and supplementary heat defrost application in commercial building control frequently asked question can a heat pump heat a commercial building in edmonton or winnipeg are heat pump cheaper to run than gas how long do cold climate heat pump last key takeaway","nb":"air source heat pump have improved dramatically over the past two decade variable speed compressor vapour injection and better refrigerant circuit now let many model deliver useful heat well below 20 c 4 f and some continue operating below 25 c 13 f these cold climate heat pump are a central technology for electrifying commercial heating in canada they are not magic though heating capacity and efficiency both fall as outdoor temperature drop just when the building need the most heat designing a commercial system that work in edmonton or winnipeg not just in vancouver require attention to capacity at design condition backup heat defrost and control what make a heat pump cold climate there is no single regulatory definition in canada but the term usually mean a heat pump designed to maintain a high share of its rated capacity and a reasonable cop at low outdoor temperature common feature include variable speed inverter compressor that can run faster at low temperature to maintain capacity vapour injection or enhanced vapour injection which improve capacity and efficiency at high compression ratio larger outdoor coil and optimized refrigerant circuit smart defrost control that defrost only when needed base pan heater and drainage that prevent ice build up in north america the northeast energy efficiency partnership neep cold climate air source heat pump specification is widely used to identify qualifying product mainly residential and light commercial it set minimum performance at 15 c 5 f including a cop of at least 1 75 at maximum capacity and require reporting of performance at other low temperature utility incentive program in canada often reference it or similar criteria how performance change with temperature the colder it is outside the more work the compressor must do to lift heat to indoor temperature typical trend for a cold climate unit look like this outdoor temperature heating capacity share of rated cop typical range 8 c 47 f 100 percent rating point abou"},{"k":"Guide","u":"/guides/computer-room-air-conditioners-vs-comfort-cooling/","t":"Computer room air conditioners vs comfort cooling","s":"Learn how computer room air conditioners differ from comfort cooling equipment, why comfort units often fail in IT rooms, and how to choose the right cooling for small server rooms through to data halls.","nh":"rooftop unit vrf and packaged system the key difference sensible heat ratio run hour and durability control and monitoring temperature and humidity target when is comfort cooling acceptable type of precision cooling free cooling in canadian climate redundancy frequently asked question why doe my server room comfort unit freeze up in winter do server room need humidity control can i use the building central air handler key takeaway","nb":"computer room server room and telecom space need cooling every hour of every day the heat they generate is almost entirely sensible from electronic equipment with very little moisture added by people comfort air conditioning designed for office and home is built around a different load a mix of sensible and latent heat occupied hour and comfort for people rather than protection of equipment a computer room air conditioner crac is designed for the it environment understanding the difference help owner decide when a comfort unit is acceptable typically in a small low risk closet and when precision cooling is worth the extra cost the key difference characteristic comfort cooling computer room air conditioner sensible heat ratio typically about 0 65 to 0 80 typically about 0 85 to 1 0 design run hour occupied hour seasonal 8 760 hour per year airflow per kw of cooling lower higher to match it airflow need temperature control thermostat with wide deadband tighter control often on supply or rack inlet temperature humidity control incidental dehumidification only optional humidification and dehumidification control low ambient operation often limited designed for year round cooling including winter redundancy and alarm rarely included built in alarm communication and redundancy feature rating standard csa c746 ahri 210 240 or 340 360 ashrae standard 127 for computer room unit sensible heat ratio sensible heat ratio shr is the share of a cooling unit capacity that lower air temperature rather than removing moisture comfort unit are designed to remove a significant amount of moisture because office and home have people outdoor air and latent load in an it room that dehumidification is mostly wasted worse continuous dehumidification can drive humidity well below recommended level and the unit sensible capacity may be lower than its nominal rating suggest a crac is designed with higher airflow and coil characteristic that give an shr close to 1 0 at typical it room condition s"},{"k":"Guide","u":"/guides/ductless-mini-splits-in-commercial-applications/","t":"Ductless mini-splits in commercial applications","s":"Learn where ductless mini-splits make sense in commercial buildings, how to select and locate them, and the common pitfalls with ventilation, condensate, cold weather and maintenance.","nh":"rooftop unit vrf and packaged system where mini split work well selection size from a load calculation check heating capacity at design temperature single zone versus multi zone ventilation is not included placement and installation indoor unit outdoor unit refrigerant piping and condensate code and safety consideration control maintenance frequently asked question can a mini split be the only heat source in a canadian commercial space is a mini split enough for a server closet do mini split need balancing key takeaway","nb":"a ductless mini split is a small split system heat pump or air conditioner with an outdoor condensing unit connected by refrigerant piping to one or a few indoor unit the indoor unit are usually wall mounted ceiling cassette floor console or compact concealed unit with very short duct single zone system have one indoor unit per outdoor unit multi zone system connect two to several indoor unit to one outdoor unit mini split started in residential use but are now common in small commercial space and as targeted solution in larger building they are inexpensive quick to install and efficient they are also easy to misapply because a unit that solve a temperature problem doe nothing for ventilation humidity in some case or code required feature where mini split work well application why it fit watch for small office clinic and shop simple low cost heating and cooling for a few room ventilation must still be provided electrical and telecom room dedicated cooling independent of building schedule year round cooling low ambient operation redundancy addition and renovation avoid extending central system refrigerant piping route condensate exterior unit location problem zone supplement a central system in a hot or cold room can mask the real cause of the problem heritage and older building small pipe avoid large ductwork wall penetration appearance heritage approval portable classroom and site trailer self contained durability control ventilation electrification of small building replace oil propane or electric baseboard cold climate capacity they are generally a poor fit for large open space space with high ventilation need lab kitchen or space needing precise humidity control selection size from a load calculation even for small space size from a load calculation rather than floor area alone an oversized mini split short cycle reduce dehumidification and waste energy room with high internal load such as server closet may need far more capacity than floor area suggest room wit"},{"k":"Guide","u":"/guides/heat-recovery-vrf-vs-heat-pump-vrf/","t":"Heat recovery VRF vs heat pump VRF","s":"Learn how heat pump and heat recovery VRF systems differ, which buildings benefit from simultaneous heating and cooling, and how zoning decisions determine whether either type keeps occupants comfortable.","nh":"rooftop unit vrf and packaged system how heat pump vrf work how heat recovery vrf work comparing the two when heat recovery pay off zoning decision zoning for heat pump vrf zoning for heat recovery vrf cold climate consideration ventilation interaction frequently asked question can a heat pump vrf system be converted to heat recovery later is heat recovery vrf alway more efficient which is better for a hotel key takeaway","nb":"variable refrigerant flow system come in two main configuration in a heat pump vrf system all indoor unit connected to one outdoor unit operate in the same mode they all heat or they all cool in a heat recovery vrf system individual indoor unit can heat or cool independently and the system move heat from zone that need cooling to zone that need heating the choice affect first cost comfort energy use and how the building must be zoned neither type is better in every case the right answer depend on how often the building has heating and cooling demand at the same time and on whether zone with different need can be grouped onto separate system how heat pump vrf work a heat pump vrf system use two refrigerant pipe a liquid line and a gas line running from the outdoor unit to the indoor unit the outdoor unit set the system mode based on a priority rule for example majority demand a master thermostat or outdoor temperature when the system is in cooling mode indoor unit calling for heat cannot get it they typically switch their fan to low or off and wait until the system change over that is acceptable when all zone on the system have similar load such as room facing the same orientation interior zone with similar internal gain space with similar occupancy schedule it become a comfort problem when one system serve zone with very different load for example a south facing perimeter office and a north facing one on a sunny day in spring or a meeting room full of people next to an empty office how heat recovery vrf work heat recovery vrf add the ability to serve heating and cooling simultaneously manufacturer use two main approache three pipe system use a liquid line a high pressure hot gas line and a low pressure suction gas line branch selector boxe at each zone or group of zone connect the indoor unit to the appropriate line for heating or cooling two pipe system use a central branch controller that separate refrigerant into liquid and gas and distribute it to indoor unit in"},{"k":"Guide","u":"/guides/make-up-air-units-direct-fired-and-indirect-fired/","t":"Make-up air units: direct-fired and indirect-fired","s":"Learn how direct-fired and indirect-fired make-up air units heat outdoor air, the code and safety rules that limit where each can be used, and how to size and control them for kitchens, warehouses and industrial spaces.","nh":"rooftop unit vrf and packaged system direct fired make up air unit advantage limitation indirect fired make up air unit advantage limitation comparison sizing a make up air unit airflow heating capacity supply temperature control commercial kitchen testing and balancing frequently asked question can a direct fired unit be used in an office why is my kitchen cold in winter do make up air unit need energy recovery key takeaway","nb":"a make up air unit mua replace air that is exhausted from a building kitchen hood paint booth industrial process exhaust parking garage fan and large general exhaust system all remove air that must come from somewhere without make up air the building goe negative door are hard to open exhaust hood underperform combustion appliance can backdraft and cold outdoor air leak in through every crack in canada the outdoor air an mua bring in must usually be heated for much of the year sometime from 30 c 22 f or colder most gas fired mua are either direct fired or indirect fired and the difference matter for efficiency safety cost and where the unit is allowed direct fired make up air unit in a direct fired unit a gas burner sit directly in the airstream outdoor air passe over the flame and all the product of combustion mainly carbon dioxide and water vapour with small amount of carbon monoxide and nitrogen oxide enter the supply air advantage very high heating efficiency nearly all the fuel heat goe into the air because there is no heat exchanger or flue losing heat high temperature rise and wide modulation allowing control from mild to severe cold weather simple construction with no heat exchanger to crack or corrode lower cost for a given capacity limitation combustion product enter the space so unit are designed and certified to limit concentration product standard for direct gas fired heater set limit on co co2 and no2 added to the airstream traditional direct fired make up air heater are designed for 100 percent outdoor air and must not recirculate building air recirculating direct fired heater exist under a separate product standard with additional requirement for ventilation and control and are mainly used in industrial and warehouse space moisture added by combustion can contribute to condensation in cold building not appropriate for many occupancy such as sleeping area and use may be restricted by the authority having jurisdiction direct fired unit are certified to"},{"k":"Guide","u":"/guides/packaged-terminal-units-and-hotel-hvac/","t":"Packaged terminal units and hotel HVAC","s":"Learn how packaged terminal air conditioners and heat pumps work, why they remain common in hotels and apartments, and the ventilation, cold weather, noise and control issues to address when using or replacing them.","nh":"rooftop unit vrf and packaged system type of packaged terminal unit why hotel use them limitation efficiency cold weather performance air leakage and envelope noise ventilation ventilation for hotel room control and energy management replacing or upgrading packaged terminal unit maintenance frequently asked question do ptac meet ventilation requirement on their own why do ptac use so much electricity in winter are pthp a good electrification choice key takeaway","nb":"packaged terminal unit are self contained heating and cooling unit installed through an exterior wall usually under a window they are the familiar boxe found in hotel room motel senior residence apartment and some office the most common type are the packaged terminal air conditioner ptac typically with electric resistance heat and the packaged terminal heat pump pthp these unit are inexpensive simple to replace and give each room its own control they also have well known weaknesse noise limited efficiency air leakage through the wall sleeve and in most case no reliable ventilation in canadian climate cold weather performance is an added concern type of packaged terminal unit type description typical heating ptac through wall unit with compressor coil and fan in one chassis electric resistance sometime hot water or steam coil pthp same form with a reversing valve for heat pump operation heat pump with electric resistance backup vertical packaged unit vpac or vtac installed in a closet connected to an exterior louvre can serve short duct to adjacent room electric heat pump or hydronic single packaged vertical unit spvu larger vertical unit often for classroom or small office electric heat pump or gas all share the same basic layout an indoor coil and fan facing the room a compressor and outdoor coil facing the exterior louvre and a wall sleeve that hold the chassis why hotel use them low first cost per room compared with central system individual room control so each guest set their own temperature simple replacement a failed chassis can be swapped in minute often with a spare kept on site no central plant ductwork or refrigerant piping between room room level energy saving since unoccupied room can be set back or turned off limitation efficiency ptac and pthp efficiency is limited by their compact size minimum efficiency are set federally and through energy code newer unit with variable speed compressor and improved design are available but packaged terminal unit gen"},{"k":"Guide","u":"/guides/replacing-rooftop-units/","t":"Replacing rooftop units: what to check first","s":"Learn what to check before replacing a packaged rooftop unit, from load and airflow to curbs, roof structure, utilities, controls and permits, so the new unit fits and performs better than the old one.","nh":"rooftop unit vrf and packaged system 1 confirm why the unit is being replaced 2 check the load and the space use 3 measure the existing airflow 4 curb and roof structure 5 electrical service 6 gas supply and venting 7 heating source decision 8 ventilation and economizer 9 control and integration 10 code permit and documentation after installation frequently asked question can i just replace the unit with the same tonnage how long doe a rooftop replacement take should i replace several unit at once key takeaway","nb":"most rooftop unit rtus are replaced either in a hurry after a failure on a hot day or as part of a capital plan with time to think the hurried replacement almost alway mean a like for like swap same tonnage same curb same control that can be the right answer but often it lock in problem that a little checking would have solved replacement is a rare opportunity the roof is open a crane is on site and the next chance to change anything may be 15 or 20 year away spending a few hour on the check below ideally before the old unit fail pay off in comfort energy and avoided surprise 1 confirm why the unit is being replaced start by understanding the old unit history age and condition compressor heat exchanger coil cabinet and curb service record recurring failure refrigerant leak cracked heat exchanger complaint hot or cold zone humidity noise draft refrigerant type r 22 unit are increasingly expensive to service and r 410a service cost are expected to rise as hfc supply decline if the unit is failing early find out why short cycling from oversizing poor airflow low voltage or bad drainage will affect the new unit too 2 check the load and the space use building change lighting has moved to led tenant have changed wall have moved and window may have been replaced a unit sized 20 year ago may no longer match the space review current use and occupancy of the zone served do a load calculation or at least a simplified check for cooling and heating compare with the old unit capacity and with any complaint a unit that never kept up may be undersized one that short cycle may be oversized confirm the ventilation requirement for the current use under ashrae 62 1 or the code referenced standard right sizing often reduce capacity which lower first cost and improve humidity control 3 measure the existing airflow before the old unit is removed measure its supply airflow outdoor airflow and external static pressure these number tell you whether the duct system can carry the design airflo"},{"k":"Guide","u":"/guides/rooftop-unit-selection-for-commercial-buildings/","t":"Rooftop unit selection for commercial buildings","s":"Learn the main decisions in selecting a packaged rooftop unit, from capacity and heating source to economizers, ventilation, efficiency ratings and the options that matter most in cold Canadian climates.","nh":"rooftop unit vrf and packaged system start with an accurate load cooling capacity and airflow heating option ventilation and economizer outdoor air economizer efficiency rating fan and control physical and site consideration useful option frequently asked question should i match the tonnage of the old unit is a heat pump rtu practical in canada how long do rtus last key takeaway","nb":"packaged rooftop unit rtus are the most common hvac system in low rise commercial building across canada retail store strip mall restaurant school warehouse and single storey office all rely on them an rtu contain the fan filter cooling coil compressor condenser and heating section in one weatherproof cabinet connected to ductwork through a roof curb because rtus are a mature mass produced product it is tempting to pick one from a catalogue based on tonnage alone that shortcut cause many of the comfort complaint high energy bill and early failure seen in rtu served building good selection balance capacity airflow heating ventilation efficiency and climate start with an accurate load rtu capacity should come from a proper load calculation not a rule of thumb or the size of the unit being replaced use a commercial cooling load calculation and a heating load calculation based on outdoor design condition for the location as listed in the national building code of canada climatic data or the applicable provincial code key output for selection total and sensible cooling load because rtus have a fixed sensible heat ratio at a given airflow heating load including ventilation air heating at the winter design temperature required outdoor air from ashrae 62 1 or the code referenced ventilation standard design supply airflow based on sensible load and supply air temperature oversizing is common and costly an oversized rtu short cycle remove little moisture wear compressor and cost more to buy and run cooling capacity and airflow rtu cooling capacity is rated at standard condition under csa c746 in canada and ahri 340 360 in the us actual capacity depend on outdoor temperature entering air condition and airflow when selecting check capacity at your local summer design dry bulb and entering wet bulb temperature not just the nominal rating confirm that the sensible capacity meet the sensible load high latent space such as restaurant and assembly area may need lower airflow or a un"},{"k":"Guide","u":"/guides/vrf-design-refrigerant-piping-leak-limits-and-csa-b52/","t":"VRF design: refrigerant piping, leak limits and CSA B52","s":"Learn how VRF piping is laid out and sized, how designers check refrigerant quantity against room volume under CSA B52, and the mitigation options available when a small room fails the check.","nh":"rooftop unit vrf and packaged system vrf piping basic layout sizing and capacity correction installation requirement why refrigerant concentration matter the concentration check when a space fail the check a2l refrigerant and vrf practical design tip frequently asked question doe csa b52 apply to every vrf system can leak detector alone solve a failed room key takeaway","nb":"a variable refrigerant flow system is unusual among commercial hvac system because the refrigerant itself is the distribution medium instead of chilled water or air refrigerant run through pipe into ceiling corridor and occupied room that bring efficiency and compact distribution but it also mean the whole refrigerant charge of a system could in principle leak into a single room csa b52 the mechanical refrigeration code set rule to keep the concentration of leaked refrigerant in occupied space below safe limit getting this right at design stage avoid expensive change later when an authority having jurisdiction or a reviewer find that a small office or hotel room cannot legally be served as drawn vrf piping basic layout a typical vrf piping network run from the outdoor unit through a main line then split at branch fitting refnet or header to feed individual indoor unit heat recovery system add branch controller or mode change boxe that direct refrigerant to unit in heating or cooling manufacturer publish strict limit for each product line including maximum total piping length maximum length from the outdoor unit to the farthest indoor unit maximum length from the first branch to the farthest indoor unit maximum vertical separation between the outdoor unit and indoor unit and between indoor unit combination ratio the sum of indoor unit capacity relative to outdoor unit capacity these limit differ between manufacturer and model so the piping design must be based on the selected product and checked with the manufacturer selection software sizing and capacity correction pipe size are chosen by the manufacturer software based on connected capacity downstream of each section long run and large elevation difference reduce capacity because of pressure drop and the effect of the refrigerant column the software apply correction factor designer should check corrected capacity not nominal one against load installation requirement use refrigerant grade copper of the specified wal"},{"k":"Guide","u":"/guides/variable-refrigerant-flow-vrf-systems/","t":"Variable refrigerant flow (VRF) systems explained","s":"Learn how a VRF system moves refrigerant to multiple indoor units from one outdoor unit, what makes it efficient, where it works well and the limitations owners should understand before choosing it.","nh":"rooftop unit vrf and packaged system how a vrf system work system type indoor unit style why owner choose vrf limitation to understand ventilation is separate cold climate heating capacity refrigerant in occupied space proprietary component and control installation quality typical application commissioning and maintenance frequently asked question is vrf more efficient than a chiller and boiler system how long do vrf system last can vrf handle a whole building key takeaway","nb":"variable refrigerant flow vrf sometime called variable refrigerant volume vrv is a type of heat pump system in which one outdoor unit serve many indoor unit through a network of refrigerant pipe the outdoor unit use variable speed compressor to match its output to the combined demand of the indoor unit and each indoor unit has its own electronic expansion valve to control how much refrigerant it receive vrf system are common in office school hotel multi unit residential building and retrofit of older building they offer individual zone control good part load efficiency and small distribution pipe in place of large duct they also bring specific design challenge especially in cold climate and around refrigerant safety how a vrf system work a vrf system is essentially a large multi zone split heat pump the outdoor unit contain one or more variable speed compressor a heat exchanger and a fan refrigerant piping run from the outdoor unit to indoor unit throughout the building each indoor unit has a fan a coil and an electronic expansion valve controlled by its own thermostat the system controller adjust compressor speed to hold a target refrigerant pressure so total capacity follow total demand in cooling mode indoor coil act as evaporator and the outdoor coil reject heat in heating mode the cycle reverse indoor coil act as condenser and the outdoor coil extract heat from outdoor air system type type description heat pump vrf all indoor unit on a system heat or cool at the same time heat recovery vrf some indoor unit can heat while other cool with heat moved between them water source vrf the outdoor unit is replaced by a water cooled condensing unit connected to a building water loop our guide to heat recovery vrf vs heat pump vrf explain the choice in more detail indoor unit style ducted unit concealed in ceiling serving one or several room through short duct run ceiling cassette common in open office and retail wall mounted unit common in hotel room and small office flo"},{"k":"Guide","u":"/guides/water-source-heat-pump-systems/","t":"Water source heat pump systems","s":"Learn how a water source heat pump system moves heat around a building through a common water loop, how the loop is kept within its temperature range, and the design and maintenance issues that decide its performance.","nh":"rooftop unit vrf and packaged system how the system work loop temperature control advantage limitation design consideration pumping and flow heat rejection heat addition ventilation water treatment retrofit opportunity in existing wshp building maintenance frequently asked question is a wshp system the same as geothermal how efficient are wshp system do wshp system need balancing key takeaway","nb":"a water source heat pump wshp system use many small heat pump distributed throughout a building all connected to a common water loop each heat pump either extract heat from the loop to warm its zone or reject heat into the loop to cool its zone a central boiler or other heat source add heat when the loop get too cold and a cooling tower fluid cooler or ground loop remove heat when it get too warm wshp system have been used in canadian office school hotel and multi unit residential building for decade they provide individual zone control and recover heat naturally between zone when paired with a geothermal loop or another low carbon heat source they are also a practical route to electrified heating how the system work each zone has its own heat pump typically a horizontal unit above the ceiling a vertical unit in a closet or a console each heat pump has a compressor a refrigerant to water heat exchanger a refrigerant to air coil a reversing valve and a fan a pumped water loop run through the building connecting every heat pump in cooling mode a heat pump reject heat into the loop in heating mode it absorb heat from the loop when interior zone are cooling and perimeter zone are heating heat move through the loop from one to the other reducing the need for central heating or cooling loop temperature control the loop is kept within a temperature band suitable for the heat pump for a conventional boiler and tower loop a typical range is about 15 to 32 c 60 to 90 f ground coupled loop operate over a wider range often from near freezing or below with antifreeze to about 35 c 95 f because the ground act as both heat source and sink loop type heat added by heat removed by typical operating range boiler and tower loop boiler through heat exchanger or directly closed circuit fluid cooler or open tower with heat exchanger about 15 to 32 c 60 to 90 f ground source loop ground heat exchanger ground heat exchanger about 0 to 35 c 32 to 95 f often with glycol hybrid loop ground plu"},{"k":"Guide","u":"/guides/ashrae-standard-62-1-ventilation-rate-procedure/","t":"ASHRAE Standard 62.1 ventilation rate procedure","s":"Learn how the ASHRAE 62.1 ventilation rate procedure calculates outdoor air for a zone and a system, with worked steps, typical rates and notes on how Canadian codes reference the standard.","nh":"ventilation and indoor air quality which edition apply step 1 breathing zone outdoor airflow typical rate step 2 zone air distribution effectiveness step 3 zone outdoor airflow step 4 system outdoor air intake single zone system 100 percent outdoor air system multiple zone recirculating system a worked example single zone dynamic reset and demand control other requirement in 62 1 verifying ventilation in operation frequently asked question doe 62 1 apply to house why doe my multiple zone system need so much outdoor air key takeaway","nb":"ashrae standard 62 1 ventilation and acceptable indoor air quality is the most widely used method for setting outdoor air rate in commercial and institutional building in north america in canada the national building code and most provincial building code require ventilation system in building outside the scope of part 9 housing to be designed to ashrae 62 1 usually a specific edition referenced in the code healthcare space are typically governed by csa z317 2 instead the standard offer several procedure the ventilation rate procedure vrp is the prescriptive one and the most commonly used it set minimum outdoor air for each zone based on occupancy and floor area then calculate how much outdoor air the air handling system must bring in to deliver those amount which edition apply because code reference a specific edition the rate and equation you must use depend on the code in force for your project not on the newest version of the standard edition differ in detail such as default occupant density zone air distribution effectiveness value and the method for calculating multiple zone system efficiency confirm the referenced edition with the applicable code and the authority having jurisdiction before starting the procedure below follow the general structure common to recent edition step 1 breathing zone outdoor airflow for each zone the outdoor air required in the breathing zone combine a people component and an area component vbz rp x pz ra x az where vbz is breathing zone outdoor airflow in l s cfm rp is the outdoor air rate per person from the standard table for the occupancy category pz is the zone population the largest number of people expected in the zone during typical use ra is the outdoor air rate per unit area from the same table az is the zone floor area the two component exist because some contaminant come from people bioeffluent and their activity and other from the building and its furnishing typical rate these value appear in recent edition of the stand"},{"k":"Guide","u":"/guides/airborne-infection-control-in-commercial-hvac/","t":"Airborne infection control in commercial HVAC","s":"Learn the layered HVAC measures that reduce airborne transmission of infectious aerosols, how ASHRAE Standard 241 frames them, and how to apply them in offices, schools and other non-healthcare buildings.","nh":"ventilation and indoor air quality how hvac affect airborne risk equivalent clean airflow the layered approach ventilation filtration portable and in room air cleaner germicidal ultraviolet airflow pattern and humidity comparing option technology to evaluate carefully healthcare and higher risk space practical step for owner key takeaway","nb":"infectious respiratory aerosol the small particle people exhale when they breathe talk cough or sing can stay suspended in indoor air for minute to hour and travel well beyond close contact distance hvac system cannot eliminate transmission but they strongly influence how quickly those aerosol are diluted captured or inactivated since 2020 owner of office school retail and assembly building have asked what their system can realistically do and the industry now has a dedicated standard to answer that question this guide cover the layered measure available how ashrae standard 241 organize them and practical step for non healthcare commercial building hospital and other healthcare facility follow csa z317 2 and their own infection prevention requirement discussed briefly at the end how hvac affect airborne risk risk from long range airborne transmission in a room depend on how many infectious particle are released how long people stay and how fast those particle are removed from the breathing zone hvac system control the last factor particle are removed by dilution with clean outdoor air filtration of recirculated air either centrally or with in room air cleaner inactivation by germicidal ultraviolet light or other technology deposition on surface which hvac doe not meaningfully control hvac has little effect on close range transmission between people in conversation which is why ventilation measure complement rather than replace other public health measure equivalent clean airflow ashrae standard 241 control of infectious aerosol published in 2023 introduced the concept of equivalent clean airflow rather than specifying outdoor air alone it add together every route that deliver pathogen free air to the breathing zone outdoor air supplied to the space recirculated air multiplied by the single pass efficiency of the filter treating it clean air delivery from in room air cleaner based on tested clean air delivery rate cadr effective inactivation from germicidal uv system"},{"k":"Guide","u":"/guides/building-pressurization-and-infiltration-control/","t":"Building pressurization and infiltration control","s":"Learn what drives air leakage through the envelope, why a slight positive pressure matters, and how designers, balancers and operators keep building pressure under control.","nh":"ventilation and indoor air quality what drive air through the envelope stack effect wind mechanical system why pressure matter the design approach start with an airtight envelope set a pressurization target build an airflow balance manage the stack effect controlling pressure in operation testing and verification frequently asked question should a building be positive or negative why is my lobby cold even though the heating work key takeaway","nb":"door that whistle or will not close lobby that are freezing in january condensation on the upper floor of a tower and kitchen odour drifting into the dining room are all symptom of the same problem building pressure that is out of control in canadian climate where the indoor outdoor temperature difference can exceed 40 c 72 f in winter uncontrolled air movement through the envelope waste energy and can damage the building itself this guide explain what drive infiltration and exfiltration how hvac system influence building pressure and how to design balance and verify a building that behave what drive air through the envelope air move through crack and opening whenever there is a pressure difference across them three force create that difference stack effect warm indoor air is less dense than cold outdoor air in winter this make a building act like a chimney air leak in at the lower floor rise through shaft stairwell and elevator hoistway and leak out at the upper floor the neutral pressure plane is the height where indoor and outdoor pressure are equal stack pressure grow with building height and temperature difference so a 20 storey tower in edmonton in january can see pressure difference of ten of pascal at the top and bottom floor in summer with air conditioning the effect reverse but is much weaker wind wind create positive pressure on the windward face and negative pressure on the leeward face and roof wind effect fluctuate constantly and are hard to control mechanically which is why airtight construction matter mechanical system supply and exhaust fan can push a building positive or pull it negative an imbalance of only a few percent of supply airflow can overwhelm natural force in a tight building exhaust heavy space such as kitchen lab and washroom and economizer operation without proper relief are common culprit why pressure matter condition typical symptom risk building too negative cold draft door pulled shut dust and odour entering frozen coil and pipe n"},{"k":"Guide","u":"/guides/condensation-and-mould-prevention/","t":"Condensation and mould prevention","s":"Learn the dew point principles behind condensation, the most common problem areas in commercial buildings, and the HVAC and envelope measures that keep surfaces dry and mould-free.","nh":"ventilation and indoor air quality the dew point principle winter condensation window and frame thermal bridge inside the envelope summer condensation duct pipe and equipment diffuser and grille ceiling plenum and crawlspace cooling coil and drain pan common problem area and remedy hvac measure for prevention finding problem early key takeaway","nb":"mould need three thing spore which are everywhere food such as drywall paper wood or dust and moisture in building moisture is the only one we can practically control condensation the moisture that form when humid air meet a cold surface is one of the most common source and in canada it show up in both season on cold window and inside wall in winter and on chilled water pipe duct and diffuser in summer this guide explain why condensation form where it typically appear in commercial building and how hvac design and operation prevent it the dew point principle air hold water vapour the dew point is the temperature at which that vapour begin to condense any surface colder than the dew point of the air touching it will collect condensation at 21 c 70 f and 40 percent rh the dew point is roughly 7 c 45 f at 21 c and 60 percent rh it rise to about 13 c 55 f this is why a window frame that stay dry at modest humidity can stream with water when humidity rise the psychrometric guide explain these relationship in more detail mould doe not need liquid water sustained surface relative humidity above roughly 80 percent which can occur on surface a few degree above the dew point can support growth on many material preventing mould mean keeping surface comfortably warm relative to the air dew point not just above it winter condensation window and frame in winter the coldest interior surface are usually window glass edge frame and mullion especially with older double glazing or non thermally broken aluminium frame condensation form when indoor humidity is high relative to those surface temperature humidification target must account for this building in edmonton or winnipeg often cannot sustain 40 percent rh in january without frost on window see humidification in cold climate thermal bridge slab edge balcony connection steel stud uninsulated lintel and penetration create cold spot on interior surface mould often appear in pattern that trace these element inside the envelope the mor"},{"k":"Guide","u":"/guides/dehumidification-strategies-for-commercial-buildings/","t":"Dehumidification strategies for commercial buildings","s":"Learn where latent loads come from, how each dehumidification method works, and how to choose a strategy that controls humidity without wasting energy.","nh":"ventilation and indoor air quality why humidity control matter where latent load come from how a cooling coil dehumidify dehumidification strategy overcool and reheat recovered heat reheat dedicated outdoor air system desiccant dehumidification dedicated dehumidifier variable airflow and coil control tactic comparing strategy designing and controlling for humidity key takeaway","nb":"most commercial building in canada spend more hour worrying about dry winter air than damp summer air so dehumidification is easy to overlook yet humid summer in southern ontario quebec and the maritime coastal moisture in vancouver and high internal moisture load in pool arena kitchen and densely occupied space all make humidity control a real design problem too much moisture lead to clammy occupant condensation on cold surface mould growth and damaged finishe why humidity control matter air temperature is only half of comfort two space at 23 c 73 f can feel very different if one is at 40 percent relative humidity rh and the other at 65 percent ashrae standard 55 use humidity as one of the input to thermal comfort and ashrae standard 62 1 require mechanical system that dehumidify to be designed so that space rh stay at or below 65 percent at the design outdoor dew point and design indoor latent load the bigger risk are physical sustained high humidity support mould growth on surface and in porous material and moist air reaching a cold surface below its dew point condense for more on that failure mode see condensation and mould prevention a typical comfort target for occupied commercial space is roughly 30 to 60 percent rh with many designer aiming to keep summer condition near or below about 55 to 60 percent rh special space such as museum cleanroom operating room and data center have their own target set by their governing standard where latent load come from latent load is the energy needed to remove water vapour the main source in commercial building are outdoor air brought in for ventilation usually the largest latent load on humid day people who release moisture through breathing and perspiration the latent share rise with activity level infiltration through the envelope especially in building running under negative pressure processe and open water such as pool kitchen dishwasher shower ice resurfacing and indoor plant the ratio of sensible to total cooling lo"},{"k":"Guide","u":"/guides/demand-controlled-ventilation-with-co2-sensors/","t":"Demand-controlled ventilation with CO2 sensors","s":"Learn how CO2 sensors can adjust outdoor air to match actual occupancy, how to set up the control logic so ventilation stays compliant, and the sensor and maintenance issues that decide whether it works.","nh":"ventilation and indoor air quality why co2 work as an occupancy indicator where dcv make sense how dcv fit with ashrae 62 1 choosing the co2 setpoint single zone and multiple zone system single zone system multiple zone vav system sensor selection location and calibration selection location calibration and check common problem commissioning dcv frequently asked question is 1 000 ppm a code limit can dcv cause poor air quality is dcv worth it in an open office key takeaway","nb":"most ventilation system are designed for the maximum number of people a space might hold yet a conference room for 20 is often empty a gymnasium is full for a few hour a day and an auditorium may sit idle for day delivering design outdoor air all the time mean heating cooling and dehumidifying air for people who are not there demand controlled ventilation dcv adjust outdoor air to match actual occupancy the most common way to estimate occupancy is to measure carbon dioxide co2 which people exhale at a fairly predictable rate in canadian climate where outdoor air must be heated for much of the year dcv can save a significant amount of energy in space with variable occupancy why co2 work as an occupancy indicator people exhale co2 in proportion to their metabolic rate in a space with steady occupancy and steady ventilation indoor co2 rise above outdoor level until the amount removed by outdoor air equal the amount generated the steady state difference between indoor and outdoor co2 is roughly indoor co2 outdoor co2 co2 generation per person outdoor air per person for an adult doing office work co2 generation is roughly 0 005 l s per person with about 7 5 l s 15 cfm of outdoor air per person the steady state difference work out to around 700 ppm lower ventilation per person produce a higher difference higher ventilation a lower one two caution matter co2 is an indicator not a measure of air quality at typical indoor level co2 itself is not the main concern it indicate how much outdoor air each person is getting but it say nothing about contaminant from furnishing cleaning product outdoor pollution or processe ashrae 62 1 doe not set an indoor co2 limit co2 respond slowly it take time for concentration to build after people arrive control sequence must account for this lag where dcv make sense dcv save the most in space with high design occupancy that vary a lot over time space type dcv benefit auditorium theatre place of worship high large design occupancy intermittent"},{"k":"Guide","u":"/guides/energy-recovery-ventilators-and-heat-recovery-ventilators/","t":"Energy recovery ventilators and heat recovery ventilators","s":"Understand the difference between heat and energy recovery, the main exchanger types, how to manage frost and cross-contamination, and what to check when selecting a unit.","nh":"ventilation and indoor air quality hrv versus erv exchanger type rating and standard frost control in cold climate cross contamination and leakage design and installation tip frequently asked question should i choose an hrv or an erv for an office in calgary can heat recovery replace a heating coil key takeaway","nb":"every building that ventilate throw conditioned air away in a canadian winter that exhaust air may be 20 c 68 f or warmer while the outdoor air replacing it is 25 c 13 f or colder heat recovery ventilator hrv and energy recovery ventilator erv capture much of that energy and hand it to the incoming air cutting heating and cooling load and often allowing smaller central plant equipment this guide cover how each device work the main exchanger type frost control rating and the practical point that decide whether a unit perform as promised hrv versus erv the difference is moisture an hrv transfer sensible heat only the two airstream are separated by a solid surface such as aluminium or plastic so moisture stay in its own stream an erv transfer both sensible heat and moisture latent energy it use a hygroscopic wheel coating or a vapour permeable membrane so water vapour move from the more humid stream to the drier one in winter an erv return some indoor moisture to the dry incoming air which can reduce humidification load and dry air complaint in summer it move moisture from humid outdoor air to the exhaust reducing the latent load on the cooling coil an hrv doe neither which is an advantage where indoor moisture must be removed for example in building with high internal moisture gain or where winter condensation on window is a concern exchanger type type transfer typical sensible effectiveness cross leakage common use fixed plate cross flow sensible about 50 to 70 percent very low small and medium unit fixed plate counterflow sensible about 70 to 90 percent very low higher efficiency unit passive house style building membrane plate sensible and latent similar to plate type very low erv where separation matter rotary wheel sensible sensible about 70 to 85 percent low need purge large ahus rotary wheel enthalpy sensible and latent about 70 to 85 percent low need purge large ahus doa heat pipe sensible about 45 to 65 percent none lab hospital wraparound dehumidification ru"},{"k":"Guide","u":"/guides/filtration-merv-ratings-hepa-and-pressure-drop/","t":"Filtration: MERV ratings, HEPA and pressure drop","s":"Learn what MERV ratings and ISO 16890 classes measure, when HEPA filtration is needed, and how to balance filter efficiency against pressure drop, fan energy and maintenance in commercial buildings.","nh":"ventilation and indoor air quality how filter are rated ashrae standard 52 2 and merv iso 16890 hepa and ulpa filter pressure drop clean and final pressure drop face velocity energy impact upgrading filtration in existing system monitoring and maintenance frequently asked question is merv 13 alway better do electrostatic filter keep their rating can portable hepa air cleaner help key takeaway","nb":"air filter protect hvac equipment from dirt and protect occupant from airborne particle a filter that is too coarse let dust coat coil and duct surface and doe little for indoor air quality a filter that is more efficient than the system can handle can choke airflow and raise fan energy choosing well mean understanding how filter are rated what particle size matter and how pressure drop change over a filter life interest in filtration has grown in canada because of wildfire smoke event which can push outdoor fine particle level very high for day and because of attention to airborne infection control how filter are rated ashrae standard 52 2 and merv ashrae standard 52 2 test filter against particle in three size range and assign a minimum efficiency reporting value merv from 1 to 16 the efficiency used is the minimum measured as the filter load with test dust so the rating reflect worst case performance in the test range particle size example of particle e1 0 3 to 1 0 m smoke combustion particle some bacteria virus carrying droplet nuclei e2 1 0 to 3 0 m fine dust mould spore some bacteria e3 3 0 to 10 m pollen larger dust lint typical minimum efficiency for common merv level merv e1 0 3 to 1 m e2 1 to 3 m e3 3 to 10 m typical use 8 not rated low or not rated at least 70 percent minimum for most commercial system prefilter 11 at least 20 percent at least 65 percent at least 85 percent better commercial building 13 at least 50 percent at least 85 percent at least 90 percent office school recommended for smoke and infection control where feasible 14 at least 75 percent at least 90 percent at least 95 percent healthcare final filter laboratory 16 at least 95 percent at least 95 percent at least 95 percent critical application ashrae 62 1 require a minimum filter efficiency merv 8 in recent edition upstream of cooling coil and other wet surface healthcare facility follow csa z317 2 or ashrae 170 which specify higher efficiency and multiple filter bank for many space iso"},{"k":"Guide","u":"/guides/garage-ventilation-and-co-no2-detection/","t":"Garage ventilation and CO/NO2 detection","s":"Learn how parkade ventilation systems work, how gas detection saves energy while protecting occupants, and what to check during design, commissioning and maintenance.","nh":"ventilation and indoor air quality code requirement why no2 matter system configuration ducted supply and exhaust jet fan system natural and hybrid ventilation make up air and heating gas detection and fan control sensor selection and placement energy consideration testing and commissioning frequently asked question can garage fan be turned off overnight do electric vehicle change garage ventilation key takeaway","nb":"enclosed parking garage are found under almost every new condominium office tower and hospital in canadian city vehicle release carbon monoxide co nitrogen dioxide no2 particulate and fuel vapour and in an enclosed space those contaminant can accumulate quickly particularly in cold weather when engine idle longer and run rich during warm up a well designed garage ventilation system keep the air safe while running fan only as hard as needed this guide cover code requirement system configuration gas detection and the testing and maintenance that keep a parkade system reliable code requirement in canada ventilation of enclosed storage garage is governed by part 6 of the national building code of canada and the provincial code based on it in general term the nbc require a mechanical ventilation system that either supply outdoor air continuously during operating hour at a prescribed rate per square metre of floor area 3 9 l s per m2 roughly 0 77 cfm ft2 in recent edition or is controlled by co monitoring so that co concentration is limited to not more than 100 ppm most designer choose the second option because continuous ventilation at the prescribed rate use a great deal of fan and heating energy the code also require garage to be kept at negative pressure relative to adjacent occupied space and require vestibule or other separation between the garage and the rest of the building in many case exhaust discharge location must be kept away from air intake and opening code edition differ in their detail and province and municipality may add requirement for example no2 detection where diesel vehicle are expected or specific alarm requirement alway confirm the adopted edition and any local amendment with the authority having jurisdiction occupational exposure limit for parking attendant and maintenance staff are set by provincial occupational health and safety regulation why no2 matter gasoline vehicle with modern catalytic converter emit much less co than older vehicle so co"},{"k":"Guide","u":"/guides/humidification-in-cold-climates/","t":"Humidification in cold climates","s":"Learn why indoor air gets so dry in Canadian winters, which buildings genuinely need humidification, how steam and adiabatic humidifiers compare, and how to set humidity limits that protect the building envelope.","nh":"ventilation and indoor air quality which building need humidification the envelope limit practical step humidifier type steam humidifier adiabatic humidifier comparison design detail that matter control frequently asked question will humidification reduce static shock why are my window wet when the humidifier run is steam from the main building boiler acceptable for humidification key takeaway","nb":"in a canadian winter outdoor air hold very little moisture air at 20 c 4 f and saturated contain well under 1 gram of water per kilogram of dry air when that air is brought inside and heated to 21 c 70 f its relative humidity can fall to 10 percent or less occupant notice dry skin irritated eye and static shock wood finishe musical instrument artwork and some processe are affected too humidification add moisture back it also add risk moisture that reache cold part of the building envelope can condense causing frost water damage and mould good humidification design in cold climate is as much about limiting humidity as adding it which building need humidification many ordinary commercial building in canada operate without active humidification comfort standard such as ashrae 55 do not set a lower humidity limit for thermal comfort although very dry condition can cause discomfort and static electricity humidification is typically justified for building or space typical reason hospital and healthcare csa z317 2 and ashrae 170 set humidity range for many space such as operating room museum gallery archive protection of collection from dimensional change and cracking laboratory and cleanroom process requirement and static control printing textile and wood product material stability and static control electronic manufacturing electrostatic discharge control data center generally not required for modern it equipment some facility still maintain a minimum dew point office and school optional for comfort must be weighed against envelope risk where humidity is optional a modest winter target is often a reasonable balance where it is required the building envelope must be designed or verified to handle it the envelope limit when warm humid indoor air reache a surface colder than its dew point moisture condense in winter the coldest interior surface are usually window glass window frame thermal bridge at slab edge and steel framing and any place where indoor air leak into the wa"},{"k":"Guide","u":"/guides/indoor-air-quality-testing-and-what-to-measure/","t":"Indoor air quality testing and what to measure","s":"Learn which indoor air quality parameters matter, which Canadian and international guidelines apply, and how to plan an IAQ investigation that produces useful answers.","nh":"ventilation and indoor air quality start with the building not the instrument core parameter temperature and relative humidity carbon dioxide particulate matter carbon monoxide volatile organic compound and formaldehyde radon biological contaminant summary of reference value instrument and method interpreting result key takeaway","nb":"indoor air quality iaq complaint are among the most common call a facility manager receive stuffiness headache odour dry eye dust some complaint trace back to a single obvious cause while other involve ventilation temperature humidity and pollutant source interacting good iaq testing is not about buying the most sensitive instrument it is about measuring the right thing in the right place at the right time and comparing them with sensible reference value this guide set out what to measure what the main canadian guideline say and how to structure an investigation start with the building not the instrument before taking a single reading gather information document the complaint where when who and what symptom complaint that vary with time of day or occupancy point to ventilation complaint tied to a location point to local source review the hvac system design outdoor airflow schedule economizer control filter type and maintenance record walk the building look for water damage blocked diffuser new furnishing or renovation chemical storage printer loading dock near intake and similar source check the bas trend of outdoor air damper position supply air temperature space temperature and co2 often reveal problem faster than spot measurement see trend logging and using bas data only then plan measurement to confirm or rule out likely cause core parameter temperature and relative humidity thermal discomfort is often reported as poor air quality measure dry bulb temperature and relative humidity rh at occupied height and compare with ashrae standard 55 rh below about 20 to 30 percent common in canadian winter contribute to dry eye and static complaint sustained rh above about 60 percent increase the risk of mould and dust mite carbon dioxide co2 is primarily an indicator of ventilation per person not a pollutant at typical indoor level outdoor co2 is currently a little over 400 ppm in a densely occupied room steady state co2 rise as ventilation per person fall ashrae 62 1 doe "},{"k":"Guide","u":"/guides/odour-control-and-exhaust-re-entrainment/","t":"Odour control and exhaust re-entrainment","s":"Learn how exhaust plumes behave around buildings, the separation distances and stack design practices that prevent re-entrainment, and how to diagnose odour complaints in existing buildings.","nh":"ventilation and indoor air quality how air flow around building common source design measure to prevent re entrainment separation distance stack height and exit velocity discharge configuration high plume and induced air fan intake location dispersion modelling and wind tunnel study odour control at the source diagnosing odour complaint key takeaway","nb":"few complaint are as persistent as an unexplained odour that come and goe kitchen smell in the boardroom on certain afternoon diesel fume on the third floor whenever the truck idle a chemical whiff in the lab office only when the wind blow from the west in many of these case exhaust leaving the building is being drawn straight back in through an outdoor air intake a window or an open door this is called re entrainment and it is mostly a problem of geometry and airflow around building this guide explain how exhaust plume behave which design practice prevent re entrainment and how to investigate odour problem in existing building how air flow around building wind striking a building separate at its edge and form zone of disturbed airflow a recirculation cavity on the roof just downwind of the leading edge where air swirl back toward the edge a wake on the downwind side of the building where air is turbulent and can flow back toward the leeward wall rooftop structure such as penthouse screen and parapet each with their own small recirculation zone an exhaust plume released inside one of these zone can be trapped and carried to any intake within the same zone regardless of direction ashrae handbook fundamental chapter on airflow around building provide method for estimating the size of these zone and the dilution of exhaust plume at intake location nearby taller building can also create downwash that bring plume back to roof level common source source typical contaminant note commercial kitchen exhaust grease cooking odour nfpa 96 set clearance from intake laboratory fume hood exhaust chemical vapour ansi assp z9 5 set stack guidance washroom and general exhaust odour lower hazard but frequent complaint boiler generator and appliance flue combustion product co no2 csa b149 1 and manufacturer clearance loading dock and garage vehicle exhaust often at grade near entrance cooling tower drift potential legionella separation from intake is critical sanitary vent and waste ro"},{"k":"Guide","u":"/guides/outdoor-air-intake-placement-and-design/","t":"Outdoor air intake placement and design","s":"Learn where outdoor air intakes should and should not go, how to keep out snow, rain and contaminants, and how to size louvres and plenums for Canadian conditions.","nh":"ventilation and indoor air quality location principle keep away from contaminant source consider prevailing wind and building aerodynamic avoid ground level hazard plan for snow weather protection rain snow ice and hoarfrost louvre and plenum sizing freeze protection and mixing airflow measurement and control security and safety key takeaway","nb":"the outdoor air intake is where a building ventilation begin and every contaminant snowflake or raindrop that enter it end up in the air handler or the occupied space intake are often placed late in design wherever there is room left on the roof or wall and the consequence show up for decade odour complaint wet filter frozen coil and snow packed plenum careful placement and detailing cost little at design and save a great deal in operation this guide cover intake location separation distance weather protection louvre selection and other detail that matter in canadian climate location principle keep away from contaminant source intake should be located away from anything that could contaminate the air ashrae standard 62 1 include a table of minimum separation distance from intake to common source value in recent edition include roughly source approximate minimum distance noxious or dangerous exhaust 10 m 30 ft significantly contaminated exhaust 5 m 15 ft combustion vent chimney and flue 5 m 15 ft garage entry loading area and driveway 1 5 to 7 5 m 5 to 25 ft depending on type cooling tower intake or basin 5 m 15 ft cooling tower exhaust 7 5 m 25 ft garbage storage area 5 m 15 ft heavy traffic street 7 5 m 25 ft these are abbreviated approximate value consult the edition of 62 1 referenced by your project and any provincial or municipal requirement csa b149 1 has separate termination clearance for gas appliance vent and nfpa 96 set distance for kitchen exhaust the distance are minimum wind pattern around building can carry exhaust well beyond them see odour control and exhaust re entrainment consider prevailing wind and building aerodynamic where possible put intake upwind of exhaust relative to prevailing wind on a different face of the building or at a different elevation avoid placing roof intake inside recirculation zone near the downwind side of penthouse and screen where exhaust from nearby stack can collect avoid ground level hazard intake at grade are exposed "},{"k":"Guide","u":"/guides/uv-germicidal-irradiation-in-air-systems/","t":"UV germicidal irradiation in air systems","s":"Learn how ultraviolet germicidal irradiation inactivates microorganisms, where it is effective in HVAC systems, and the design, safety and maintenance issues that decide whether it works.","nh":"ventilation and indoor air quality how uvgi work three application coil and drain pan irradiation in duct air disinfection upper room uvgi comparison design consideration safety maintenance frequently asked question can uv replace filter is uv worthwhile just for coil key takeaway","nb":"ultraviolet germicidal irradiation uvgi use short wavelength ultraviolet light to damage the dna and rna of bacteria viruse and mould spore so they cannot reproduce it has been used in hospital and laboratory for decade and is now common in commercial air handler either to keep cooling coil clean or as part of an airborne infection control strategy like any technology it work well when correctly designed and maintained and poorly when it is not this guide explain how uvgi work the three main way it is applied in hvac and the design safety and maintenance issue owner should understand how uvgi work germicidal uv fall in the uv c band roughly 200 to 280 nm most hvac system use low pressure mercury vapour lamp that emit mainly at 254 nm close to the peak sensitivity of nucleic acid uv c led and filtered krypton chloride lamp emitting at 222 nm often called far uvc are newer alternative inactivation depend on dose the product of irradiance and exposure time usually expressed in j m2 or mj cm2 different organism need different dose many bacteria and enveloped viruse are relatively easy to inactivate while fungal spore and some bacterial spore need much higher dose because dose depend on time a surface exposed continuously receive an enormous dose while air moving past a lamp at several metre per second receive very little three application coil and drain pan irradiation lamp are mounted downstream of a cooling coil to irradiate the coil face and drain pan continuously wet coil surface readily support biofilm which increase air side pressure drop and reduce heat transfer continuous uv exposure limit that growth this is the most common and best established hvac application because the dose accumulate over time and the benefit a cleaner coil is easy to observe it doe not replace coil maintenance but it can reduce cleaning frequency see coil cleaning and its energy impact in duct air disinfection lamp installed in a duct or air handler inactivate organism as air passe becaus"},{"k":"Guide","u":"/guides/ventilation-for-wildfire-smoke-events/","t":"Ventilation for wildfire smoke events","s":"Learn how wildfire smoke enters buildings, how to adjust outdoor air and filtration during smoke events, and how to prepare a building readiness plan before the next fire season.","nh":"ventilation and indoor air quality what is in wildfire smoke how smoke get inside strategy during a smoke event filtration outdoor air pressurization recirculation and fan operation portable air cleaner gas phase filtration summary of event action monitoring preparing a smoke readiness plan key takeaway","nb":"wildfire smoke has become a regular summer concern across much of canada city in british columbia alberta the northwest territory and increasingly ontario and quebec have experienced day or week of heavy smoke the main health concern is fine particulate matter pm2 5 which penetrate deep into the lung building offer real protection but only if their hvac system are prepared to keep smoke out and clean the air that get in this guide cover how smoke enter building practical hvac strategy during a smoke event and how to prepare before the season start what is in wildfire smoke smoke is a mixture of fine and ultrafine particle carbon monoxide nitrogen oxide and many volatile and semi volatile organic compound most of the particle mass is in the fine range well under 2 5 m which is why pm2 5 is the standard indicator filtration addresse particle well gase and odour are harder they pass through particle filter and require activated carbon or similar sorbent media for meaningful removal environment and climate change canada and provincial agency publish the air quality health index aqhi and special air quality statement during smoke event health canada guidance encourage keeping indoor air as clean as possible during smoke event including through filtration and portable air cleaner how smoke get inside outdoor air intake deliver smoke directly into the supply air reduced only by the filter in the air handler infiltration through the envelope door and opening carry unfiltered air in especially if the building run negative filter bypass around poorly sealed rack let smoke skip the filter exhaust driven depressurization for example from kitchen or washroom exhaust without balanced make up air increase infiltration strategy during a smoke event the objective is to reduce indoor pm2 5 while still providing safe ventilation for occupant filtration filtration is the most important tool merv 13 filter capture a large fraction of smoke sized particle and merv 14 to merv 16 do better"},{"k":"Guide","u":"/guides/ashrae-guideline-36-high-performance-sequences/","t":"ASHRAE Guideline 36 high-performance sequences","s":"Learn what ASHRAE Guideline 36 contains, how its standardized sequences save energy and reduce programming errors, and what owners and designers need to do to use it successfully.","nh":"control and building automation background system covered key strategy zone request and trim and respond importance multiplier and rogue zone dual maximum vav reheat logic ventilation calculation economizer and relief control built in fault detection zone group and mode benefit and trade off applying guideline 36 on a project common pitfall key takeaway","nb":"for decade every mechanical engineer wrote their own sequence of operation and every control contractor programmed them differently the result was enormous variation in how similar system behaved and many building that never achieved the efficiency their designer intended ashrae guideline 36 high performance sequence of operation for hvac system was created to change that by providing standardized tested and programmable sequence for common hvac system this guide explain what the guideline cover the key strategy it use and how owner and designer can apply it on canadian project background guideline 36 grew out of ashrae research project rp 1455 which developed advanced control sequence for vav system the first edition was published in 2018 and later edition have expanded the system covered and refined the logic its sequence are written in precise unambiguous language so that they can be implemented consistently and increasingly delivered as pre programmed library by control manufacturer the guideline has two main goal energy performance sequence incorporate best practice such as reset demand based control and optimal start consistency and reliability standard logic reduce design time programming error and commissioning effort and make building easier to operate and maintain system covered recent edition cover a range of common system including multiple zone vav air handler with various economizer and relief configuration single zone vav air handler vav terminal unit cooling only with reheat parallel and sery fan powered and dual duct dual fan dual duct system general zone logic setpoint mode occupancy and window switche plant sequence for chilled water and hot water in newer edition system outside its scope such as laboratory airflow control data center cooling cleanroom and many specialized plant still need project specific sequence check the edition you are referencing for the exact list of covered system key strategy zone request and trim and respond instead of f"},{"k":"Guide","u":"/guides/alarm-management-in-building-automation/","t":"Alarm management in building automation","s":"Learn why most BAS alarm lists are ignored, and how to rationalize, prioritize and maintain alarms so that the important ones get a timely response.","nh":"control and building automation what an alarm should be common cause of alarm flood alarm priority level rationalizing an existing alarm system designing alarm on new project writing good alarm message measuring alarm system performance frequently asked question should every sensor have an alarm who should own the alarm configuration key takeaway","nb":"in many building the alarm screen on the building automation system bas show hundred of active alarm most are old irrelevant or repeating and operator have learned to ignore them the danger is that a genuinely important alarm such as a freezestat trip a failed exhaust fan in a laboratory or a high temperature in a server room get lost in the noise alarm management is the discipline of making sure every alarm mean something and that the right person respond to it in time the process industry have formal standard for this including isa 18 2 and eemua 191 building rarely need that level of formality but the same principle apply and can dramatically improve how a facility run what an alarm should be a useful working definition an alarm is a notification that require an operator to take action within a defined time if no action is needed it is not an alarm it might be an event to log a status message or a maintenance notice but it should not compete for attention with condition that need a response every configured alarm should be able to answer four question what condition doe it indicate what is the consequence if nobody respond what action should the operator take how quickly must that happen if those answer are unclear the alarm need to be redesigned or removed common cause of alarm flood default alarm left enabled controller often ship with alarm on every point which contractor leave in place limit too tight a space temperature alarm at 1 k from setpoint will trigger every time the system recover from setback no delay alarm fire on momentary excursion during start up changeover or sensor noise alarm in unoccupied mode temperature alarm trigger at night when setpoint are intentionally relaxed cascading alarm a single failure such as an ahu fan trip generate dozen of downstream zone temperature and airflow alarm chattering an alarm repeatedly clear and return because there is no deadband stale alarm alarm for equipment removed year ago or fault nobody is going to fix "},{"k":"Guide","u":"/guides/bacnet-basics-for-building-owners/","t":"BACnet basics for building owners","s":"Understand what BACnet is and is not, the terms that appear in controls specifications, and how owners can use the protocol to avoid vendor lock-in and keep building data accessible.","nh":"control and building automation what bacnet is key concept device object service priority array network ip and ms tp bacnet secure connect interoperability document pic device profile and bibb btl listing how owner can use bacnet well bacnet and other protocol key takeaway","nb":"if you own or manage a commercial building you have probably seen bacnet in a control specification or heard a contractor promise that their system is bacnet compatible bacnet is the most widely used open communication protocol in building automation and understanding the basic help owner ask the right question avoid being locked into a single vendor and get full value from their building data this guide explain what bacnet is the key term and how to specify and verify a bacnet system what bacnet is bacnet stand for building automation and control network it is a data communication protocol published as ansi ashrae standard 135 and adopted internationally as iso 16484 5 it define how device from different manufacturer exchange information sensor reading setpoint alarm schedule and trend bacnet is a common language not a product a bacnet controller from one manufacturer can share data with a bacnet front end from another provided both support the same feature it doe not define what a controller doe internally or how a sequence is programmed key concept device every bacnet device such as a controller router or workstation has a unique device instance number on the network duplicate instance number cause communication failure so a site wide numbering plan is important object information inside a device is organized into standard object common type include object type typical use analog input ai temperature pressure airflow sensor reading analog output ao valve or damper command analog value av setpoint calculated value binary input bi fan status filter switch alarm contact binary output bo start and stop command binary value bv mode enable flag multi state value msv occupancy mode system state schedule and calendar occupancy schedule and holiday trend log recorded history of a point notification class alarm routing and priority each object has property such as present value unit status flag and description consistent meaningful object name and description make a system"},{"k":"Guide","u":"/guides/building-automation-system-upgrades-and-migration/","t":"Building automation system upgrades and migration","s":"Learn how to decide when a BAS needs upgrading, the main migration strategies from front-end replacement to full controller replacement, and how to specify and phase the work to avoid downtime and lock-in.","nh":"control and building automation sign that an upgrade is needed assess before you design migration strategy wiring and field device specifying an open serviceable system phasing and cutover commissioning the new system budgeting and procurement using the upgrade to improve performance key takeaway","nb":"building automation system age faster than the mechanical equipment they control a chiller or air handler may run for 25 year or more but controller workstation and software often become unsupported in 10 to 20 year replacement part disappear the original programmer retire the front end run on an obsolete operating system and the building owner is left with a system that work until it doe not a well planned upgrade fixe these problem and create an opportunity to improve sequence energy performance and data access this guide cover how to assess an existing system choose a migration strategy and specify and deliver the work sign that an upgrade is needed the manufacturer has discontinued the controller or software and spare part are scarce the front end workstation run an unsupported operating system or software version only one contractor can service the system because of proprietary tool or licensing operator cannot get useful trend alarm or graphic controller fail frequently or communication is unreliable sequence are outdated and do not include reset setback or demand control required by current energy code the system has known cybersecurity weaknesse and cannot be patched assess before you design a thorough assessment avoid surprise and let the owner budget accurately inventory the system list every controller its model firmware location network and the equipment it serve record the point count by type review sequence compare as built documentation with what is actually programmed undocumented change are common check field device sensor actuator valve and damper may be reusable or may be part of the problem test a representative sample evaluate network document wiring type trunk layout it network connection and remote access interview operator find out what work what doe not and what information they lack identify integration lighting meter fire alarm interface lab control generator chiller with their own control and third party equipment migration strategy strat"},{"k":"Guide","u":"/guides/chilled-water-and-condenser-water-reset-strategies/","t":"Chilled water and condenser water reset strategies","s":"Learn how resetting chilled water and condenser water temperatures improves chiller efficiency, how to balance chiller, pump and tower fan energy, and how to avoid humidity and stability problems.","nh":"control and building automation why lift matter chilled water supply temperature reset how it work reset signal the pumping trade off limit condenser water temperature reset how it work common strategy the tower fan trade off minimum condenser water temperature coordinating plant reset implementation step key takeaway","nb":"a chiller efficiency depend heavily on lift the difference between the refrigerant pressure in the condenser and in the evaporator which follow the difference between condenser water and chilled water temperature raise chilled water temperature or lower condenser water temperature and the compressor has less work to do reset strategy take advantage of this by moving setpoint away from design value whenever load and weather allow this guide cover chilled water supply temperature reset condenser water reset the trade off with pump and cooling tower fan and the limit that protect comfort and equipment why lift matter at design condition a typical water cooled plant might supply chilled water around 6 to 7 c 43 to 45 f and receive condenser water from the tower around 29 to 30 c 84 to 86 f most hour of the year are far from design as a general rule of thumb often quoted by manufacturer each degree celsius reduction in lift improve chiller efficiency by a few percent although the exact value depend on the chiller type and operating point variable speed centrifugal chiller in particular gain substantially from reduced lift at part load chilled water supply temperature reset how it work the chilled water supply temperature chwst setpoint is raised when cooling demand is low and lowered when demand rise warmer chilled water reduce chiller lift and may reduce losse in distribution piping reset signal method description comment outdoor air temperature linear reset between two outdoor temperature simple but blind to actual coil demand return water temperature reset based on chw return temperature or plant load indirect can drift with low delta t valve position or demand request reset until the most open cooling valve is nearly fully open respond to actual demand require network data trim and respond request from air handler drive the setpoint as in ashrae guideline 36 plant sequence robust when combined with importance multiplier the pumping trade off in variable flow system w"},{"k":"Guide","u":"/guides/cybersecurity-for-building-automation-systems/","t":"Cybersecurity for building automation systems","s":"Understand why building automation systems are a cyber risk, and the practical steps owners and contractors can take to secure HVAC controls without breaking them.","nh":"control and building automation why bas network are vulnerable a layered approach 1 inventory 2 network segmentation 3 secure remote access 4 account and password 5 patching and lifecycle 6 monitoring and backup bacnet secure connect responsibility on a project a quick assessment checklist frequently asked question should the bas be on the same network as corporate it is a cloud connected bas less secure key takeaway","nb":"building automation system bas were designed for reliability not security many were installed on isolated network with default password unencrypted protocol and no expectation that anyone outside the mechanical room would ever reach them that has changed today a bas is usually connected to the corporate network a cloud analytic platform a vendor remote support service or all three an insecure bas is a real risk an attacker could change setpoint in a data center or hospital disable equipment or use the bas as a foothold to reach the business network this guide cover the practical measure owner facility manager and contractor can take to reduce that risk without compromising how the hvac system operate why bas network are vulnerable several characteristic make building control an attractive target legacy protocol bacnet ip modbus tcp and lonwork were designed without authentication or encryption any device on the network that speak the protocol can usually read and write point long equipment life controller often stay in service for 15 to 25 year well beyond the period in which their operating system or firmware receive security update default credential supervisory controller and web interface are frequently left with vendor default username and password unmanaged remote access contractor may install modem remote desktop software or port forwarding to make service call easier sometime without the owner knowledge unclear ownership it department may not consider the bas their responsibility and facility team may not have cybersecurity expertise gap between the two are where problem appear a layered approach no single control make a bas secure the goal is defence in depth several independent layer so that the failure of one doe not expose the whole system framework such as the nist cybersecurity framework and the isa iec 62443 sery for industrial automation and control system provide structure and the canadian center for cyber security publishe guidance on operational t"},{"k":"Guide","u":"/guides/fault-detection-and-diagnostics-fdd/","t":"Fault detection and diagnostics (FDD)","s":"Learn how FDD tools turn building automation data into actionable fault reports, what kinds of faults they catch, and how to make an FDD program pay for itself.","nh":"control and building automation what fdd actually doe common approache rule based fdd model based and data driven fdd fault fdd commonly find data requirement setting up an fdd program that get used prioritize fault assign ownership tune before trusting verify fixe fdd and commissioning frequently asked question doe fdd replace the bas alarm system can fdd run on an older bas how much data history is needed to start key takeaway","nb":"most commercial building have hvac fault that nobody know about a stuck outdoor air damper a leaking chilled water valve or a heating coil fighting a cooling coil will rarely trigger a complaint but each one waste energy and shorten equipment life fault detection and diagnostic fdd is the practice of using data the building already collect to find these problem automatically fdd is not a single product it range from a few logic block inside the building automation system bas to cloud analytic platform that pull thousand of point every few minute what they share is a simple idea compare what the system is doing with what it should be doing and flag the difference before it become a failure or a utility bill surprise what fdd actually doe fdd has two part that are often confused fault detection identify that something is wrong for example the supply air temperature of an air handling unit ahu is 3 k above setpoint while the cooling valve is 100 open fault diagnostic identify the likely cause a failed chilled water supply a fouled coil a mis calibrated sensor or a valve actuator that is not stroking detection is relatively easy diagnosis is harder because many fault produce similar symptom good fdd tool narrow the list of probable cause and tell an operator where to look first rather than claiming to know the answer with certainty common approache rule based fdd rule based fdd use expert rule written as logical test on trend data the best known public example is the set of ahu performance assessment rule apar developed at the us national institute of standard and technology and ashrae guideline 36 now include fault detection rule for ahus and terminal unit alongside its standard sequence a typical rule check a condition wait for the system to be stable and only raise a fault if the condition persist rule based method are transparent an engineer can read the rule understand why it triggered and adjust threshold their weakness is that every rule must be written and tuned"},{"k":"Guide","u":"/guides/integrating-hvac-with-lighting-and-access-control/","t":"Integrating HVAC with lighting and access control","s":"Learn how lighting occupancy sensors, card access and room booking systems can drive HVAC setpoints and ventilation, how to integrate them, and where integration must stop for life safety and cybersecurity.","nh":"control and building automation why integrate source of occupancy data integration method bacnet hardwired contact software integration and apis shared sensor designing the integration common problem in practice life safety boundary cybersecurity and privacy key takeaway","nb":"most commercial building already know where people are lighting system have occupancy sensor in nearly every room access control system log every card swipe and room booking system know which meeting room are reserved yet in many building the hvac system run on fixed schedule and ignore all of this information integrating these system let hvac respond to actual occupancy saving energy in empty space while maintaining comfort where people are this guide cover what integration can achieve how system are connected and the limit that must be respected for life safety and security why integrate hvac system traditionally assume every zone is occupied throughout the scheduled day in practice office and meeting room are frequently empty hybrid work has reduced average occupancy and after hour use is unpredictable occupancy information allow setpoint setback in unoccupied zone during the day reduced ventilation in unoccupied zone consistent with ashrae 62 1 occupied standby provision lower vav minimum airflow in unoccupied zone after hour hvac on demand triggered by card access instead of a phone call or timed override pre conditioning of booked meeting room before a meeting start better data for space planning and energy analysis necb 2020 and ashrae 90 1 include requirement for occupancy based control in certain space type and ashrae guideline 36 define occupied standby mode for zone with occupancy sensor see occupancy based hvac control source of occupancy data source what it provide strength limitation lighting occupancy sensor room or zone presence already installed in most room high coverage time delay tuned for lighting false vacancy for still occupant access control building or floor entry by person reliable indicator of arrival doe not show which room tailgating room booking system scheduled use of room allow pre conditioning booking often not used or cancelled co2 sensor ventilation demand indicator directly tied to ventilation lag actual occupancy people counter a"},{"k":"Guide","u":"/guides/occupancy-based-hvac-control/","t":"Occupancy-based HVAC control","s":"Learn how occupancy-based control adjusts ventilation, airflow and setpoints to match how spaces are actually used, and how to design and commission it properly.","nh":"control and building automation level of occupancy control operating mode ventilation in unoccupied zone sensor type passive infrared pir ultrasonic and microwave dual technology other source design and commissioning consideration where saving come from frequently asked question can occupancy control cause comfort complaint doe occupancy control work with older vav system key takeaway","nb":"most commercial hvac system are controlled by a time schedule the building is occupied from 7 00 to 18 00 on weekday and unoccupied the rest of the time within those hour every zone is conditioned and ventilated as if it were full in reality meeting room sit empty for much of the day private office are vacant during meeting and travel and hybrid work has made whole floor unpredictable occupancy based control close that gap by sensing whether a space is actually in use the hvac system can relax temperature setpoint reduce airflow and cut ventilation in empty zone then return to normal operation as soon as someone arrive done well it save fan heating and cooling energy with no noticeable effect on comfort level of occupancy control occupancy based control work at several level and most building use a combination level signal typical action building or system time schedule holiday calendar optimal start start and stop air handler and plant floor or area access control data aggregated sensor enable or disable ahu zone adjust schedule zone occupancy sensor co2 sensor thermostat override occupied standby setpoint reduced airflow and ventilation desk or seat desk sensor booking system mainly used for space planning sometime linked to zone control this guide focuse on zone level control which is where most of the additional saving beyond scheduling come from operating mode ashrae guideline 36 the industry reference for high performance sequence define zone mode that are widely used as a model occupied normal comfort setpoint and full design ventilation occupied standby the building is in its scheduled occupied period but the zone is unoccupied setpoint widen by a small amount airflow minimum can drop and ventilation can be reduced or shut off where the ventilation standard allow unoccupied the building is outside its scheduled hour setpoint set back further and the system run only to maintain setback limit the occupied standby mode is the key to zone level saving a typical "},{"k":"Guide","u":"/guides/pid-control-loops-and-tuning/","t":"PID control loops and tuning","s":"Learn what each term in a PID loop does, how to spot hunting and sluggish loops in BAS trends, and a practical procedure for tuning HVAC control loops in the field.","nh":"control and building automation the feedback loop the three term proportional integral derivative recognizing poorly tuned loop common hvac loop a practical tuning procedure practical feature that help interacting loop key takeaway","nb":"almost every modulating device in a building automation system from chilled water valve and vav damper to fan drive and humidifier is driven by a feedback control loop most of those loop use some form of pid proportional integral derivative control when loop are well tuned the building quietly hold its setpoint when they are not valve and damper hunt back and forth actuator wear out energy is wasted and occupant complain this guide explain how pid control work in practical term how to recognize problem loop and how to tune them in the field the feedback loop a feedback loop has four part process variable the measured value such as supply air temperature setpoint the desired value error the difference between setpoint and process variable output the command sent to the controlled device usually 0 to 100 percent the controller calculate the output from the error send it to the device and watche how the process variable respond the challenge is that hvac processe have delay a valve open water travel to the coil the coil change temperature and the air carry that change to the sensor a controller that react too aggressively overshoot one that react too gently never catche up the three term proportional the proportional term produce an output in proportion to the current error larger error larger correction it is defined by a gain or in many hvac controller a proportional band the range of error over which the output move from 0 to 100 percent a narrow band high gain respond strongly a wide band low gain respond gently proportional only control leave a steady offset from setpoint because some error is alway needed to produce a non zero output integral the integral term add up error over time and keep adjusting the output until the error is eliminated it remove the offset left by proportional control integral action is defined by an integral gain or an integral time reset time too much integral action cause slow oscillation and overshoot too little leave the loop slow to s"},{"k":"Guide","u":"/guides/sensor-selection-location-and-calibration/","t":"Sensor selection, location and calibration","s":"Learn which sensor types suit common HVAC measurements, typical accuracy ranges, where to install them for representative readings, and how to build a practical calibration program.","nh":"control and building automation why sensor accuracy matter typical sensor type and accuracy location getting a representative reading space temperature and humidity duct temperature outdoor air temperature and humidity static pressure co2 water temperature and flow calibration and verification common problem found in the field key takeaway","nb":"a building automation system can only be as good as the information it receive a supply air temperature sensor that read 1 5 c low a co2 sensor that has drifted 200 ppm or an outdoor air temperature sensor in direct sun will quietly cause wasted energy poor comfort and misleading data for year sensor are among the least expensive component in an hvac system yet they decide whether sophisticated sequence such as reset and demand controlled ventilation work at all this guide cover sensor type typical accuracy installation location and calibration practice for the most common hvac measurement why sensor accuracy matter small error compound some example an economizer comparing outdoor and return temperature can lock out free cooling or bring in hot humid air if either sensor is off by a degree or two a chilled water delta t calculated from two sensor each accurate to 0 5 c can be wrong by up to 1 c a large fraction of a 5 or 6 c design delta t a drifted co2 sensor in a demand controlled ventilation system either over ventilate wasting energy or under ventilate harming air quality static pressure reset depend on accurate vav airflow reading at low flow where velocity pressure signal are very small accuracy requirement depend on the purpose sensor used for control energy calculation or fault detection generally need better accuracy than those used only for monitoring typical sensor type and accuracy measurement common technology typical accuracy range for commercial hvac air and water temperature thermistor rtd about 0 2 to 0 5 c 0 4 to 0 9 f relative humidity capacitive polymer about 2 to 5 percent rh co2 non dispersive infrared ndir about 30 to 75 ppm plus a percentage of reading duct and building static pressure capacitive or piezoresistive transducer about 0 25 to 1 percent of full scale airflow pitot array thermal dispersion vav flow cross about 2 to 10 percent poorer at low velocity water flow magnetic ultrasonic insertion turbine about 0 5 to 2 percent of reading f"},{"k":"Guide","u":"/guides/static-pressure-reset-with-trim-and-respond/","t":"Static pressure reset with trim and respond","s":"Learn why fixed duct static pressure setpoints waste fan energy, how trim and respond reset works step by step, and how to set parameters, handle rogue zones and verify performance.","nh":"control and building automation why reset save so much energy how trim and respond work typical parameter how zone request are generated rogue zone commissioning and verification common problem key takeaway","nb":"in a vav system the supply fan modulate to hold a duct static pressure setpoint and each vav box throttle its damper to deliver the airflow its zone need the traditional approach use a fixed setpoint chosen to satisfy the worst case zone at full load at part load which is most of the time that fixed setpoint is far higher than necessary fan work harder than they need to vav damper throttle almost closed and noise increase static pressure reset lower the setpoint until at least one zone damper is nearly wide open trim and respond is the most widely used method for doing this and it is the approach specified in ashrae guideline 36 why reset save so much energy fan power vary roughly with the cube of airflow in an ideal system but in a vav system controlled to fixed static pressure the saving at part load are much smaller than the fan law suggest because the fan must hold pressure even at low flow resetting static pressure let the fan follow a lower system curve capturing much more of the theoretical saving see fan law and how to apply them saving depend on the system but static pressure reset is widely regarded as one of the most cost effective control upgrade for existing vav system necb and ashrae 90 1 require static pressure reset based on zone damper position for many vav system with ddc zone control confirm the requirement of the edition that apply other benefit include quieter operation since damper are less throttled and there is less duct borne noise and reduced duct leakage because leakage rise with static pressure how trim and respond work the logic operate on a regular time step start when the fan start the setpoint begin at an initial value and is held for a set delay while the system stabilize count request each vav zone generate pressure request when its damper is nearly fully open and it still need more airflow the controller add up request from all zone weighted by importance multiplier ignore a few a set number of request is ignored so one or two zone"},{"k":"Guide","u":"/guides/supply-air-temperature-reset-strategies/","t":"Supply air temperature reset strategies","s":"Learn why supply air temperature reset saves energy, how outdoor air, zone demand and trim and respond resets work, and what limits such as humidity and fan capacity apply.","nh":"control and building automation why reset save energy reheat reduction more economizer hour chiller efficiency the fan energy trade off reset strategy outdoor air temperature reset return air or space temperature reset zone demand reset trim and respond comparison limit and safeguard humidity fan and terminal capacity heating mode and minimum special space implementation step verifying performance key takeaway","nb":"many air handler deliver supply air at a fixed 13 c 55 f all year that temperature make sense on a hot humid design day but for much of the year in canada it mean cooling air more than necessary and then reheating it at the zone or running chiller when outdoor air could do the job supply air temperature sat reset raise the setpoint when load are low reducing reheat extending economizer hour and saving cooling energy this guide explain the main reset strategy the energy trade off and the limit that keep reset from causing comfort or humidity problem why reset save energy reheat reduction in vav system with reheat interior and perimeter zone at minimum airflow often need heat even when the air handler is cooling each degree of warmer supply air reduce reheat constant volume reheat system benefit even more since every zone receive full airflow all the time see constant volume vs variable air volume system more economizer hour a higher sat setpoint mean the economizer can meet the full cooling load at higher outdoor temperature delaying mechanical cooling chiller efficiency warmer supply air may allow warmer chilled water improving chiller efficiency the fan energy trade off in vav system warmer supply air mean more airflow is needed to meet the same cooling load which increase fan energy fan power rise steeply with airflow so aggressive reset during warm weather can cost more in fan energy than it save in cooling good reset strategy account for this usually by resetting most when load are low and outdoor air is cool and holding a low sat when it is warm energy code reflect this necb and ashrae 90 1 require supply air temperature reset for many multiple zone system with exception in certain case confirm the requirement of the edition adopted in your province reset strategy outdoor air temperature reset the simplest strategy reset sat linearly between two outdoor temperature point for example at outdoor temperature above 21 c 70 f sat is 13 c 55 f below 15 c 60 f sat ris"},{"k":"Guide","u":"/guides/trend-logging-and-using-bas-data/","t":"Trend logging and using BAS data","s":"A practical guide to configuring BAS trend logs and turning the data into answers about comfort complaints, energy waste and equipment performance.","nh":"control and building automation what a trend log is interval versus change of value choosing an interval which point to trend air handling unit zone and terminal central plant storage and data quality turning trend data into answer pattern worth recognizing trend data for energy project frequently asked question how many point can a bas trend should trend data be sent to the cloud key takeaway","nb":"a building automation system bas see almost everything that happen in a building hvac system temperature pressure valve and damper position fan speed run status and alarm yet in many building that information disappear the moment it is displayed on a graphic trend logging is what turn a bas from a remote control panel into a diagnostic and energy management tool good trend data answer question that are otherwise expensive to settle why one office is alway cold whether the economizer work when the chiller really need to start and whether a retrofit delivered the saving promised this guide cover how to set trend up properly and how to read them what a trend log is a trend log record the value of a bas point over time each record has a timestamp and a value and sometime a status flag trend can be stored in the field controller in a supervisory controller or server or exported to an external database or analytic platform in bacnet system the trend log object is the standard way to collect this data it can record value on a fixed interval or on change of value cov and the stored record can be read by any bacnet client that support the object older or proprietary system use their own method but the principle are the same interval versus change of value method how it work best for watch out for fixed interval record a sample every set period such as 5 minute temperature pressure flow analysis and fdd too long an interval misse cycling and short event change of value record only when the value change by more than a set increment binary point status alarm slowly changing value poorly set increment can flood storage or miss small but important change for most analysis work fixed interval are easier to use because every point line up in time a common approach is to trend analog point at 1 to 15 minute interval and binary point on cov choosing an interval 1 minute or less control loop tuning short cycling hunting valve and damper 5 minute general diagnostic and most fault detec"},{"k":"Guide","u":"/guides/writing-clear-sequences-of-operation/","t":"Writing clear sequences of operation","s":"Learn how to structure a sequence of operation, what every sequence must define, and how clear, testable language reduces programming errors, commissioning issues and energy waste.","nh":"control and building automation why sequence matter structure of a good sequence what every control loop must define writing clear language use consistent defined term be specific about condition and timing describe the sequence of device avoid control by description of hardware avoid contradictory requirement use standard sequence where you can common mistake making sequence testable key takeaway","nb":"the sequence of operation is the instruction set for an hvac system it tell the control contractor what the system should do in every mode it tell the commissioning agent what to test and it tell the operator how the building is supposed to behave year later yet sequence are often the weakest part of a mechanical design package vague phrase like control to maintain setpoint or provide economizer operation leave every important decision to the programmer and the result is a building that work differently from what the designer intended this guide explain how to structure a sequence what it must contain and how to write language that is clear enough to program and test why sequence matter a large share of the deficiency found during commissioning and retro commissioning trace back to control loop fighting each other simultaneous heating and cooling economizer that never open reset that were never programmed many of these come from ambiguous sequence rather than poor programming when a sequence is clear the programmer has less to interpret the commissioning agent has a script to test against and argument about intent disappear energy code also depend on sequence necb and ashrae 90 1 require feature such as setpoint deadband setback economizer control supply air temperature reset and static pressure reset if the sequence doe not specify them clearly they may not be delivered structure of a good sequence organize sequence by system then by mode and function a typical structure for an air handler system description what the system serve its major component and a reference to the point list and control schematic operating mode occupied unoccupied warm up cool down setback economizer smoke control fire alarm shutdown and any special mode such as wildfire smoke mode start and stop schedule optimal start interlock and proving control loop each controlled variable its sensor its setpoint the device that control it and the reset logic safety and interlock freezestat high and lo"},{"k":"Guide","u":"/guides/air-balancing-procedures-and-instruments/","t":"Air balancing procedures and instruments","s":"Learn the instruments used to measure airflow and pressure, and the step-by-step procedure for balancing constant volume and VAV air systems.","nh":"testing balancing and commissioning instrument measuring airflow in duct the balancing procedure 1 preparation 2 fan total airflow 3 branch and outlet balancing 4 vav terminal unit 5 outdoor air and pressurization 6 final check and marking common problem found during air balancing frequently asked question can balancing be done with a capture hood only why balance at maximum airflow on vav system key takeaway","nb":"air balancing sound simple measure the air at each outlet and adjust damper until the number match the drawing in practice it require the right instrument a systematic procedure and an understanding of how change at one outlet affect every other outlet on the same system a disciplined approach get the job done in fewer passe with less throttling and lower fan energy this guide describe the instrument used for commercial air balancing and the procedure typically followed based on ashrae standard 111 and the procedural standard of the tab certification body instrument instrument what it measure typical use digital micromanometer static velocity and differential pressure pitot traverse duct static pressure room pressure pitot static tube total and static pressure in a duct main duct and fan airflow traverse capture hood flow hood airflow at a diffuser or grille terminal outlet airflow reading thermal anemometer air velocity at a point low velocity measurement fume hood face small duct rotating vane anemometer average velocity across a face coil face large grille louver tachometer fan and motor speed fan law calculation drive adjustment clamp on power meter motor current voltage and power confirming motor load and checking against nameplate thermometer and psychrometer dry bulb and wet bulb temperature mixed air calculation coil performance all instrument should have current calibration record and the instrument list with calibration date belong in the tab report capture hood in particular must be used correctly the hood should fully cover the outlet and the reading may need a correction factor for diffuser type and back pressure as described by the manufacturer measuring airflow in duct the most accurate way to measure total airflow in a duct is a pitot tube traverse the technician drill test hole in a straight section of duct and measure velocity pressure at a grid of point across the cross section traverse are most accurate in straight duct run ideally several duct d"},{"k":"Guide","u":"/guides/commissioning-for-leed-and-green-building-programs/","t":"Commissioning for LEED and green building programs","s":"Learn what LEED and other Canadian green building programs require for commissioning, how to plan for the credits, and how to get real performance from the process.","nh":"testing balancing and commissioning leed in canada fundamental commissioning and verification prerequisite enhanced commissioning credit planning for the credit other program used in canada cagbc zero carbon building standard boma best leed for existing building energy code and step code getting real value not just point frequently asked question can the design engineer act as the cxa doe leed commissioning satisfy health care commissioning requirement key takeaway","nb":"green building certification program reward efficient design but design intent only become reality if system are built and operated as intended that is why commissioning sit at the center of most program in leed commissioning is a prerequisite that every certified project must meet and additional point are available for more thorough commissioning for owner and design team in canada understanding these requirement early avoid two common problem hiring a commissioning provider too late to meet the requirement and treating commissioning as a documentation exercise rather than a way to get a building that perform this guide cover leed commissioning requirement and how commissioning fit other program used in canada leed in canada leed is administered in canada by the canada green building council cagbc with certification delivered through the green business certification inc gbci many active canadian project are registered under leed v4 or v4 1 and leed v5 has been introduced as the newest version requirement differ between version and rating system so the project team should alway work from the reference guide for the exact version under which the project is registered the description below reflect the general structure of the v4 and v4 1 building design and construction bd c requirement fundamental commissioning and verification prerequisite every leed bd c project must satisfy the fundamental commissioning prerequisite its main element include a commissioning authority cxa with documented experience on similar project engaged early enough to review the owner project requirement and basis of design for larger project the cxa must not be part of the design or construction team although they may be an owner employee an independent consultant or a disinterested subcontractor of the design team depending on the version owner project requirement opr developed by the owner and basis of design bod developed by the design team both reviewed by the cxa see owner project requir"},{"k":"Guide","u":"/guides/commissioning-process-from-opr-to-turnover/","t":"Commissioning process: from OPR to turnover","s":"Learn what happens in each phase of new building commissioning, who does what, and which deliverables an owner should expect from the commissioning provider.","nh":"testing balancing and commissioning who is involved phase 1 pre design phase 2 design phase 3 construction submittal review construction checklist start up and tab issue log phase 4 acceptance and testing phase 5 turnover phase 6 occupancy and operation key deliverable at a glance common pitfall frequently asked question is commissioning required by code in canada how much doe commissioning cost key takeaway","nb":"commissioning is a quality process that verify a building system are designed installed tested and capable of being operated and maintained to meet the owner requirement it is not a single test at the end of construction effective commissioning start during pre design continue through design and construction and extend into the first year of occupancy in north america the process is defined by ashrae standard 202 and ashrae guideline 0 with technical guidance for hvac system in ashrae guideline 1 1 in canada csa z320 cover building commissioning and health care project follow csa z8000 and the commissioning requirement referenced in csa z317 2 green building program such as leed make commissioning a prerequisite this guide walk through each phase who is involved owner define requirement approve key document and accept the building commissioning provider cxp or commissioning authority cxa lead the process write the commissioning plan review document witnesse test and report issue ideally independent of the design and construction team design team document the basis of design and respond to review comment contractor complete checklist start up equipment perform test and correct deficiency operation staff participate in testing and training so they understand the system they will run phase 1 pre design the most important document of the commissioning process is created here the owner project requirement opr it describe what the owner need from the building in functional term occupancy comfort criteria energy and carbon goal reliability maintainability budget constraint and operator capability the cxp also prepare the initial commissioning plan defining scope role schedule and the system to be commissioned see owner project requirement and basis of design for how to write a useful opr phase 2 design during design the engineer document the basis of design bod explaining how the design meet the opr system choice design condition code and standard and assumption the cxp re"},{"k":"Guide","u":"/guides/common-deficiencies-found-during-commissioning/","t":"Common deficiencies found during commissioning","s":"A practical list of the problems commissioning providers find again and again, grouped by system, with the root causes and the steps that prevent them.","nh":"testing balancing and commissioning design stage deficiency installation deficiency air system hydronic system control programming and sequence deficiency testing and balancing deficiency documentation and turnover deficiency why these deficiency keep happening how to prevent them frequently asked question are deficiency a sign of a bad contractor who pay to fix deficiency key takeaway","nb":"every commissioning project produce an issue log and after enough project the same entry keep appearing a sensor installed in the wrong place a damper actuator wired backward a sequence that cannot work as written a pump that was never balanced none of these are exotic they are the predictable result of complex system being designed built and programmed by many people under schedule pressure knowing which deficiency are most common help everyone designer can address them on the drawing contractor can check for them before inviting the commissioning provider to witness test and owner can understand why commissioning time and budget are well spent this guide group typical finding by category and explain how to prevent them design stage deficiency many problem found in the field were built into the design document commissioning design review aim to catch them early incomplete or ambiguous sequence of operation sequence that omit mode such as warm up failure response or alarm handling leave programmer to guess see writing clear sequence of operation missing access valve damper actuator filter and coil located above hard ceiling or behind other equipment without access panel no provision for measurement missing test port flow measuring station or balancing valve needed for tab and verification mismatch with the opr design condition redundancy or operating hour that differ from what the owner requested point list doe not support the sequence a sequence call for a reset based on valve position or airflow but the necessary point are not included equipment selection without turndown boiler chiller or fan that cannot operate stably at the low load that occur most of the year installation deficiency air system fire smoke and volume damper left closed after construction ductwork leakage at joint access door and connection flexible duct that is too long kinked or crushed filter missing installed with bypass gap or in the wrong direction fan rotating in reverse or with incorrect "},{"k":"Guide","u":"/guides/duct-leakage-testing-procedures/","t":"Duct leakage testing procedures","s":"Learn how ductwork is pressure tested for leakage, how allowable leakage is calculated from SMACNA leakage classes, and how to plan testing so it does not delay construction.","nh":"testing balancing and commissioning standard and requirement leakage class and allowable leakage worked example test apparatus step by step procedure planning testing on a construction project why leakage matter for energy and performance frequently asked question is all ductwork tested can existing ductwork be tested key takeaway","nb":"leaky ductwork waste energy twice the fan must move extra air to make up for what escape and the conditioned air that leak into ceiling space shaft or unconditioned area is lost severe leakage can also prevent outlet from reaching design airflow undermine pressurization in critical space and pull contaminated air into return system duct leakage testing measure how much air a section of ductwork leak at a known pressure and compare it with an allowable value it is commonly specified for medium and high pressure supply ductwork exhaust system in laboratory and health care facility and any project with demanding energy target this guide describe how commercial duct leakage test are performed and how result are evaluated standard and requirement the main reference in north america is the smacna hvac air duct leakage test manual which define leakage classe test method and apparatus related smacna construction standard define duct pressure classe and seal classe see duct sealing classe and smacna leakage standard for background on how sealing relate to leakage ashrae standard 90 1 require leakage testing of a representative portion of ductwork designed for static pressure above 750 pa 3 in wg with a maximum leakage class of 4 in canada the necb include duct sealing requirement based on duct pressure and leakage testing requirement are commonly set by the project specification owner standard or green building program health care project following csa z317 2 and laboratory project often have stricter requirement check the governing document for each project leakage class and allowable leakage smacna expresse leakage using a leakage class cl which relate the leakage rate per unit of duct surface area to the test pressure in imperial unit cl f p 0 65 where f is leakage in cfm per 100 ft of duct surface and p is test pressure in inche of water smacna also publishe metric equivalent with leakage in l s per m of duct surface and pressure in pascal the metric cl value are numeric"},{"k":"Guide","u":"/guides/functional-performance-testing/","t":"Functional performance testing","s":"Learn what functional performance testing covers, how test scripts are prepared and executed, and how to get reliable results without delaying turnover.","nh":"testing balancing and commissioning what fpt verify prerequisite writing test procedure structure of a test procedure testing method manual testing with override trend based testing sampling running test efficiently when a test fail seasonal limitation frequently asked question who perform functional test how is fpt different from tab key takeaway","nb":"an hvac system can be correctly installed started up and balanced and still fail to perform the economizer may never open the boiler may not stage the backup pump may not start when the lead pump fail or the system may behave correctly in normal operation and fall apart in a power failure functional performance testing fpt is the part of commissioning that find these problem by putting system through their full range of operating mode and verifying that they respond as designed fpt is where the sequence of operation meet reality this guide explain what is tested how test procedure are developed and run and how to avoid the common trap that make testing slow or unreliable what fpt verify functional testing check that equipment control and system operate together according to the owner project requirement the basis of design and the sequence of operation a thorough test cover start up and shutdown sequence including time delay and interlock normal operation across occupied unoccupied warm up and cool down mode part load operation such as staging of chiller boiler and fan and reset strategy setpoint control and stability of control loop safety and interlock freezestat high static pressure limit smoke detector shutdown and flow switche alarm generation priority routing and clearing failure mode lead and standby changeover response to sensor failure loss of communication power failure and restoration behaviour on emergency power and orderly restart integration with other system such as fire alarm lighting access control and generator prerequisite fpt should not begin until system are ready starting early waste everyone time before testing confirm that construction checklist are complete and issue from them are resolved equipment start up is complete and documented by the manufacturer or contractor testing adjusting and balancing is complete or at least sufficiently advanced for the system being tested control point to point checkout is complete every sensor read correctl"},{"k":"Guide","u":"/guides/hydronic-balancing-methods/","t":"Hydronic balancing methods","s":"Learn how heating and chilled water systems are balanced, the strengths of each balancing method, and how valve choices such as PICVs change the process.","nh":"testing balancing and commissioning why hydronic balance matter flow measuring device balancing method proportional method compensated method preset method automatic flow limiting and pressure independent valve a typical hydronic balancing procedure variable flow system glycol and temperature correction frequently asked question doe a system with picv need balancing what tolerance is typical for water flow key takeaway","nb":"water follow the path of least resistance in an unbalanced heating or chilled water system coil close to the pump receive more flow than they need while coil at the far end of the loop are starved occupant near the end of the system complain operator raise pump speed or supply temperature to compensate and the whole plant run less efficiently than it should hydronic balancing distribute flow so that each coil terminal unit and branch receive its design flow at design condition this guide explain the main method the device used and how modern valve technology affect the work why hydronic balance matter comfort starved terminal unit cannot meet their load pump energy overflowing circuit force pump to deliver more total flow and head than necessary plant efficiency overflow through coil lower the return water temperature difference a problem known as low delta t syndrome which reduce chiller capacity and stop condensing boiler from condensing controllability control valve on overflowing circuit operate near closed where control is poor flow measuring device device how flow is determined note calibrated balancing valve circuit setter differential pressure across the valve at a known setting using the manufacturer flow coefficient common on branche and coil accuracy depend on straight pipe and correct setting venturi or orifice flow element differential pressure across a fixed restriction good accuracy usually paired with a separate balancing valve ultrasonic clamp on meter transit time measurement through the pipe wall non intrusive useful for verification and main need straight pipe and correct pipe data pump curve method pump differential pressure and impeller diameter or speed read against the published curve approximate used when no other device is available coil pressure drop measured coil pressure drop compared with the rated value approximate useful for checking terminal unit without valve the tab technician use a differential pressure meter often a digital hydro"},{"k":"Guide","u":"/guides/integrated-systems-testing-and-can-ulc-s1001/","t":"Integrated systems testing and CAN/ULC-S1001","s":"Learn how integrated testing verifies that fire protection, life safety and HVAC systems work together, the role of the integrated testing coordinator, and how to prepare.","nh":"testing balancing and commissioning why integrated testing exist code status system typically included key role integrated testing coordinator other participant the integrated testing process what hvac designer and contractor should prepare common deficiency frequently asked question doe integrated testing replace individual system testing is integrated testing required in existing building key takeaway","nb":"a modern building fire protection depend on many system working together when a smoke detector activate the fire alarm system may need to shut down air handler close smoke damper start stairwell pressurization fan recall elevator release door hold open device unlock egress door and transfer load to emergency power each system can pass its own acceptance test and the building can still fail in a real fire if one interconnection is wired wrong or one sequence is out of order integrated system testing verify those interconnection in canada the governing standard is can ulc s1001 integrated system testing of fire protection and life safety system this guide explain what the standard cover how testing is organized and what hvac designer and contractor need to prepare why integrated testing exist traditionally each trade tested its own system the fire alarm contractor verified the fire alarm to can ulc s537 the sprinkler contractor tested the sprinkler the mechanical contractor tested fan and damper nobody was responsible for confirming that the fire alarm actually shut down the right fan or opened the right damper in the right sequence problem at these interface were often found only during an inspection or not at all can ulc s1001 fill that gap by requiring a coordinated test of all interconnected fire protection and life safety system led by a single responsible person against a documented plan code status the national building code of canada and national fire code of canada beginning with their 2015 edition reference can ulc s1001 for integrated testing of fire protection and life safety system each province and territory adopt the national code on its own schedule and sometime with modification and some municipality have their own requirement the authority having jurisdiction determine when integrated testing is required which edition of the standard apply and what documentation must be submitted see national building code of canada hvac requirement for broader code "},{"k":"Guide","u":"/guides/ongoing-and-monitoring-based-commissioning/","t":"Ongoing and monitoring-based commissioning","s":"Understand the difference between ongoing commissioning and monitoring-based commissioning, what they require, and how to run a program that keeps savings in place.","nh":"testing balancing and commissioning definition building block of an mbcx program metering bas trend data analytic and fdd energy baseline people and process a typical program cycle what ongoing commissioning catche ongoing commissioning in new building getting started in an existing building challenge frequently asked question is mbcx only for large building how is ongoing commissioning different from preventive maintenance key takeaway","nb":"commissioning and retro commissioning bring a building system to a well tuned state then time take over sensor drift actuator fail schedule get extended override are left in place and new tenant change how space are used without continuing attention performance gradually slide back toward where it started ongoing commissioning ocx and monitoring based commissioning mbcx are approache for preventing that decline instead of treating commissioning as a project with an end date they make it a continuous part of operation using the data the building already produce to catch problem early definition the term are used loosely in the industry but a practical distinction is ongoing commissioning is a continuing process of verifying and optimizing building performance through periodic review testing and corrective action it can be done with relatively simple tool such as scheduled trend review and recurring functional check monitoring based commissioning is a form of ongoing commissioning that rely on permanent monitoring energy meter bas trend data and analytic software often including automated fault detection and diagnostic fdd the emphasis is on continuous data analysis rather than periodic site visit both share the same goal detect when performance deviate from intent and fix it quickly ashrae guideline 0 2 covering commissioning of existing system and the commissioning process described in ashrae standard 202 both recognize this continuing phase building block of an mbcx program metering whole building electricity and gas meter provide the top level view ideally at 15 minute or hourly interval submetering of major end use such as chiller boiler air handler lighting and plug load make it much easier to locate problem thermal energy meter on heating and chilled water loop are valuable in larger building and in those connected to district energy bas trend data trend of temperature setpoint valve and damper position fan and pump speed and equipment status form the core data"},{"k":"Guide","u":"/guides/owner-s-project-requirements-and-basis-of-design/","t":"Owner's project requirements and basis of design","s":"Learn how to write a useful OPR, what a good BOD explains, and how the two documents work together to define and verify project success.","nh":"testing balancing and commissioning the owner project requirement what an opr should include make requirement measurable keep it current the basis of design what a bod should include how the opr and bod work together using the opr and bod during construction and testing common mistake frequently asked question is an opr needed for small project who sign off on the bod key takeaway","nb":"every building project start with expectation comfortable space reasonable energy cost reliable equipment easy maintenance the problem is that these expectation often live only in the owner head or in scattered meeting note when they are never written down clearly designer make assumption contractor value engineer the wrong thing and nobody can say at turnover whether the building actually deliver what was wanted the owner project requirement opr and the basis of design bod solve this the opr record what the owner need the bod explain how the design will deliver it together they are the foundation of the commissioning process and the yardstick against which design review functional test and acceptance are measured the owner project requirement the opr is a written document describing the functional requirement of the project and the expectation of how the building will be used and operated ashrae standard 202 and ashrae guideline 0 describe it as the key document of the commissioning process and leed make its preparation part of the fundamental commissioning prerequisite the opr belong to the owner the commissioning provider often facilitate workshop and draft the document but the owner staff including facility management and operation should shape and approve it what an opr should include topic example of content project background purpose of the building occupant hour expected life space use occupancy type density schedule special space such as lab or server room indoor environment temperature and humidity range ventilation acoustic lighting level energy and carbon energy target carbon goal certification sought metering expectation reliability redundancy for critical system acceptable downtime emergency power operation and maintenance staff skill preferred equipment type access spare part bas platform code and standard owner standard beyond code minimum such as health care or institutional standard budget and schedule constraint that affect system choice training "},{"k":"Guide","u":"/guides/reading-a-tab-report/","t":"Reading a TAB report","s":"A section-by-section guide to TAB reports for owners, engineers and facility managers, with the warning signs that a report needs a closer look.","nh":"testing balancing and commissioning typical report structure reading the equipment sheet fan and air handling unit sheet pump sheet terminal unit sheet reading the outlet and hydronic sheet red flag verifying the report using the report after turnover frequently asked question should the owner receive the tab report directly what if the report show system that could not be balanced key takeaway","nb":"the testing adjusting and balancing tab report is often the most detailed record of how a building hvac system actually performed at turnover it list the airflow at every diffuser the water flow through every coil and the speed pressure and power of every fan and pump yet many tab report are filed away unread and problem hidden in them surface only year later as comfort complaint or high energy bill reading a tab report is not difficult once you know how it is organized and what to look for this guide explain the typical structure the meaning of the key data and the red flag that should prompt question before the report is accepted typical report structure most report follow a format set by the certifying body aabc nebb or tabb and the project specification common section include cover and certification page project name tab agency date and the signature and certification number of the responsible individual table of content and system index summary and deficiency list item that could not be balanced to design with explanation instrument list each instrument used with serial number and calibration date equipment test sheet air handler rooftop unit exhaust fan pump chiller boiler and heat exchanger terminal unit sheet vav boxe fan coil heat pump and similar device outlet sheet airflow at each diffuser grille and register hydronic sheet flow at each balancing valve coil or branch traverse sheet pitot traverse data for main duct schematic drawing or marked up floor plan showing outlet and device identification reading the equipment sheet fan and air handling unit sheet a fan sheet usually show design and actual value side by side item what to check total airflow within the specified tolerance of design commonly 5 to 10 outdoor air airflow at or above design minimum check both minimum and economizer condition if reported fan speed recorded in rpm and vfd frequency or percentage where applicable external and total static pressure compare with the submitted fan selection "},{"k":"Guide","u":"/guides/retro-commissioning-existing-buildings/","t":"Retro-commissioning existing buildings","s":"Learn what retro-commissioning involves, which problems it usually uncovers, and how to plan a project that delivers lasting comfort and energy improvements.","nh":"testing balancing and commissioning what make retro commissioning different the retro commissioning process 1 planning 2 investigation 3 analysis and reporting 4 implementation 5 verification and hand off typical finding cost saving and incentive keeping the benefit frequently asked question how long doe retro commissioning take doe retro commissioning require new equipment key takeaway","nb":"most existing building do not run the way they were designed to and many were never fully commissioned in the first place over the year schedule are extended for one tenant and never reset sensor drift damper seize setpoint are overridden to silence complaint and sequence are modified by successive contractor the result is a building that use more energy than it should and still generate comfort complaint retro commissioning rcx is a systematic process for finding and correcting these problem in a building that was not previously commissioned when the building was commissioned originally the same process is often called re commissioning either way the focus is on making existing system work properly through operational change repair and control adjustment rather than replacing equipment what make retro commissioning different aspect new construction commissioning retro commissioning starting point owner project requirement and new design current facility requirement and existing system main focus verifying installation and design intent optimizing operation of system already in place typical measure correcting installation deficiency schedule setpoint sequence and maintenance correction documentation design document available document often incomplete or outdated data limited until occupancy year of utility data and bas trend available ashrae guideline 0 2 addresse the commissioning process for existing system and assembly and is a useful reference for structuring the work the retro commissioning process 1 planning the project begin by defining goal energy saving comfort equipment life preparing for a certification or meeting a building performance requirement the team gather utility bill drawing previous tab and commissioning report maintenance record and occupant complaint log and develop the current facility requirement which describe how the building is used today and the condition it must maintain utility data analysis at this stage such as comparing energy use"},{"k":"Guide","u":"/guides/seasonal-testing-and-deferred-commissioning/","t":"Seasonal testing and deferred commissioning","s":"Learn which HVAC functions cannot be fully tested at turnover, how to plan seasonal testing, and how to make sure deferred tests actually happen.","nh":"testing balancing and commissioning why simulation is not alway enough what to test in each season planning seasonal testing in the commissioning plan in the contract document in the schedule running seasonal test other reason for deferral making sure deferred test happen frequently asked question can seasonal testing be skipped if override were tested who pay for seasonal testing key takeaway","nb":"building are rarely turned over in the season that test every system a project completed in january cannot demonstrate chiller capacity cooling tower control or summer humidity performance one completed in july cannot show how heating plant freeze protection and winter humidification behave at 25 c canada wide seasonal swing make this a bigger issue here than in many place seasonal testing addresse the gap test that cannot be performed under realistic condition at turnover are scheduled for the appropriate season usually within the first year of occupancy deferred testing is a broader term covering any commissioning activity postponed beyond turnover whether because of season incomplete construction low occupancy or equipment delivery delay why simulation is not alway enough during functional performance testing many seasonal condition can be simulated by overriding sensor value at the building automation system overriding the outdoor air temperature to 20 c in summer for example will show whether the economizer close to minimum and the preheat valve open that verify control logic what override cannot show is how the physical system perform under real load whether the heating plant can meet the load on the coldest day whether preheat coil and freeze protection prevent coil damage when outdoor air is actually far below freezing whether the chiller plant stage properly and maintain supply temperature on a hot humid afternoon whether cooling tower control properly at high wet bulb temperature and whether winter operation and basin heating work when needed whether dehumidification and humidification hold space condition within the specified range whether control loop remain stable across the full range of load real condition also reveal problem that simulation never expose such as stratification in mixing plenum coil freeze ups at specific damper position or sensor affected by solar radiation what to test in each season season typical seasonal test peak winter boiler an"},{"k":"Guide","u":"/guides/tab-certification-bodies-aabc-nebb-and-tabb/","t":"TAB certification bodies: AABC, NEBB and TABB","s":"Understand what AABC, NEBB and TABB certification means, how the three programs differ, and what owners and engineers should write into a TAB specification.","nh":"testing balancing and commissioning why certification matter the three organization aabc nebb tabb side by side comparison independence doe it matter writing certification into a specification related certification frequently asked question is one certification better than the other doe certification guarantee a good tab report key takeaway","nb":"testing adjusting and balancing tab is specialized work that rely on calibrated instrument consistent procedure and experienced technician because the quality of tab is hard for an owner to judge directly project specification commonly require that the tab agency be certified by a recognized independent body in north america three organization dominate the associated air balance council aabc the national environmental balancing bureau nebb and the testing adjusting and balancing bureau tabb all three set procedural standard require minimum instrumentation and certify individual through experience requirement and examination their difference lie mainly in organizational structure independence requirement and the scope of other service they certify this guide summarize each and explain how to use certification requirement effectively why certification matter there is no general provincial licence for tab work in canada in the way there is for gas fitter or electrician certification by aabc nebb or tabb give owner and engineer some assurance that the firm employ individual who have passed written and practical examination the firm own or has access to the required calibrated instrument work follow a published procedural standard report follow a consistent format and are signed by a certified individual there is a process for resolving complaint about certified work certification doe not replace engineering judgment or project specific requirement but it establishe a baseline of competence the three organization aabc the associated air balance council is an association of independent tab agency its defining feature is independence member agency must be independent of design firm installing contractor and equipment supplier aabc certify individual as test and balance engineer tbe and technician and publishe the national standard for total system balance aabc also offer a project performance guarantee program for work performed by its member aabc commissioning affiliate t"},{"k":"Guide","u":"/guides/what-testing-adjusting-and-balancing-involves/","t":"What testing, adjusting and balancing involves","s":"A plain-language explanation of TAB: what is measured, how air and water systems are adjusted to design, and how TAB fits with commissioning.","nh":"testing balancing and commissioning the three part of tab what a typical tab scope include air system hydronic system related work how the process work tolerance tab and commissioning when tab is needed in existing building frequently asked question who should hire the tab agency how long doe tab take is balancing a one time activity key takeaway","nb":"an hvac system is designed on paper to deliver specific airflow to each room and specific water flow to each coil when it is built it almost never doe so without adjustment duct and pipe are installed slightly differently from the drawing fitting create more or less resistance than calculated and equipment perform a little differently from its catalogue rating testing adjusting and balancing tab is the process of measuring what the system actually deliver and adjusting it until it matche the design intent tab is one of the final step before a building is occupied and it is also needed whenever a system is modified or occupant report persistent comfort problem a balanced system is more comfortable quieter use less energy and support proper ventilation and pressurization the three part of tab testing mean measuring the quantitative performance of equipment and system airflow water flow temperature pressure fan and pump speed and electrical data such as motor amperage adjusting mean changing damper valve drive and control to regulate flow rate and pressure balancing mean proportioning flow within the distribution system so that each outlet terminal unit or coil receive its design quantity within the allowed tolerance the work is governed in north america by ashrae standard 111 which cover measurement testing adjusting and balancing of building hvac system and by the procedural standard of the tab certification body see tab certification body aabc nebb and tabb for how those organization differ what a typical tab scope include air system total airflow of air handling unit rooftop unit make up air unit and exhaust fan outdoor air return air and relief air quantity airflow at each supply diffuser return grille and exhaust register vav and constant volume terminal unit minimum and maximum airflow fan speed static pressure profile across the unit and motor electrical data building and room pressure relationship where specified hydronic system flow through chiller boiler hea"},{"k":"Guide","u":"/guides/air-to-water-heat-pumps-for-commercial-heating/","t":"Air-to-water heat pumps for commercial heating","s":"Learn how air-to-water heat pumps produce hot and chilled water for commercial buildings, why supply water temperature matters so much, and how to size and integrate them in Canadian climates.","nh":"energy efficiency and decarbonization how they work refrigerant supply water temperature is the key constraint testing an existing system sizing in cold climate freeze protection integration with existing boiler placement and site issue frequently asked question can an awhp also provide cooling what cop should i expect are awhp a good fit for very cold site key takeaway","nb":"an air to water heat pump awhp extract heat from outdoor air and deliver it to a water or glycol loop in heating mode it replace or supplement a boiler most unit can also reverse to produce chilled water in summer because many commercial building already distribute heat with hot water awhp are one of the most direct route to electrifying an existing hydronic plant the technology is mature in europe and asia and increasingly common in canada its success in a given building depend mostly on two thing the water temperature the building need and how cold it get outside how they work an awhp is a packaged refrigeration circuit with an outdoor air coil a compressor an expansion device and a water side heat exchanger in heating mode refrigerant evaporate in the air coil absorbing heat from outdoor air even at sub zero temperature then condense in the water heat exchanger releasing heat to the loop unit range from small module to large multi compressor machine many project use several modular unit in parallel which provide redundancy and good part load efficiency some design are four pipe or multi function unit that can produce hot and chilled water simultaneously refrigerant common refrigerant include r 410a r 32 r 454b r 513a r 290 propane and r 744 co2 canada hfc phase down under the ozone depleting substance and halocarbon alternative regulation is pushing manufacturer toward lower global warming potential option co2 unit can produce much higher water temperature and suit domestic hot water and some high temperature heating load but they perform best with a large temperature rise and low return water temperature refrigerant classification and charge also affect where a unit may be placed under csa b52 supply water temperature is the key constraint the efficiency of any heat pump fall as the temperature lift between source and supply increase an awhp making 40 c 104 f water on a mild day may achieve a cop well above 3 the same unit making 60 c 140 f water at minus 20 c m"},{"k":"Guide","u":"/guides/benchmarking-building-energy-use/","t":"Benchmarking building energy use","s":"Learn how energy benchmarking works, which metrics and tools are used in Canada, where reporting is mandatory, and how to turn a benchmark into a prioritized list of HVAC improvements.","nh":"energy efficiency and decarbonization key metric energy use intensity weather normalized eui greenhouse gas intensity water use intensity tool where benchmarking is required the benchmarking process interpreting result from benchmark to action frequently asked question how accurate is benchmarking can i benchmark a building with mixed use what if my building has no separate meter for tenant key takeaway","nb":"benchmarking compare a building energy use with its own past performance with similar building or with a target it is the simplest way to answer the question every owner should ask first is this building using more energy than it should a benchmark doe not explain why a building perform as it doe but it show where to look and help prioritize audit and investment across a portfolio in canada benchmarking is voluntary in most place but mandatory for larger building in some jurisdiction and it is increasingly expected by investor tenant and lender this guide cover the metric tool and process key metric energy use intensity energy use intensity eui is annual energy use divided by floor area it allow building of different size to be compared canadian reporting usually expresse eui in equivalent kilowatt hour per square metre per year ekwh m or gigajoule per square metre gj m converting all fuel to a common energy unit two version are common site eui count energy delivered to the building as measured by the utility meter source eui account for the energy used to generate and deliver that energy which make comparison between electricity and gas fairer energy star portfolio manager use source eui for its score weather normalized eui heating and cooling energy vary with the weather weather normalization adjust actual use to what it would be in a typical year using heating and cooling degree day so year to year change reflect performance rather than a mild or harsh winter greenhouse gas intensity greenhouse gas intensity ghgi typically in kilogram of co2 equivalent per square metre is increasingly reported alongside eui especially where municipal carbon target apply it depend on fuel mix and provincial grid emission factor water use intensity water use per square metre or per occupant is often benchmarked at the same time especially where cooling tower are a major user tool energy star portfolio manager is the standard benchmarking tool in canada administered here by natural "},{"k":"Guide","u":"/guides/building-energy-modeling-for-hvac-design/","t":"Building energy modeling for HVAC design","s":"Learn what building energy modeling is, when it pays to model during HVAC design, which tools and inputs matter, and how to tell a decision-grade model from a compliance exercise.","nh":"energy efficiency and decarbonization load calculation versus energy model when modeling pay off common tool input that drive the result weather envelope and infiltration schedule and internal gain hvac system and control compliance model versus design model reviewing a model frequently asked question will my building actually use the energy the model predict how early should modeling start can a model help with an existing building key takeaway","nb":"building energy modeling is the use of simulation software to predict how much energy a building will use over a full year hour by hour given its envelope occupancy system and local weather for hvac design it answer question a load calculation cannot not just how big the equipment must be on the worst day but how the system will perform across the other 8 700 or so hour when it run at part load a model is only as useful as the decision it inform used early it can steer system selection glazing ratio and heat recovery choice while change are still cheap used late it often become a box ticking exercise to demonstrate code compliance this guide explain how to get the first kind load calculation versus energy model the two are often confused because they use some of the same input item load calculation energy model purpose size equipment for peak condition predict annual energy cost and carbon time frame design day heating and cooling peak 8 760 hour of a representative year weather design temperature from nbc appendix c or ashrae hourly weather file cwec for canadian site equipment capacity only part load curve control schedule typical output kw and l s per zone kwh gj peak demand ghg utility cost a cooling load calculation tell you a chiller must deliver a certain capacity an energy model tell you whether a water cooled chiller with a waterside economizer will save enough over a heat pump plant to justify its cost and how the answer change in calgary versus vancouver when modeling pay off modeling add the most value when there are real choice to compare and the building is large or long lived enough for small percentage difference to matter concept and schematic design comparing system type vav with reheat doa with radiant vrf chilled beam envelope option and heat recovery strategy code compliance the necb performance path and ashrae 90 1 appendix g both require a model of the proposed building compared against a reference or baseline green building program leed energ"},{"k":"Guide","u":"/guides/electrification-of-commercial-heating/","t":"Electrification of commercial heating","s":"Learn the main routes to electrify heating in commercial buildings, why heat pumps are central, how cold climates and electrical service limits shape the design, and how to plan a phased transition.","nh":"energy efficiency and decarbonization why heat pump not resistance heat the main technology route cold climate reality electrical service capacity hot water temperature and distribution operating cost and carbon planning a phased transition frequently asked question will electrification increase my energy bill can i keep my existing boiler do i need refrigerant safety review key takeaway","nb":"most canadian commercial building are heated by natural gas either through boiler serving hot water loop rooftop unit with gas heat section or make up air unit heating is usually the largest source of direct greenhouse gas emission from these building electrification mean replacing that combustion with electrically driven heating most often heat pump so that emission depend on the electricity grid rather than on burning fuel on site electrification is driven by federal and provincial climate policy municipal building performance standard corporate carbon target and rising carbon pricing on fuel done well it can cut emission sharply done carelessly it can raise operating cost overload electrical service and leave occupant cold in a january cold snap this guide cover the decision that separate the two outcome why heat pump not resistance heat electric resistance heating convert electricity to heat at a coefficient of performance cop of 1 a heat pump move heat from a source outdoor air ground or a water loop and typically deliver two to four unit of heat per unit of electricity depending on source and supply temperature because electricity usually cost several time more per unit of energy than natural gas in most province resistance heating alone rarely make economic sense at scale heat pump close much of that cost gap resistance heat still has a role as backup for small load or for the coldest hour where a heat pump output fall off the main technology route approach typical application key consideration air source rooftop heat pump low rise retail office school with rtus low ambient capacity defrost backup heat cold climate vrf office multi unit residential hotel refrigerant charge limit under csa b52 piping length air to water heat pump building with hydronic heating lower supply water temperature than boiler ground source heat pump new construction campuse with land high first cost very stable performance water source heat pump loop building with simultaneous heatin"},{"k":"Guide","u":"/guides/embodied-and-operational-carbon-in-hvac-systems/","t":"Embodied and operational carbon in HVAC systems","s":"Learn what makes up the carbon footprint of an HVAC system over its life, why refrigerant leakage and provincial grid intensity matter so much, and how to compare options on a whole-life basis.","nh":"energy efficiency and decarbonization the whole life carbon framework operational carbon refrigerant emission embodied carbon of equipment and distribution design strategy to reduce whole life carbon comparing option frequently asked question is embodied carbon or operational carbon bigger for hvac do i need an epd for every piece of equipment doe switching to a low gwp refrigerant change maintenance key takeaway","nb":"the carbon footprint of an hvac system has two part operational carbon come from the energy the system use every year gas burned on site and electricity drawn from the grid embodied carbon come from making transporting installing maintaining and eventually disposing of the equipment ductwork and piping for hvac there is a third component that is easy to overlook refrigerant that leak out over the system life much of which has a global warming potential gwp hundred or thousand of time that of carbon dioxide as building become more efficient and grid cleaner embodied and refrigerant emission become a larger share of the total owner pursuing net zero carbon the cagbc zero carbon building standard or municipal requirement in city such as toronto and vancouver increasingly need to understand all three the whole life carbon framework whole life carbon assessment commonly follow the life cycle stage defined in en 15978 and iso 21930 which group emission as follow stage description hvac example a1 to a3 product stage manufacturing chiller ahus ductwork piping insulation a4 to a5 construction stage transport to site installation initial refrigerant charge losse b1 to b7 use stage refrigerant leakage maintenance replacement of component operational energy c1 to c4 end of life removal refrigerant recovery recycling or disposal d beyond the life cycle benefit from recycling metal and reclaimed refrigerant embodied carbon usually refer to everything except operational energy b6 and operational water b7 refrigerant leakage is reported in the use stage but is often discussed separately because of its size operational carbon operational carbon is energy use multiplied by an emission factor for each fuel natural gas has a relatively fixed emission factor per unit of energy burned electricity depend on how the provincial grid generate power province with mostly hydroelectric or nuclear generation such as quebec british columbia manitoba and ontario have low grid intensity alberta sas"},{"k":"Guide","u":"/guides/geothermal-heat-exchange-for-commercial-buildings/","t":"Geothermal heat exchange for commercial buildings","s":"Learn how commercial ground-source heat pump systems use the earth as a heat source and sink, how borefields are designed and tested, and why long-term thermal balance matters in heating-dominated Canadian climates.","nh":"energy efficiency and decarbonization system type how the building connect designing the borefield key input thermal response testing ground thermal balance in canada code and standard antifreeze and loop fluid cost and economic frequently asked question how much land doe a borefield need doe ground source heat work in edmonton or winnipeg how long do ground loop last key takeaway","nb":"a few metre below the surface ground temperature stay nearly constant through the year typically somewhere between about 5 and 12 c 41 and 54 f in populated part of canada depending on location ground source heat exchange often called geothermal or geoexchange use that stable temperature as a heat source in winter and a heat sink in summer heat pump lift the temperature to useful level for heating or reject heat to the ground for cooling because the source temperature doe not plunge on a january night the way outdoor air doe ground source heat pump maintain capacity and efficiency in cold weather that make them attractive for electrifying heating in edmonton calgary winnipeg and other cold climate the trade off is a higher first cost and a design that must get the ground side right because a borefield is very expensive to fix once installed system type type description typical commercial use vertical closed loop borehole often 60 to 180 m 200 to 600 ft deep with plastic u tube and grout most common for commercial site with limited land horizontal closed loop pipe in trenche 1 5 to 3 m deep low rise building with large open land open loop groundwater water pumped from a well through a heat exchanger returned to an aquifer site with good aquifer and regulatory approval surface water loop coil in a lake or pond lakeside site foundation or pile loop loop cast into foundation pile new construction with deep foundation closed loop system circulate water or an antifreeze solution in sealed piping open loop system can be very efficient but depend on groundwater quality quantity and provincial water licensing how the building connect the ground loop typically connect to distributed water to air heat pump on a common building loop a classic water source heat pump system central water to water heat pump producing hot and chilled water for hydronic distribution radiant system or air handler hybrid plant where the borefield is combined with a boiler cooling tower dry cooler or a"},{"k":"Guide","u":"/guides/hvac-energy-audits-ashrae-level-1-2-and-3/","t":"HVAC energy audits: ASHRAE Level 1, 2 and 3","s":"Understand the three ASHRAE audit levels, what each delivers for HVAC systems, and how to use audit results to plan energy and carbon reduction projects.","nh":"energy efficiency and decarbonization the governing standard preliminary energy use analysis level 1 walk through typical level 1 hvac activity level 1 deliverable level 2 energy survey and analysis typical level 2 hvac activity level 2 deliverable level 3 detailed analysis of capital intensive modification typical level 3 hvac activity level 3 deliverable comparing the level choosing the right level making audit lead to action frequently asked question how often should a building be audited can an audit be done without a bas key takeaway","nb":"an energy audit answer three question about a building how much energy it use where that energy goe and what can be done to reduce it in most commercial building hvac system account for a large share of energy use so hvac is usually the focus of the audit and the source of many of the best opportunity audit come in different depth ashrae define three level from a quick walk through to a detailed engineering analysis suitable for major capital investment choosing the right level save money a level 3 audit is wasted on a building that has not yet fixed its schedule while a level 1 audit will not support a decision to replace a chiller plant this guide explain each level and how to use them the governing standard ashrae standard 211 standard for commercial building energy audit first published in 2018 set minimum requirement for each audit level including the data to collect the analysis to perform and the content of the report before standard 211 the level were described in ashrae procedure for commercial building energy audit standard 211 brought consistency so that owner comparing audit proposal can expect similar deliverable from provider offering the same level standard 211 also define a preliminary energy use analysis peua which come before a level 1 audit and rely on utility data and basic building information preliminary energy use analysis the peua establishe the building energy use profile from at least 12 month and preferably several year of utility data it calculate energy use intensity eui energy cost per unit floor area and where possible compare the building with similar building in canada energy star portfolio manager supported by natural resource canada is the common tool for this comparison see benchmarking building energy use the peua tell the owner whether the building is a poor average or good performer which help decide whether a deeper audit is worthwhile level 1 walk through a level 1 audit add a brief site visit to the peua the auditor tour the"},{"k":"Guide","u":"/guides/heat-pump-retrofits-in-commercial-buildings/","t":"Heat pump retrofits in commercial buildings","s":"A step-by-step look at retrofitting heat pumps into existing commercial buildings, including how to match heat pump types to existing systems and the practical issues that derail projects.","nh":"energy efficiency and decarbonization start with an assessment matching the heat pump to the existing system rooftop unit replacement hydronic system vrf retrofit practical issue that derail retrofit structure and space noise defrost and condensate ventilation air control integration phasing in an occupied building commissioning and the first winter frequently asked question should i replace equipment before it fail can heat pump provide all the heat in edmonton or calgary are incentive available key takeaway","nb":"a heat pump retrofit replace or supplement existing heating and cooling equipment in an occupied building with heat pump unlike new construction the designer has to work around what is already there the existing distribution system structure electrical service roof space ceiling height and tenant who need heat and cooling throughout the work the broader case for electrification is covered in electrification of commercial heating this guide focuse on the practical work of getting heat pump into an existing building and making them perform start with an assessment before choosing equipment collect enough information to understand the building as it actually operate utility data at least 12 month of gas and electricity bill and interval electricity data if available to establish heating energy and peak electrical demand existing equipment inventory age condition capacity and remaining service life of boiler rtus chiller air handler and terminal unit distribution system hot water supply temperature terminal unit type ductwork condition and any known comfort problem heating load a calculated heat loss using current envelope condition compared with installed capacity existing plant are often oversized by a wide margin electrical capacity service size actual peak demand and available space in switchgear physical constraint roof structure mechanical room space outdoor location for unit noise sensitive neighbour and refrigerant piping route trend data from the building automation system if it exist is valuable hot water temperature and valve position during cold weather show how much margin the existing system has matching the heat pump to the existing system the existing distribution system usually determine the most practical heat pump type existing system likely retrofit option note gas fired rooftop unit heat pump rooftop unit check low ambient capacity and backup heat curb adapter often needed boiler with hot water radiation or coil air to water or water to water heat p"},{"k":"Guide","u":"/guides/heat-recovery-strategies-in-commercial-hvac/","t":"Heat recovery strategies in commercial HVAC","s":"Compare the main ways to recover heat in commercial buildings, including wheels, plates, run-around loops, heat pipes, heat recovery chillers and refrigeration heat recovery, and learn where each fits.","nh":"energy efficiency and decarbonization where the recoverable heat is exhaust air energy recovery rotary wheel fixed plate exchanger heat pipe run around loop frost control in canadian climate water side and refrigerant heat recovery heat recovery chiller refrigeration heat recovery data center heat reuse designing heat recovery that work frequently asked question is heat recovery required by code can heat recovery be added to an existing air handler doe heat recovery reduce equipment size key takeaway","nb":"every commercial building throw heat away exhaust air leave at room temperature in the middle of winter chiller reject heat to cooling tower while perimeter zone call for heating and refrigeration system dump condenser heat outdoor heat recovery capture some of that energy and put it back to work reducing the heating plant load and often its size in canada where heating season are long and outdoor air is very cold heat recovery is one of the most effective energy measure available the necb require exhaust air heat recovery on many air system and most net zero and low carbon strategy depend on it this guide survey the main approache and the design issue that determine whether they deliver where the recoverable heat is heat source typical recovery method typical use of recovered heat general and toilet exhaust air energy recovery wheel plate exchanger heat pipe preheat ventilation air laboratory or contaminated exhaust run around glycol loop preheat outdoor air without cross contamination chilled water return cooling load heat recovery chiller water to water heat pump heating hot water domestic hot water refrigeration condenser desuperheater condenser heat recovery space heating underfloor heating in arena domestic hot water data and server room heat recovery chiller water loop building or district heating drain water and sewage drain water heat exchanger wastewater heat pump domestic hot water preheat flue gas condensing heat exchanger economizer boiler feedwater or return water preheat exhaust air energy recovery recovering heat from exhaust air to preheat incoming outdoor air is the most common strategy the main device differ in effectiveness cross leakage moisture transfer and pressure drop rotary wheel enthalpy wheel transfer both sensible heat and moisture sensible wheel transfer heat only wheel achieve high effectiveness and the moisture transfer help keep indoor humidity up in winter some exhaust air can carry over into the supply air so wheel are generally no"},{"k":"Guide","u":"/guides/life-cycle-cost-analysis-for-hvac-options/","t":"Life-cycle cost analysis for HVAC options","s":"Learn how life-cycle cost analysis works for HVAC decisions, which costs and assumptions belong in it, and how to present results so owners can choose between systems with confidence.","nh":"energy efficiency and decarbonization what lcca measure cost to include key assumption study period discount rate energy price escalation equipment service life procedure sensitivity and risk adding carbon frequently asked question is lcca worth doing for small project how accurate doe the energy estimate need to be should incentive be included key takeaway","nb":"hvac system are often chosen on first cost with a simple payback calculation to justify any premium for efficiency that approach ignore most of what a system actually cost to own over a 25 to 30 year life energy maintenance repair and replacement of component usually add up to far more than the original purchase price life cycle cost analysis lcca bring all of those cost into one comparison expressed in today dollar lcca is especially useful when option differ in kind such as comparing a gas boiler plant with air to water heat pump or vav with doa and radiant these choice trade higher capital cost against lower operating cost different maintenance need and different exposure to energy and carbon price what lcca measure the usual result is the total present value of cost for each option over a common study period the option with the lowest life cycle cost is the most economical all else being equal recognized method include astm e917 standard practice for measuring life cycle cost of building and building system iso 15686 5 for building and constructed asset and the us nist handbook 135 which is widely referenced for federal energy project related metric often reported alongside it net saving the difference in life cycle cost between an option and the base case saving to investment ratio sir discounted saving divided by the additional investment value above 1 indicate a worthwhile investment discounted payback the time for discounted saving to repay the extra investment internal rate of return the discount rate at which net saving equal zero simple payback ignore the time value of money and anything that happen after the payback date so it should not be the only metric cost to include cost category example note initial capital equipment installation electrical upgrade structural work design fee commissioning include knock on cost such as service upgrade or roof reinforcement energy electricity energy and demand charge natural gas district energy use actual rate struc"},{"k":"Guide","u":"/guides/measurement-and-verification-of-energy-savings/","t":"Measurement and verification of energy savings","s":"Understand how energy savings are measured rather than assumed, how to choose an IPMVP option, how baselines are built and adjusted, and what a credible M&V plan contains.","nh":"energy efficiency and decarbonization the core equation the ipmvp option choosing an option ashrae guideline 14 building a baseline writing an m v plan common pitfall using building automation data frequently asked question do utility incentive program require m v how long should m v last can i use an energy audit estimate as proof of saving key takeaway","nb":"energy saving cannot be measured directly you can measure how much energy a building use but saving are the difference between what it used and what it would have used without the project and that second number never happen measurement and verification m v is the discipline of estimating that counterfactual credibly using metered data adjustment for weather and other change and a documented method that other can check m v matter whenever money depend on saving energy performance contract utility incentive program that pay for performance green bond internal capital approval and carbon reporting it also matter for learning because many project deliver less than predicted and only measurement reveal why the core equation all m v method rest on the same idea saving baseline energy adjusted to reporting period condition minus reporting period energy plus or minus adjustment the baseline period is a representative period before the project usually 12 month the reporting period is after implementation because weather occupancy and operating hour differ between period the baseline must be adjusted so both period are compared on the same condition two type of adjustment are used routine adjustment for factor expected to change and that can be modelled such as heating and cooling degree day production volume or occupancy non routine adjustment for one off change such as an added floor a new tenant with a server room or a change in operating hour the ipmvp option the international performance measurement and verification protocol ipmvp maintained by the efficiency valuation organization define four option most canadian utility program and performance contract refer to it option measurement boundary what is measured typical hvac use a retrofit isolation key parameter the retrofitted equipment one key parameter measured other estimated motor replacement where hour are stipulated and power is measured b retrofit isolation all parameter the retrofitted equipment all relevant para"},{"k":"Guide","u":"/guides/necb-2020-and-hvac-compliance/","t":"NECB 2020 and HVAC compliance","s":"An overview of how NECB 2020 treats HVAC systems, the prescriptive, trade-off and performance compliance paths, the new tiered structure, and the HVAC items that most often cause compliance problems.","nh":"energy efficiency and decarbonization how the necb is organized the three compliance path prescriptive path trade off path performance path what is new in necb 2020 key hvac requirement in part 5 how province adopt it common hvac compliance problem frequently asked question doe an existing building have to meet necb 2020 is necb compliance the same as low energy use who sign off on compliance key takeaway","nb":"the national energy code of canada for building necb set minimum energy efficiency requirement for the design and construction of new building and addition it is published by the national research council of canada as a model code which mean it has no legal force until a province territory or municipality adopt it necb 2020 is the current edition in use across much of canada although some jurisdiction still reference necb 2017 or their own modified version for hvac designer and building owner the necb affect equipment efficiency heat recovery fan and pump power control duct and pipe insulation and the way whole building energy performance is demonstrated this guide summarize the part that matter most for mechanical system it is not a substitute for reading the code edition adopted by your authority having jurisdiction ahj how the necb is organized the necb is divided into part the section most relevant to mechanical design are part subject hvac relevance part 3 building envelope drive heating and cooling load part 4 lighting internal gain and cooling load part 5 hvac system equipment distribution control heat recovery part 6 service water heating water heater recirculation pool heating part 7 electrical power system and motor motor efficiency metering part 8 building energy performance compliance path whole building modeling part 3 to 7 each contain prescriptive requirement and in most case a trade off option part 8 provide the alternative of demonstrating compliance by energy modeling the three compliance path prescriptive path every requirement in the relevant part is met as written for hvac this mean meeting the minimum equipment efficiency fan power limit heat recovery requirement economizer requirement insulation level and control provision in part 5 it is straightforward to check but leave no room to offset a shortfall in one area with a gain in another trade off path within a single part a designer can show that a non compliant element is offset by better per"},{"k":"Guide","u":"/guides/net-zero-ready-building-hvac-strategies/","t":"Net-zero ready building HVAC strategies","s":"Learn what net-zero ready means for commercial buildings, why load reduction comes first, and the HVAC system approaches that consistently support net-zero energy and zero carbon targets in Canadian climates.","nh":"energy efficiency and decarbonization load reduction come first core hvac strategy decoupled ventilation with energy recovery heat pump low temperature distribution heat sharing and recovery domestic hot water renewable readiness control metering and commissioning design process frequently asked question is net zero ready much more expensive to build can gas equipment be used in a net zero ready building doe net zero ready mean the building will actually perform key takeaway","nb":"a net zero energy building produce as much renewable energy as it use over a year a net zero energy ready building is designed and built so efficiently that it could reach net zero with the addition of on site or nearby renewable generation even if that generation is not installed yet zero carbon is a related target that focuse on greenhouse gas emission rather than energy and usually allow clean electricity or offset to cover remaining emission canada code are moving in this direction the necb 2020 performance tier and the bc energy step code give jurisdiction a path toward net zero energy ready construction and the federal government has stated an intent for model code to reach that level the cagbc zero carbon building standard is a widely used voluntary framework for commercial building whatever the label the hvac strategy that work are broadly the same load reduction come first hvac system cannot make up for a building that lose too much heat net zero ready project begin by reducing load so that the remaining demand is small enough for efficient electric system and realistic renewable generation envelope high effective r value careful treatment of thermal bridge high performance glazing and moderate window to wall ratio airtightness measured air leakage target verified by whole building testing solar control exterior shading and glazing selection to limit cooling load without losing daylight internal load efficient lighting and equipment which reduce cooling load and electricity directly metric such as thermal energy demand intensity tedi total energy use intensity teui and greenhouse gas intensity ghgi are used by the bc energy step code the toronto green standard and other program to set target that reward load reduction rather than only efficient equipment core hvac strategy strategy why it matter for net zero ready decoupled ventilation doa ventilation is sized for people not for heating and cooling and fan can be small high effectiveness energy recovery rec"},{"k":"Guide","u":"/guides/night-setback-and-optimal-start/","t":"Night setback and optimal start","s":"Learn how unoccupied setpoints and adaptive start and stop algorithms reduce energy use, how to choose setback temperatures, and the control mistakes that erase the savings or cause morning comfort complaints.","nh":"energy efficiency and decarbonization how setback save energy typical setpoint optimal start morning warm up without ventilation optimal stop cold climate consideration common problem verifying setback and optimal start frequently asked question doe setback save energy with heat pump what about building occupied around the clock is setback required by code key takeaway","nb":"most commercial building are occupied for fewer than half the hour in a week during the rest there is little reason to hold full comfort condition or bring in full ventilation air night setback lowering heating setpoint and setup raising cooling setpoint during unoccupied period reduce the energy needed to condition the building optimal start and stop control then decide day by day exactly when to begin and end conditioning so that comfort is reached when people arrive and maintained until they leave these are among the oldest energy measure in building automation and they are required by energy code such as the necb and ashrae 90 1 yet trend data from existing building regularly show them disabled overridden or tuned so poorly that the saving disappear this guide explain how they work and how to set them up properly how setback save energy heat loss through the envelope and by infiltration is roughly proportional to the temperature difference between inside and outside lowering the indoor temperature overnight reduce that difference so the building lose less heat while unoccupied the building doe have to be reheated in the morning but the energy needed to recover is less than the energy saved by allowing it to cool provided the setback period is long enough the larger saving in many commercial building come not from the setpoint change itself but from what goe with it air handler shut off instead of running continuously outdoor air damper close eliminating the ventilation heating load exhaust fan stop pump and central plant can shut down or run at minimum in a canadian winter eliminating overnight ventilation heating is often worth more than the envelope saving typical setpoint setback and setup value are a balance between saving recovery time and risk such as freezing or condensation typical starting point for office and similar building mode occupied setpoint typical unoccupied setpoint heating 21 to 22 c 70 to 72 f 15 to 18 c 59 to 64 f cooling 23 to 24 c 73 to "},{"k":"Guide","u":"/guides/reducing-fan-energy/","t":"Reducing fan energy","s":"Understand what drives fan energy, why airflow and pressure matter far more than motor efficiency alone, and which retrofit and design measures deliver the biggest savings.","nh":"energy efficiency and decarbonization what determine fan power move less air right size design airflow reduce minimum airflow ventilation and schedule reduce pressure static pressure reset find and remove pressure drop balance then slow down move air more efficiently fan selection fan array drive and motor procedure for a fan energy review frequently asked question will reducing airflow cause comfort problem is a vfd alway worth installing how much can static pressure reset save key takeaway","nb":"fan run more hour than almost any other hvac equipment in many commercial building supply return and exhaust fan operate 12 to 24 hour a day every day and fan energy can be one of the largest electrical end use in the building because fan power rise steeply with airflow modest reduction in airflow or pressure can produce surprisingly large saving this guide explain where fan energy goe and the measure that reduce it roughly in order of how much they usually matter what determine fan power the power a fan draw from the electrical system is fan input power w airflow m s x total pressure pa overall efficiency overall efficiency combine the fan the drive belt or direct and the motor plus any variable frequency drive losse in imperial unit brake horsepower equal airflow in cfm time total pressure in inche of water divided by 6 356 time fan efficiency three lever follow directly move less air move it against less pressure move it more efficiently the fan law show why the first lever is so powerful for a given system power vary roughly with the cube of fan speed reducing airflow by 20 percent can in theory reduce fan power by about half in real vav system with a fixed static pressure setpoint the saving are smaller which is why pressure control matter as much as airflow see fan law and how to apply them for the detail and limitation move less air right size design airflow many system were designed with generous safety factor on cooling load which carry straight through to airflow re examining actual load after lighting retrofit occupancy change or envelope improvement often show that design airflow can be reduced reduce minimum airflow vav boxe with high minimum airflow setting keep the fan running at higher flow than necessary and cause reheat ashrae guideline 36 sequence use lower minimum tied to ventilation requirement lowering minimum require checking ventilation and air distribution but is among the most cost effective retrofit measure ventilation and schedule demand "},{"k":"Guide","u":"/guides/reducing-pump-energy/","t":"Reducing pump energy","s":"Learn what drives pump energy in chilled water, hot water and condenser water systems, and the design, retrofit and control measures that reduce it without starving coils.","nh":"energy efficiency and decarbonization what determine pump power move less water design for a larger temperature difference fix low delta t convert to variable flow stop pump when not needed reduce pressure differential pressure setpoint and reset remove unnecessary resistance trim or slow oversized pump move water more efficiently pump selection motor and drive condenser water and cooling tower procedure for a pump energy review frequently asked question do i still need balancing valve with variable speed pump can i put a vfd on any pump what about chiller minimum flow key takeaway","nb":"pump move water through heating cooling and condenser loop and like fan they often run long hour in many older building pump run at constant speed year round with the excess pressure throttled away by balancing valve and three way control valve that design is simple but waste energy whenever load are below peak which is nearly all the time pump energy reduction follow the same logic as fan energy move less water against less pressure more efficiently this guide work through each lever and the pitfall that come with them what determine pump power pump input power is pump input power w flow l s x pressure rise kpa overall efficiency overall efficiency combine the pump motor and any vfd in imperial unit brake horsepower equal flow in usgpm time head in feet divided by 3 960 time pump efficiency the affinity law say that for a given system power vary roughly with the cube of pump speed real system have a fixed pressure component such as a differential pressure setpoint or a static lift in an open cooling tower circuit so actual saving at reduced flow are smaller than the ideal cube law suggest even so variable flow system use far less energy than constant flow system at typical load move less water design for a larger temperature difference flow is inversely proportional to the temperature difference across the coil a chilled water system designed for a 7 c 12 6 f difference move considerably less water than one designed for 5 5 c 10 f with smaller pipe and pump heating system designed for low temperature heat pump often use larger difference as well subject to coil selection fix low delta t many chilled water plant operate with a much smaller temperature difference than design a problem known as low delta t syndrome the plant must pump more water to deliver the same cooling cause include three way valve coil with fouled surface incorrect setpoint and control valve that are oversized or leaking fixing them reduce both pumping and chiller energy convert to variable flow "},{"k":"Guide","u":"/guides/solar-thermal-and-pv-integration-with-hvac/","t":"Solar thermal and PV integration with HVAC","s":"Compare solar thermal, solar air heating and photovoltaics as partners for commercial HVAC, and learn the design, code and control issues that decide whether solar energy actually reduces building loads.","nh":"energy efficiency and decarbonization comparing the option solar thermal for hot water solar air heating pv and heat pump solar with thermal storage control economic frequently asked question should i choose solar thermal or pv doe snow make solar ineffective in canada can pv power my heat pump in winter key takeaway","nb":"solar energy can serve a building hvac and hot water system in two broad way solar thermal system capture sunlight as heat either in water or glycol for domestic hot water and space heating or in air for preheating ventilation photovoltaic pv system convert sunlight to electricity which can then run heat pump fan and pump as building electrify pv has become the more common choice but solar thermal still has strong application where heat is needed in the right quantity at the right time much of southern canada has good solar resource with the prairy among the sunniest region in the country the challenge is not the amount of sunlight over a year but its timing most solar energy arrive in summer while heating load peak in winter good integration account for that mismatch comparing the option technology output best matche main limitation glazed flat plate or evacuated tube collector hot water or glycol domestic hot water pool process heat overheating in summer if load are small freeze protection unglazed collector warm water outdoor pool low temperature preheat low temperature output mostly seasonal transpired solar air collector preheated outdoor air ventilation preheat for building with large outdoor air flow only useful when ventilation run during daylight photovoltaic pv electricity heat pump fan pump plug load export to grid output depend on grid interconnection rule and storage pv thermal pvt electricity and low grade heat heat pump source pool heating more complex smaller market solar thermal for hot water domestic hot water is the classic solar thermal load because demand exist year round hotel multi unit residential building long term care home fitness center and laundry are good candidate a typical commercial system include collector a glycol loop with a pump station a heat exchanger solar storage tank and a conventional or heat pump water heater as backup design point size to the summer load not the annual load to avoid overheating and stagnation when demand "},{"k":"Guide","u":"/guides/utility-incentives-for-hvac-upgrades-in-canada/","t":"Utility incentives for HVAC upgrades in Canada","s":"An overview of the incentive and financing programs available for commercial HVAC upgrades across Canada, how prescriptive and custom programs differ, and the steps that protect your eligibility.","nh":"energy efficiency and decarbonization type of program prescriptive versus custom who offer incentive by region what program usually require a process that protect eligibility using incentive in the business case frequently asked question can i get an incentive after the equipment is installed do incentive cover emergency replacement who prepare custom saving calculation key takeaway","nb":"incentive program can cover a meaningful share of the cost of efficient hvac equipment control upgrade study and electrification project in canada they come from many source electric and gas utility provincial agency municipality and the federal government program change often budget run out and eligibility rule are strict the single most common reason project miss out is ordering equipment or starting work before getting pre approval this guide explain the main type of program who typically offer them in each region and a process that protect eligibility because specific program amount and deadline change frequently alway confirm current detail directly with the program administrator before planning around an incentive type of program program type how it work typical hvac example prescriptive rebate fixed amount per unit or per unit of capacity for qualifying equipment high efficiency rtus condensing boiler vfd heat pump smart thermostat custom incentive paid per unit of verified annual energy saving kwh m or gj chiller plant upgrade heat recovery control retrofit electrification study funding cover part of the cost of audit feasibility study or energy modeling ashrae level 2 audit decarbonization plan new construction program incentive for design that beat the energy code modeled performance against necb reference retro commissioning and operation funding for investigation and low cost control fixe rcx study bas tuning monitoring based commissioning financing low interest loan or repayment through property tax property assessed clean energy infrastructure bank program tax credit credit against eligible capital cost federal clean technology investment tax credit for heat pump and similar equipment prescriptive versus custom prescriptive program are simple buy a qualifying product submit invoice and specification sheet and receive a fixed rebate they suit like for like replacement with better equipment custom program require an engineering calculation of saving pre "},{"k":"Guide","u":"/guides/ashrae-tc-9-9-thermal-guidelines-for-data-centers/","t":"ASHRAE TC 9.9 thermal guidelines for data centers","s":"Learn what the ASHRAE TC 9.9 recommended and allowable envelopes mean, how equipment classes A1 to A4 and H1 differ, how humidity and altitude are treated, and how to use the guidelines to save cooling energy safely.","nh":"data center cooling and hvac design where condition are measured recommended versus allowable the recommended envelope equipment classe altitude derating rate of temperature change humidity and static electricity liquid cooling classe using the guideline to save energy frequently asked question is the recommended range a requirement why do some operator still run cold do the guideline apply to small server room key takeaway","nb":"ashrae technical committee 9 9 mission critical facility data center technology space and electronic equipment publishe the guideline most of the industry use to set temperature and humidity condition in data center the core document thermal guideline for data processing environment is developed with input from it equipment manufacturer and define the condition at which server storage and networking equipment can operate reliably the guideline have reshaped data center design over the past two decade earlier practice was to keep room cold often around 20 c 68 f or lower with tight humidity control successive edition widened the recommended range allowing warmer air less humidity control and far more economizer hour understanding what the guideline actually say and what they do not is the starting point for efficient cooling where condition are measured the guideline apply to the air entering the it equipment measured at the server inlet they do not refer to return air temperature room average temperature or the temperature at the cooling unit a room can have a comfortable average temperature while individual server draw hot recirculated air or a warm hot aisle while every inlet is within range this is why containment and airflow management matter so much they make the supply temperature at the cooling unit a reliable proxy for inlet temperature sensor for control and monitoring should be at rack inlet typically at several height recommended versus allowable the guideline define two kind of envelope recommended envelope the range in which equipment is expected to operate with high reliability and reasonable energy efficiency over the long term facility should aim to operate here most of the time allowable envelope the wider range in which manufacturer have tested equipment to function operating here for limited period is acceptable but extended operation may affect reliability fan energy and acoustic noise within the server operating in the allowable range for part o"},{"k":"Guide","u":"/guides/airflow-management-blanking-panels-cable-cutouts-and-leakage/","t":"Airflow management: blanking panels, cable cutouts and leakage","s":"Explains the airflow problems found in most data centers, the low-cost fixes that solve them, and how to measure the results before raising setpoints.","nh":"data center cooling and hvac design two problem bypass and recirculation the main fixe blanking panel rack level sealing cable cutout and floor opening perforated tile placement row end and gap in row ceiling and return path typical finding and fixe a practical procedure measuring success energy impact frequently asked question do blanking panel really matter if i have containment can i make these change in a live data center key takeaway","nb":"in many data center the cooling unit produce far more cold air than the it equipment actually draw yet some server still run hot the reason is poor airflow management cold air escape through gap and opening before it reache server inlet and hot exhaust find its way back to the front of the rack operator respond by lowering setpoint and running more unit which waste energy without fixing the cause airflow management is the set of physical measure that make cold air go where it is needed and keep hot air away from inlet it is usually the cheapest efficiency improvement in a data center and a prerequisite for raising temperature using economizer or adding density two problem bypass and recirculation bypass airflow is conditioned air that return to the cooling unit without passing through it equipment it leak through cable cutout gap around rack misplaced perforated tile and open space in the floor or ceiling bypass air waste fan energy and lower return temperature which reduce cooling unit capacity and efficiency recirculation is hot exhaust air that flow back to server inlet through empty rack space over the top of rack around row end or under rack recirculation cause hot spot which lead operator to lower supply temperature for the whole room the two problem often coexist a room can have both excess supply airflow and hot spot because the cold air is going to the wrong place the main fixe blanking panel empty rack unit let hot exhaust flow from the back of a rack to the front blanking panel close these opening they should be installed in every unused rack position including at the top and bottom of rack and in partially filled position tool less snap in panel make it more likely that panel go back in after equipment move some organisation make blanking part of the change management procedure so it is not forgotten rack level sealing gap between the equipment rail and the rack side and under the rack allow air to bypass the equipment side panel or seal between the moun"},{"k":"Guide","u":"/guides/battery-and-ups-room-hvac/","t":"Battery and UPS room HVAC","s":"Learn how to size cooling for UPS equipment, keep batteries at the temperature that protects their life, and ventilate for hydrogen and lithium-ion off-gas risks.","nh":"data center cooling and hvac design where the heat come from ups module battery switchgear and transformer battery temperature the number that matter most temperature uniformity ventilation for lead acid battery lithium ion battery choosing the cooling system cooling during a power failure commissioning and monitoring frequently asked question can the ups and battery share one room do vrla battery need ventilation if they are sealed key takeaway","nb":"the uninterruptible power supply ups room is the part of a data center that keep everything else running when the utility fail it is also a room with two very different hvac job removing steady heat from power electronic and keeping battery string at a temperature and air quality that protect both their life and the people who work near them treating the ups room as just another electrical room is a common mistake battery chemistry room layout code requirement and the cooling system own power supply all shape the design this guide cover the main decision for lead acid and lithium ion installation where the heat come from ups module a double conversion ups lose a few percent of the power passing through it as heat modern unit commonly run in the mid 90s percent efficiency range at typical load with higher figure in eco or bypass mode and lower figure at light load the heat rejected to the room is approximately heat kw it load kw x 1 efficiency 1 for a 500 kw it load through a ups at 95 percent efficiency that is about 26 kw of continuous heat roughly 7 5 ton of refrigeration use the manufacturer efficiency curve at the expected operating load not the nameplate peak and remember that redundant ups configuration often run each module at partial load where efficiency drop battery switchgear and transformer battery themselve produce little heat while floating but they release significant heat during discharge and recharge switchgear static transfer switche power distribution unit and any transformer in the room add their own losse get loss data from the electrical engineer rather than estimating it from floor area battery temperature the number that matter most battery life is rated at a reference temperature normally 25 c 77 f valve regulated lead acid vrla battery are especially sensitive a widely used industry rule is that service life roughly halve for each 8 to 10 c 15 to 18 f of sustained operation above 25 c cold temperature reduce available capacity so a room tha"},{"k":"Guide","u":"/guides/cfd-modeling-for-data-centers/","t":"CFD modeling for data centers","s":"Explains how CFD modeling predicts airflow and temperatures in data centers, how to use it for design, failure analysis and capacity planning, and how to make sure the model reflects reality.","nh":"data center cooling and hvac design what cfd can tell you when cfd is worth doing building a model geometry cooling equipment it equipment leakage validation reading the result software and modeler keeping model current limitation frequently asked question how long doe a cfd study take can cfd help with energy saving should i model failure of every cooling unit key takeaway","nb":"computational fluid dynamic or cfd use numerical method to predict how air move and how temperature distribute in a space in a data center a cfd model can show which rack will receive enough cold air where hot exhaust will recirculate how the room will behave when a cooling unit fail and whether a proposed layout will support new equipment airflow in data center is hard to predict with simple calculation underfloor pressure rack to rack interaction obstruction and leakage all affect result cfd make these effect visible before money is spent but only if the model is built and validated carefully what cfd can tell you rack inlet temperature predicted temperature at the front of each rack compared with the ashrae tc 9 9 recommended range airflow distribution flow through each perforated tile or grille and underfloor or plenum pressure map recirculation and bypass where hot air return to inlet and where cold air escape unused failure scenario the effect of losing one or more cooling unit or a power event that stop fan capacity how much more it load each rack position can support while staying within limit design comparison containment option tile layout cooling unit location ceiling return and more when cfd is worth doing situation value of cfd new data hall design confirm layout unit placement and containment before construction adding high density rack to an existing room identify where new load can go and what upgrade are needed persistent hot spot diagnose cause that are not obvious on the floor redundancy verification test failure of each cooling unit in turn energy optimization test raised setpoint and reduced fan speed safely containment retrofit compare hot aisle vs cold aisle option small server room often unnecessary good practice and measurement may suffice building a model a model is a digital representation of the room its accuracy depend on the quality of the input geometry room dimension ceiling height and plenum depth column beam and other obstruction ra"},{"k":"Guide","u":"/guides/crac-vs-crah-units/","t":"CRAC vs CRAH units","s":"Learn how computer room air conditioners and computer room air handlers differ, how each fits with heat rejection and free cooling options, and how to choose between them for a given facility size and density.","nh":"data center cooling and hvac design how a crac work how a crah work side by side comparison efficiency consideration redundancy and resilience water and refrigerant in the white space when to use which frequently asked question are crac and crah being replaced by other system can a crac be converted to a crah what supply temperature should crah and crac deliver key takeaway","nb":"computer room air conditioner crac and computer room air handler crah are the traditional workhorse of data center cooling they look similar both are floor standing cabinet usually placed around the perimeter of the room or at the end of row that draw in warm air cool it and discharge it into a raised floor a contained aisle or the open room the difference is where the cooling come from a crac contain its own refrigeration compressor like a large precision air conditioner a crah contain only a chilled water coil fan and control and depend on a central chilled water plant that one difference shape efficiency scalability redundancy free cooling option and maintenance how a crac work a crac is a direct expansion dx refrigeration system inside the cabinet are a compressor evaporator coil expansion valve and fan the heat absorbed by the evaporator must be rejected outside the room by one of several method air cooled refrigerant piping run to a remote outdoor condenser water cooled a condenser in the unit reject heat to a condenser water loop and cooling tower glycol cooled a condenser reject heat to a glycol loop and outdoor dry cooler many glycol unit add a second coil often called an economizer or free cooling coil that use cold glycol directly when outdoor temperature are low enough pumped refrigerant economizer in cold weather a refrigerant pump replace the compressor and circulate refrigerant to the outdoor condenser because each crac is a self contained cooling system small room can be cooled without a central plant how a crah work a crah has a chilled water coil a control valve fan now commonly ec fan or plenum fan with variable speed and control chilled water come from a central plant of chiller pump and heat rejection equipment the crah control airflow and modulate the chilled water valve to maintain supply air temperature or rack inlet temperature because the refrigeration happen in the central plant the crah itself is simpler and the plant can use large effici"},{"k":"Guide","u":"/guides/chilled-water-plant-design-for-data-centers/","t":"Chilled water plant design for data centers","s":"Explains how a data center chilled water plant differs from a comfort cooling plant, and the design choices that set its efficiency and reliability.","nh":"data center cooling and hvac design how a data center plant differ from a comfort plant water temperature chiller selection economizer integration pumping arrangement redundancy and distribution thermal storage and ride through water treatment and cleanliness control and sequencing phased build out frequently asked question air cooled or water cooled chiller how warm can chilled water be key takeaway","nb":"most large data center reject heat through a chilled water plant chiller pump cooling tower or dry cooler and heat exchanger produce water that serve crah unit air handler in row cooler rear door and coolant distribution unit compared with a comfort cooling plant a data center plant run continuously carry a nearly constant load operate at higher water temperature and must keep running through equipment failure and maintenance those difference change many design decision this guide cover the main one how a data center plant differ from a comfort plant factor comfort cooling plant data center plant load profile vary with weather and occupancy near constant driven by it load operating hour seasonal occupied hour 24 7 365 chilled water supply often 6 to 7 c 43 to 45 f often 12 to 20 c 54 to 68 f or warmer latent load significant small mostly sensible winter cooling low full load so economizer potential is large redundancy n or modest n 1 2n or concurrently maintainable failure consequence discomfort it outage water temperature because data center load are almost entirely sensible chilled water doe not need to be cold enough to dehumidify supply temperature in the mid teen c are common with crah unit and warmer still with close coupled cooling or liquid cooling higher temperature bring three benefit chiller operate at lower lift and higher efficiency waterside economizer carry more hour of the year coil run dry avoiding condensate and unintended dehumidification design delta t matter as well a wider delta t often 8 to 12 k in modern design reduce flow and pump energy and let pipe be smaller achieving it require coil and control designed for it and attention to low delta t syndrome chiller selection water cooled centrifugal chiller including magnetic bearing variable speed machine are common in large plant because of their efficiency at the low lift data center plant enjoy air cooled screw or scroll chiller with integral free cooling coil are common in smaller or water co"},{"k":"Guide","u":"/guides/commissioning-data-center-cooling-systems/","t":"Commissioning data center cooling systems","s":"A walkthrough of the commissioning process for data center cooling, including what happens at each level, which tests matter most and how to avoid common gaps.","nh":"data center cooling and hvac design the commissioning framework the five level level 1 factory acceptance level 2 installation verification level 3 startup and pre functional level 4 functional performance testing level 5 integrated system testing load testing what to measure during testing common gap turnover and training frequently asked question who should perform data center commissioning how long doe it take key takeaway","nb":"a data center cooling system has one job that cannot fail keep it equipment within its temperature limit through every load condition failure and maintenance event the facility was designed for commissioning is how owner find out before production equipment goe live whether the system will actually do that data center commissioning is more rigorous than typical building commissioning it test system under real heat load deliberately fail equipment and verify that mechanical electrical and control system work together this guide outline the process and the test that matter most the commissioning framework data center commissioning follow the general process described in ashrae guideline 0 and ashrae standard 202 adapted for mission critical facility it begin at the start of design not at the end of construction see the commissioning process from opr to turnover for the general framework key document include owner project requirement opr availability target redundancy temperature and humidity envelope efficiency goal operational expectation basis of design bod how the design meet the opr commissioning plan scope role schedule test level and procedure test script step by step procedure with acceptance criteria issue log deficiency and their resolution the five level the data center industry commonly organize commissioning into five level each building on the previous one terminology vary among owner and commissioning provider but the sequence is widely used level name what happen level 1 factory acceptance witness testing of major equipment chiller crah cdus switchgear ups at the factory level 2 site acceptance and installation verification inspect delivered equipment for damage verify installation against drawing and specification level 3 startup and pre functional check manufacturer startup point to point control checkout pressure testing flushing initial balancing level 4 functional performance testing test each system through all mode and sequence including failure "},{"k":"Guide","u":"/guides/continuous-cooling-and-thermal-ride-through/","t":"Continuous cooling and thermal ride-through","s":"Learn why IT rooms can overheat in the seconds and minutes after a power failure, and the design strategies that keep cooling continuous until the plant recovers.","nh":"data center cooling and hvac design the timeline of a power failure how fast doe the room heat up design strategy 1 put fan and pump on ups power 2 use the thermal mass of the chilled water system 3 add chilled water thermal storage 4 chiller rapid restart 5 dx and in row system 6 liquid cooled it setting the acceptance criteria analysis tool testing ride through frequently asked question is ride through only a concern for large data center doe a larger ups solve the problem key takeaway","nb":"when utility power fail in a data center the ups carry the it load instantly and the generator start the server never notice the cooling system however usually doe chiller compressor and many fan are not on ups power so they stop until the generator come online and then many of them take minute to restart and return to full capacity during that gap the it equipment keep producing heat whether the room stay within safe temperature depend on how much heat it is producing how much thermal mass is available and what part of the cooling system keep running this is called thermal ride through and for high density facility it can be the limiting factor in the whole design the timeline of a power failure a typical sequence for a facility with standby generator look like this stage typical duration cooling status utility failure ups pick up it load instant non ups cooling equipment stop generator start and transfer around 10 second for nfpa 110 level 1 type 10 system can be longer all non ups cooling stopped sequenced reloading of mechanical load second to a minute or more fan and pump restart in step chiller or compressor restart often several minute depending on equipment and control cooling capacity rising return to full cooling capacity several minute to longer room temperature recovering generator start time are well defined chiller restart time is the bigger unknown a conventional centrifugal chiller may need several minute to complete its restart sequence and reach full load after a power interruption many manufacturer offer rapid restart option that reduce this considerably the actual time must be confirmed with the equipment supplier and verified in testing a return of utility power bring a second transfer so the sequence can repeat design should consider back to back interruption as well how fast doe the room heat up without cooling the temperature rise in an it room depend on load density and the thermal mass of the air the equipment and the building structure air"},{"k":"Guide","u":"/guides/coolant-distribution-units-cdus-and-liquid-cooling-loops/","t":"Coolant distribution units (CDUs) and liquid cooling loops","s":"Explains how coolant distribution units connect IT liquid cooling to the facility water system, and what to consider when selecting, installing and commissioning them.","nh":"data center cooling and hvac design the two loop what a cdu contain type of cdu sizing and selection capacity approach temperature flow and pressure fluid redundancy control installation essential flushing filling and water quality commissioning frequently asked question why not connect server directly to the facility chilled water how many rack can one cdu serve key takeaway","nb":"when a data center adopt liquid cooling a new piece of equipment become central to the design the coolant distribution unit or cdu the cdu sit between the it equipment liquid loop and the building facility water system it control the temperature pressure flow and cleanliness of the coolant that reache server while keeping the large less pristine facility loop separate from delicate cold plate understanding what a cdu doe and how to select and commission it is essential for anyone planning direct to chip liquid cooling or rear door heat exchanger on a secondary loop the two loop ashrae describe liquid cooling in term of two loop facility water system fws the building side loop from the cdu to the heat rejection plant chiller dry cooler cooling tower or a waterside economizer technology cooling system tcs the it side loop from the cdu through rack manifold to the cold plate or other liquid cooled component the cdus heat exchanger transfer heat from the tcs to the fws without mixing the two fluid what a cdu contain heat exchanger typically a brazed or gasketed plate heat exchanger pump usually redundant variable speed control valve on the facility side modulating to hold tcs supply temperature filtration fine filter on the tcs side to protect cold plate microchannel expansion tank and fill system to manage pressure and make up fluid sensor temperature pressure flow and often fluid quality conductivity ph leak detection in the cdu drip tray and sometime along connected piping controller with local display and communication modbus bacnet snmp or redfish depending on the product type of cdu type heat rejection typical use liquid to liquid in row facility water row level distribution to several rack liquid to liquid in rack facility water single rack deployment retrofit liquid to liquid centralized facility water large hall serve many row via secondary header liquid to air sidecar room air via coil and fan liquid cooled rack in room without facility water liquid to air cdu"},{"k":"Guide","u":"/guides/cooling-high-density-racks-and-ai-workloads/","t":"Cooling high-density racks and AI workloads","s":"A practical guide to the cooling options for high-density and AI racks, from air with containment to liquid cooling, and the facility decisions owners need to make early.","nh":"data center cooling and hvac design why density change everything matching technology to density the hybrid reality facility decision to make early supply temperature power and cooling go together structural loading transient behaviour water and leak management planning procedure energy and efficiency frequently asked question can i put ai rack in my existing room do i need chiller for ai cooling how much redundancy is needed key takeaway","nb":"for many year enterprise data center were designed around rack of roughly 3 to 8 kw air cooling from perimeter unit handled that comfortably training and inference cluster built on gpus and other accelerator have changed the picture a single rack of current accelerator hardware can draw ten of kilowatt and the largest liquid cooled design exceed 100 kw per rack at these density the question shift from how much cooling capacity do we have to how do we get heat out of each rack at all this guide walk through what change which technology match which density range and the decision that must be made before equipment arrive why density change everything air cooled server need a certain volume of air per kilowatt set by the temperature rise across the server at a typical rise of about 10 to 15 k each kilowatt need roughly 200 to 300 m h about 120 to 180 cfm of air a 40 kw rack therefore need several thousand cubic metre per hour delivered to one cabinet face and exhausted from the back without recirculating getting that air through perforated tile around cable bundle and into the right rack become impractical liquid has a far higher volumetric heat capacity than air a small water flow at the rack doe the work of a very large airflow that is why liquid cooling become necessary as density rise matching technology to density the density band below are indicative actual limit depend on room design containment quality server airflow and supply temperature rack density typical cooling approach up to about 10 kw room air cooling with good airflow management and containment about 10 to 20 kw contained aisle in row cooler or close coupled air cooling about 20 to 40 kw rear door heat exchanger in row cooling with containment or partial liquid cooling about 40 kw and above direct to chip liquid cooling with residual air cooling very high uniform load direct to chip or immersion cooling for the technology in more depth see in row and rear door heat exchanger cooling direct to chip liq"},{"k":"Guide","u":"/guides/data-center-cooling-controls-and-dcim-integration/","t":"Data center cooling controls and DCIM integration","s":"Explains the control strategies used in data center cooling, the role of building automation and DCIM systems, and how to integrate them reliably and securely.","nh":"data center cooling and hvac design control strategy that matter control on rack inlet temperature separate airflow and temperature control coordinated control across unit plant optimization liquid cooling control sensor the system involved communication protocol integration step alarm cybersecurity verifying control frequently asked question should dcim control the cooling how many rack inlet sensor do i need key takeaway","nb":"the cooling equipment in a data center is only as good as the control that run it well designed control keep rack inlet within limit use free cooling whenever possible respond to failure automatically and give operator a clear picture of what is happening poor control cause unit to fight waste energy mask failure and generate flood of meaningless alarm data center usually have several overlapping monitoring and control system a building automation system bas an electrical power monitoring system epm equipment level controller and a data center infrastructure management dcim platform this guide explain how cooling control should work and how these system fit together control strategy that matter control on rack inlet temperature older system controlled each cooling unit on its own return air temperature that approach keep the return air at setpoint but say nothing about what server actually receive modern practice control supply air temperature at the cooling unit and use rack inlet temperature sensor to confirm condition or to reset setpoint the ashrae tc 9 9 recommended range of 18 to 27 c 64 to 81 f apply at server inlet so that is where it should be measured separate airflow and temperature control airflow and temperature are two different job fan speed should track it airflow demand often by maintaining a small positive differential pressure between cold aisle and hot aisle in contained room or a set underfloor pressure in raised floor room cooling coil valve or compressor should control supply air temperature combining both into a single return temperature loop cause poor performance coordinated control across unit distributed cooling unit should operate as a team strategy include a shared supply temperature setpoint fan speed controlled together from common pressure measurement and humidity control centralized rather than on every unit this prevent one unit from humidifying while its neighbour dehumidify or one unit running at full speed while the next idle pl"},{"k":"Guide","u":"/guides/data-center-cooling-design/","t":"Data center cooling design: an overview","s":"A map of the main decisions in data center cooling design, including environmental targets, air and liquid cooling options, heat rejection, redundancy and efficiency metrics, with links to deeper guides on each topic.","nh":"data center cooling and hvac design how data center cooling differ from comfort cooling start with the environmental envelope define the load air cooling airflow management cooling unit raised floor or slab liquid cooling heat rejection and central plant redundancy and resilience efficiency metric design and commissioning process key takeaway","nb":"data center turn nearly all of the electricity they use into heat every kilowatt delivered to it equipment must be removed continuously 24 hour a day with no interruption cooling is therefore one of the largest energy user in a data center after the it load itself and one of the system most critical to uptime data center cooling design differ from comfort cooling in almost every respect the load are dense sensible and constant the tolerance for failure is very low and the equipment being protected has its own published environmental limit this overview walk through the main design decision and point to more detailed guide on each how data center cooling differ from comfort cooling factor comfort cooling data center cooling load density ten of watt per square metre often kilowatt per rack and rising sharply with ai workload load profile vary with weather and occupancy nearly constant year round latent load significant from people and ventilation very small almost entirely sensible operating hour occupied hour 8 760 hour per year failure tolerance discomfort equipment shutdown or damage within minute environmental target ashrae 55 comfort ashrae tc 9 9 equipment guideline this is why office grade comfort equipment is rarely suitable for server room start with the environmental envelope ashrae technical committee 9 9 publishe thermal guideline for data processing environment which define recommended and allowable range of temperature and humidity at the server inlet the widely used recommended range for most equipment is 18 to 27 c 64 4 to 80 6 f inlet temperature designing to the upper end of the recommended range rather than cooling the room to office temperature allow warmer supply air and chilled water more economizer hour and lower energy use see ashrae tc 9 9 thermal guideline define the load cooling design start with the it load and its expected growth total it capacity in kilowatt or megawatt and how it will be phased rack density average and maximum kilowatt p"},{"k":"Guide","u":"/guides/data-center-cooling-redundancy-n-1-2n-and-uptime-tiers/","t":"Data center cooling redundancy: N+1, 2N and Uptime tiers","s":"A plain explanation of cooling redundancy terms, how they map to Uptime Institute tiers, and the design details that determine whether redundancy actually works.","nh":"data center cooling and hvac design the vocabulary component redundancy vs path redundancy uptime institute tier how n 1 can fail running redundant equipment continuous cooling choosing the right level verifying redundancy frequently asked question is 2n alway better than n 1 doe redundancy apply to control key takeaway","nb":"every data center owner eventually ask how much cooling redundancy they need the answer shape the cost of the plant the piping the control and the electrical supply too little redundancy risk outage during failure or maintenance too much tie up capital in equipment that may never run and can even reduce efficiency if spare unit are operated poorly this guide explain the common term how they relate to the uptime institute tier classification and tia 942 rating and the practical detail that make redundancy real rather than theoretical the vocabulary n is the amount of capacity needed to carry the design load if the data hall need 1 000 kw of cooling and each unit provide 250 kw n is four unit configuration meaning example with 250 kw unit and 1 000 kw load n exactly enough capacity 4 unit n 1 one spare unit 5 unit n 2 two spare unit 6 unit 2n two complete independent system 8 unit in two separate system of 4 2 n 1 two independent system each with a spare 10 unit in two system of 5 redundancy apply to each component type chiller pump cooling tower crah unit cdus control and the electrical supply feeding them a plant with n 1 chiller but a single pump header has a single point of failure component redundancy vs path redundancy spare equipment is only half the story water refrigerant and power must reach the load by more than one route a plant with spare chiller but one supply pipe can still lose cooling when that pipe need repair component redundancy spare chiller pump crah and so on distribution path redundancy two or more piping and electrical path so one can be shut down while the other carry the load uptime institute tier the uptime institute tier standard define four level based on the facility ability to tolerate maintenance and failure uptime certification is a formal process with design construction and operational review using tier language informally doe not mean a facility is certified tier name core cooling requirement tier i basic capacity capacity for the "},{"k":"Guide","u":"/guides/data-center-heat-reuse-and-district-heating/","t":"Data center heat reuse and district heating","s":"Explains where data center waste heat comes from, how it can be upgraded and delivered to buildings or district systems, and what makes heat reuse projects succeed or stall.","nh":"data center cooling and hvac design where the heat is and how warm it is upgrading heat with heat pump connecting to district energy measuring reuse erf practical barrier mismatched timing distance reliability and responsibility commercial structure economic design consideration for heat ready data center frequently asked question doe heat reuse lower my pue is heat reuse practical for a small server room is there a regulatory requirement for heat reuse in canada key takeaway","nb":"nearly every kilowatt hour a data center consume end up as heat in a conventional facility that heat is rejected to the atmosphere through cooling tower dry cooler or condenser in a country where building need heating for much of the year throwing that energy away is an obvious missed opportunity heat reuse capture data center waste heat and deliver it to something useful the data center own office a neighbouring building domestic hot water greenhouse or a district energy network the concept is simple the engineering economic and contract are where project succeed or fail where the heat is and how warm it is the value of waste heat depend heavily on its temperature higher temperature are easier and cheaper to use heat source typical temperature range usefulness air cooled hot aisle return about 30 to 45 c 86 to 113 f low grade need heat pump for most use chilled water return from crah unit about 18 to 30 c 64 to 86 f low grade heat pump required condenser water from chiller about 30 to 40 c 86 to 104 f low grade heat pump or heat recovery chiller direct to chip liquid cooling return often about 40 to 50 c 104 to 122 f or more depending on class medium grade low temperature heating directly heat pump for higher immersion cooling return similar to or above direct to chip medium grade range vary with design the general rule is that liquid cooling produce warmer more concentrated heat than air cooling which is why heat reuse and liquid cooling are often discussed together see direct to chip liquid cooling upgrading heat with heat pump most building heating system need water at higher temperature than air cooled data center produce older hydronic system may need 70 to 80 c 158 to 176 f supply on cold day while newer low temperature system may run at 40 to 55 c 104 to 131 f district network vary from ambient temperature loop to high temperature hot water system heat pump bridge the gap a water to water heat pump or heat recovery chiller take heat from data center water an"},{"k":"Guide","u":"/guides/data-center-site-selection-and-climate/","t":"Data center site selection and climate","s":"Learn which climate and site factors affect data centre cooling energy, water use and resilience, and how to evaluate a Canadian site from an HVAC perspective.","nh":"data center cooling and hvac design climate data that matter dry bulb and wet bulb hour design extreme regional character altitude outdoor air quality water availability cold climate challenge natural hazard power carbon and heat reuse a site evaluation checklist key takeaway","nb":"site selection for a data center usually start with power fibre and land cost climate and the local environment come next and they shape the cooling design more than any other factor two identical building in vancouver and toronto will have different cooling plant different energy use and different risk canada has a reputation as a good place to cool data center and for much of the year that is true but the detail matter summer wet bulb peak wildfire smoke very dry winter air and altitude all affect design this guide explain how an hvac engineer evaluate a site climate data that matter dry bulb and wet bulb hour the number of hour each year below certain dry bulb and wet bulb temperature determine how much cooling can come from outdoor air or cooling tower without running compressor air side economizer depend mainly on dry bulb temperature and dew point waterside economizer and evaporative system depend on wet bulb temperature hourly weather file for example the canadian weather year for energy calculation file used in energy modelling let engineer count these hour for a site and the chosen supply temperature the higher the supply air or water temperature the it equipment allow the more hour qualify the guide to free cooling and economizer for data center in canada show how this work design extreme peak capacity must be sized for extreme condition not average data center designer often go beyond the 1 percent or 0 4 percent design value used for comfort cooling using extreme annual or even record condition so that cooling doe not fail on the hottest day the nbc climatic data and ashrae handbook design data are the starting point climate is also shifting many owner now test design against projected future condition over the facility life particularly for wet bulb peak that drive cooling tower and evaporative performance regional character region cooling consideration bc lower mainland mild humid long economizer season moderate wet bulb seismic design is a major facto"},{"k":"Guide","u":"/guides/direct-to-chip-liquid-cooling/","t":"Direct-to-chip liquid cooling","s":"An overview of cold plate liquid cooling for processors and accelerators, covering how the loops are arranged, which temperatures to design for, and the practical issues of bringing liquid to the rack.","nh":"data center cooling and hvac design how cold plate cooling work partial heat capture ashrae liquid cooling classe coolant and material facility design consideration piping and distribution temperature and delta t leak detection and containment redundancy planning step for owner frequently asked question can direct to chip cooling be added to an existing air cooled data center is direct to chip better than immersion cooling what happen if the facility water fail key takeaway","nb":"direct to chip liquid cooling also called cold plate cooling or direct liquid cooling dlc remove heat from processor and accelerator by pumping liquid through a metal plate mounted directly on the chip water carry heat far more effectively than air so a cold plate can handle chip power level that would require impractical airflow and heat sink size it has moved from high performance computing niche into mainstream deployment because modern gpus and cpus dissipate several hundred watt to over a kilowatt each for owner and engineer the shift mean the data center now need a liquid distribution system that reache every rack in addition to air cooling for the remaining component how cold plate cooling work a cold plate is a copper or aluminium block with internal microchannel or fin it sit on the processor lid with a thermal interface material between them coolant enter the plate absorb heat and leave warmer within the server tubing connect multiple cold plate in sery or parallel terminating at quick disconnect coupling at the back of the chassis from the server coolant flow to rack manifold then to a coolant distribution unit cdu the cdu contain a heat exchanger pump filtration and control it transfer heat from the server loop to the facility water system ashrae terminology describe two loop technology cooling system tcs the secondary loop between the cdu and the it equipment it is clean filtered low volume and often use treated water or a propylene glycol mixture facility water system fws the primary loop between the cdu and the heat rejection plant such as chiller dry cooler or cooling tower partial heat capture cold plate usually cover processor accelerator and sometime memory and voltage regulator power supply drive network card and other component remain air cooled depending on server design cold plate typically capture somewhere around 70 to 90 percent of server heat the rest must still be removed by room air handling rear door heat exchanger or in row cooler desi"},{"k":"Guide","u":"/guides/edge-and-modular-data-center-cooling/","t":"Edge and modular data center cooling","s":"Covers how small, distributed and prefabricated data centers are cooled, the challenges of unattended and harsh-climate sites, and how to choose and verify cooling for them.","nh":"data center cooling and hvac design what make edge and modular cooling different common cooling approache dx cooling free cooling liquid and immersion cooling comparing option for small site canadian climate challenge extreme cold snow and ice heat and smoke altitude redundancy at small scale monitoring and control factory testing and site commissioning maintenance planning frequently asked question can i use a comfort air conditioner for an edge site do modular data center need a building permit key takeaway","nb":"not every data center is a large purpose built facility edge data center bring computing closer to user and device in cell site retail store factory hospital oil and gas site and municipal facility modular data center are prefabricated in a factory and delivered as container skid or enclosure both share common trait limited space often no on site staff sometime harsh environment and a need for reliable cooling with little attention this guide look at the cooling option for these facility and the issue that come up especially in canada what make edge and modular cooling different small and dense a few rack may carry significant load with little room for air distribution unattended problem must be detected and handled remotely and maintenance visit are infrequent varied environment equipment may sit in a parking lot in winnipeg on a remote resource site or in a dusty factory fast deployment factory built system arrive tested and need quick site connection limited infrastructure no central chilled water plant limited water supply sometime constrained power common cooling approache dx cooling direct expansion system are the most common choice for edge and modular site because they are self contained and need no water plant option include wall mounted or package unit on container split system with indoor evaporator and outdoor condenser in row dx cooler within the module rack mounted or enclosure mounted cooling unit for micro data center for canadian site specify low ambient control such as head pressure control crankcase heater and condenser fan speed control so unit run reliably in extreme cold refrigerant charge and room volume must comply with csa b52 limit free cooling because edge site often operate year round in cold climate economizer make sense airside economizer on container bring in filtered outdoor air when condition allow but need careful filtration mixing and humidity control in cold weather and at dusty site pumped refrigerant economizer on dx unit bypass"},{"k":"Guide","u":"/guides/evaporative-and-adiabatic-cooling-for-data-centers/","t":"Evaporative and adiabatic cooling for data centers","s":"Covers the evaporative cooling technologies used in data centers, how they save energy, what they cost in water and maintenance, and how they behave in Canadian weather.","nh":"data center cooling and hvac design the physic in brief direct evaporative cooling indirect evaporative cooling adiabatic precooling on dry cooler and condenser comparison water use and wue water treatment and legionella canadian climate consideration winter summer wildfire smoke design checklist frequently asked question is evaporative cooling worth it in canada can i avoid water use entirely key takeaway","nb":"evaporating water absorb a large amount of heat evaporative and adiabatic cooling system use this effect to cool air or water toward the outdoor wet bulb temperature which is often well below the dry bulb in data center this extend free cooling hour and reduce or eliminate compressor operation but it also consume water and introduce water treatment and microbial control obligation this guide explain the three main approache where they fit in canada and how to weigh energy saving against water use the physic in brief when water evaporate into an airstream the air dry bulb temperature drop while its moisture content rise the process is close to adiabatic meaning the total energy of the air stay roughly constant the lowest temperature achievable is the wet bulb temperature real equipment get part of the way there the fraction is called saturation or wet bulb effectiveness commonly in the range of about 70 to 90 percent for well designed media the drier the air the bigger the gap between dry bulb and wet bulb and the more cooling evaporation provide that is why evaporative cooling is especially effective in dry climate such as the southern prairy and the bc interior direct evaporative cooling outdoor air passe through wetted media or a fine mist and is supplied directly to the data hall this lower supply temperature but also raise humidity which must stay within the ashrae tc 9 9 envelope direct evaporative cooling is usually combined with a direct airside economizer very energy efficient add moisture to the data hall outdoor contaminant enter with the air so filtration is important require careful control to avoid exceeding humidity limit indirect evaporative cooling evaporation happen on the outdoor scavenger side of an air to air heat exchanger data hall air is cooled through the heat exchanger without gaining moisture or contaminant indirect evaporative unit are packaged air handler that often include dx or chilled water trim coil for the hottest most humid hour dat"},{"k":"Guide","u":"/guides/fire-suppression-interactions-with-data-center-hvac/","t":"Fire suppression interactions with data center HVAC","s":"Learn how fire suppression and cooling systems must be coordinated in a data centre so that suppression works, cooling is not lost unnecessarily and the integrated sequence is proven by testing.","nh":"data center cooling and hvac design suppression system used in data center detection and sequencing should the cooling keep running air side economizer room integrity pressure relief lithium ion battery post discharge ventilation integrated testing key takeaway","nb":"fire protection in a data center has to do two thing that can work against each other it must detect and extinguish a fire quickly and it must avoid unnecessary shutdown of it equipment and the cooling that keep that equipment alive hvac sit in the middle air movement can dilute or remove a gaseous agent open damper can let it leak away and an automatic hvac shutdown can cause the it room to overheat even if no fire occur getting these interaction right take coordination between the fire protection engineer the mechanical engineer the electrical engineer and the owner from early design through commissioning this guide explain the main issue suppression system used in data center system how it work hvac implication wet pipe sprinkler water discharge from head that open individually minimal direct hvac interaction water damage risk pre action sprinkler pipe dry until detection open a valve head must also open common in data hall often paired with early detection clean agent halocarbon agent such as hfc 227ea or fk 5 1 12 extinguish mainly by absorbing heat agent must be held at concentration room sealing and hvac control critical inert gas mixture such as ig 541 ig 55 or ig 100 reduce oxygen to a level that will not support combustion large gas volume require pressure relief venting room sealing critical water mist fine droplet cool and displace oxygen locally less common hvac interaction depend on system design the governing standard most often referenced are nfpa 75 protection of it equipment nfpa 76 telecommunication facility nfpa 2001 clean agent system and nfpa 13 sprinkler in canada the national building code and provincial code set sprinkler requirement for the building fire alarm system are installed to can ulc s524 and the authority having jurisdiction may require specific standard owner and insurer also often have their own requirement the halocarbon agent landscape is changing fk 5 1 12 was long sold mainly as 3m novec 1230 and 3m has exited production as p"},{"k":"Guide","u":"/guides/free-cooling-and-economizers-for-data-centers-in-canada/","t":"Free cooling and economizers for data centers in Canada","s":"Explains the main economizer options for data centers, how Canadian climates affect each one, and the design details that decide whether free cooling actually delivers.","nh":"data center cooling and hvac design what count as free cooling economizer type direct airside economizer indirect airside economizer waterside economizer dry cooler and pumped refrigerant economizer comparing option canadian climate consideration freeze protection and cold weather detail control code and standard context frequently asked question is direct outside air safe for server how many hour of free cooling can i expect key takeaway","nb":"canada is one of the best place in the world to cool a data center without compressor long cold winter and cool shoulder season mean outdoor air or outdoor cooled water can remove server heat for much of the year economizer the equipment and control that make this possible are the single biggest lever on cooling energy in most canadian facility the cold also bring challenge that warmer region do not face freezing coil very dry winter air snow and ice at intake and wildfire smoke in summer this guide cover the main economizer type how they suit different canadian climate and the detail that make them work what count as free cooling free cooling mean rejecting heat without running refrigeration compressor or while running them at reduced lift the fan and pump still use energy so it is not literally free but the saving over mechanical cooling are large economizer can operate in three mode full economizer outdoor condition handle the entire load partial or integrated economizer outdoor condition handle part of the load and chiller or dx trim the rest mechanical cooling outdoor condition are too warm or humid to help the warmer the supply temperature the data center accept the more hour fall into the first two mode raising server inlet setpoint toward the upper end of the ashrae tc 9 9 recommended range of 18 to 27 c 64 to 81 f is therefore the first step in any economizer strategy economizer type direct airside economizer outdoor air is filtered and supplied directly to the data hall with hot exhaust air relieved outdoor or mixed back to temper the supply this is the most efficient option in cool climate but it expose it equipment to outdoor contaminant and humidity swing in canada direct airside system need mixing with return air to keep supply temperature above the minimum and avoid thermal shock during very cold weather humidity management since cold outdoor air heated to supply temperature become very dry high efficiency filtration typically merv 13 or better with p"},{"k":"Guide","u":"/guides/hot-aisle-and-cold-aisle-containment/","t":"Hot aisle and cold aisle containment","s":"Learn why separating hot and cold air is the foundation of efficient data center cooling, how hot aisle and cold aisle containment compare, and the design, fire protection and control details that make containment work.","nh":"data center cooling and hvac design the problem containment solve cold aisle containment hot aisle containment comparison containment only work if leakage is controlled fire protection controlling cooling after containment verifying performance frequently asked question which is better hot or cold aisle containment can containment be added to a live data center doe containment help small server room key takeaway","nb":"server draw cool air in at the front and exhaust hot air at the back when rack are arranged face to face and back to back they form alternating cold aisle where cooling air is supplied and hot aisle where exhaust collect that layout is the starting point containment goe further by physically enclosing either the cold aisle or the hot aisle so that the two airstream cannot mix without containment a significant share of cooling air bypasse the server and return to the cooling unit unused while hot exhaust recirculate over the top and end of row into server inlet operator compensate by lowering supply temperature and moving more air than the it equipment need containment remove that waste and allow higher supply temperature lower fan speed and more free cooling the problem containment solve recirculation hot exhaust air drawn back into server inlet creating hot spot usually at the top of rack and the end of row bypass cold supply air that return to cooling unit without passing through it equipment lowering return temperature and cooling unit efficiency stratification wide temperature difference from the bottom to the top of rack overcooling room run colder than necessary to protect the worst rack cold aisle containment cold aisle containment cac enclose the cold aisle with door at the row end and a roof or ceiling panel over the aisle cool air is delivered into the enclosed aisle typically through perforated floor tile from a raised floor or from overhead duct the rest of the room become the hot return space advantage often simpler to retrofit into existing raised floor room smaller volume of conditioned air to control can be implemented one row at a time disadvantage the open room run hot often well above 30 c 86 f which affect staff comfort and any equipment outside the containment such as wall mounted panel or tape library less thermal mass of cool air if cooling fail so inlet temperature can rise quickly hot aisle containment hot aisle containment hac enclose the h"},{"k":"Guide","u":"/guides/humidity-control-and-static-electricity-in-data-centers/","t":"Humidity control and static electricity in data centers","s":"Explains how much humidity control a data center really needs, how electrostatic discharge and corrosion risks are managed, and how to avoid wasting energy on humidifiers and dehumidifiers.","nh":"data center cooling and hvac design current ashrae guidance static electricity high humidity and corrosion humidity challenge in canada winter summer efficient control strategy sensor and monitoring frequently asked question do i need humidifier at all what about tape library and older equipment key takeaway","nb":"older data center were often designed to hold relative humidity in a narrow band commonly around 45 to 50 percent low humidity was feared because of static electricity and high humidity because of condensation and corrosion holding that band especially in a canadian winter take a lot of energy humidifier run for month and cooling unit sometime dehumidify and reheat at the same time industry guidance has changed ashrae tc 9 9 now recommend a much wider humidity range for it equipment based on research and field experience this guide explain the current guidance the real risk and how to control humidity efficiently current ashrae guidance ashrae tc 9 9s thermal guideline define a recommended envelope and several allowable classe for it equipment for most equipment class a1 to a4 the recommended envelope is dry bulb temperature from 18 to 27 c 64 to 81 f dew point from 9 c 16 f up to 15 c 59 f relative humidity no higher than 70 percent in the current fifth edition provided gaseous contamination is low earlier edition used 60 percent and ashrae advise a lower limit around 50 percent where corrosive gase are present the guidance specify humidity in term of dew point at the low end because absolute moisture content is what matter for static and condensation and because dew point doe not change as air is heated or cooled along its path through the room the allowable classe extend further and the latest edition add guidance on gaseous contamination and a high density class with a narrower range see ashrae tc 9 9 thermal guideline alway check the specific requirement of your it vendor and any equipment such as tape library which may need tighter limit static electricity electrostatic discharge esd can damage sensitive component when a charged person or object touche equipment low humidity make it easier for charge to build up on people and material ashrae sponsored research into esd in data center found that the risk at low humidity is controlled mainly by grounding practic"},{"k":"Guide","u":"/guides/immersion-cooling-single-phase-and-two-phase/","t":"Immersion cooling: single-phase and two-phase","s":"Explains how servers are cooled by submerging them in dielectric fluid, the differences between single-phase and two-phase systems, and what a building needs to support them.","nh":"data center cooling and hvac design single phase immersion characteristic two phase immersion characteristic pfa and fluid availability comparison facility implication floor loading and layout facility water room environment fire protection and life safety operational consideration heat reuse frequently asked question doe immersion cooling eliminate the need for chiller is immersion suitable for an existing data center key takeaway","nb":"immersion cooling submerge server in a non conductive dielectric liquid every component including processor memory power supply and drive transfer heat directly into the fluid server fan are removed the room no longer need to deliver cold air to the it equipment and nearly all the heat is captured in liquid there are two family in single phase immersion the fluid stay liquid and is pumped through a heat exchanger in two phase immersion the fluid boil at the hot surface and condense on a coil above the bath both can handle very high rack equivalent density but they differ greatly in fluid cost containment regulatory exposure and operational practice single phase immersion server are placed vertically in an open top tank sometime called a bath or tub filled with a hydrocarbon based dielectric fluid common fluid type include synthetic hydrocarbon polyalphaolefin pao refined mineral oil and some engineered ester fluid is circulated either by pump through an external heat exchanger or by a pump and heat exchanger integrated in the tank heat passe to a facility water loop which reject it through dry cooler cooling tower or chiller characteristic fluid remain liquid so loss to the atmosphere is low fluid are typically viscous compared with water so flow distribution through server must be designed carefully fluid are combustible with relatively high flash point fire code review by the authority having jurisdiction is needed hardware must be compatible some cable label thermal paste and plastic degrade or leach in certain fluid two phase immersion server sit in a sealed tank of engineered fluid with a low boiling point often in the range of about 50 to 60 c 122 to 140 f heat from chip cause the fluid to boil at their surface vapour rise to a condenser coil near the top of the tank which is cooled by facility water condensed liquid drip back into the bath boiling is a highly effective heat transfer mechanism so two phase system can manage very high component power with littl"},{"k":"Guide","u":"/guides/in-row-and-rear-door-heat-exchanger-cooling/","t":"In-row and rear-door heat exchanger cooling","s":"Learn how close-coupled cooling with in-row units and rear-door heat exchangers removes heat near the rack, and how to decide which one suits your room.","nh":"data center cooling and hvac design why close coupled cooling exist in row cooler where in row unit work well limitation rear door heat exchanger passive and active door where rdhx work well comparing the option water temperature and the fluid loop design checklist commissioning and verification frequently asked question can i add rear door to an existing room without shutting it down do in row cooler need hot aisle containment is water at the rack a serious risk key takeaway","nb":"traditional data center cooling pushe cold air from perimeter unit across a room and hope it reache the server inlet before it mixe with hot exhaust that work at modest density but as rack load climb the distance between the heat source and the cooling coil become the problem close coupled cooling shorten that distance by putting the coil right beside or right behind the rack the two most common close coupled approache are in row cooler and rear door heat exchanger rdhx both use chilled water or refrigerant to absorb heat within a metre or so of the it equipment they solve different problem and choosing between them depend on rack density room layout water availability and how much the owner want to disturb an existing white space why close coupled cooling exist room level cooling move large volume of air over long path along the way cold supply air bypasse the server and hot exhaust recirculate to the inlet operator compensate by lowering supply temperature and oversupplying air which waste fan and chiller energy containment fixe much of this but at higher density the airflow a perimeter unit must deliver and the static pressure under a raised floor become limiting close coupled system capture heat at the source the air path is short so fan energy drop mixing is reduced and the coil see warmer return air which improve coil effectiveness and allow warmer chilled water in row cooler an in row cooler is a cabinet sized unit typically 300 mm 12 in or 600 mm 24 in wide placed in the row between it rack it draw hot air from the hot aisle passe it through a coil and discharge cooled air into the cold aisle variable speed ec fan adjust airflow to match load usually controlled on rack inlet temperature or on differential pressure across a contained aisle where in row unit work well slab floor room with no raised floor plenum row of 10 to 30 kw rack especially with hot aisle containment mixed density room where a few row need more capacity than the perimeter system can deliv"},{"k":"Guide","u":"/guides/load-bank-testing-for-cooling-validation/","t":"Load bank testing for cooling validation","s":"Explains how temporary heat loads are used to prove data center cooling capacity, controls and failure response before IT equipment is installed.","nh":"data center cooling and hvac design why use load bank type of load bank and heat simulator matching airflow not just heat planning the layout test procedure preparation steady state capacity test failure and transient test what result tell you safety canadian consideration frequently asked question can we test with real it equipment instead how long doe load bank testing take key takeaway","nb":"a data center cooling system is designed to remove a specific amount of heat under specific condition with specific response when equipment fail the only way to know whether it doe so before server arrive is to give it heat load bank electrical device that convert power into heat provide that heat in a controlled and measurable way load bank testing is standard practice in data center commissioning done well it reveal capacity shortfall airflow problem control instability and failure response issue while they can still be fixed without risk to production equipment why use load bank capacity verification prove that cooling equipment deliver rated capacity at design condition airflow validation confirm that air reache every rack position and that containment work control tuning tune fan valve and sequence under realistic load rather than at idle failure testing fail cooling unit pump and chiller under load and measure the temperature response electrical testing the same load bank also test ups generator and distribution often in the same campaign type of load bank and heat simulator type how it work best for rack mount load bank fit in rack position draw front to back air like server realistic airflow and containment testing floor standing heater fan portable unit placed in aisle or row room level capacity test large resistive load bank high capacity unit often outdoor or in electrical room generator and ups testing not ideal for cooling distribution liquid heat load simulator heat a liquid loop to mimic cold plate load direct to chip and cdu testing for cooling validation rack mount load bank give the most representative result because they reproduce server airflow path floor standing unit are cheaper and faster to deploy but can create unrealistic air pattern liquid simulator are essential for testing cdus and liquid cooling loop before it hardware arrive matching airflow not just heat server move a certain volume of air per kilowatt a load bank that produce the rig"},{"k":"Guide","u":"/guides/power-usage-effectiveness-pue/","t":"Power usage effectiveness (PUE) and how to improve it","s":"Learn how power usage effectiveness is defined and measured, what it does and does not tell you, and which improvements make the biggest difference.","nh":"data center cooling and hvac design the definition measurement level common mistake what drive pue up how to improve pue airflow management raise supply temperature use free cooling variable speed everywhere optimize the chiller plant relax humidity control electrical efficiency pue in context frequently asked question what is a good pue how often should pue be measured key takeaway","nb":"power usage effectiveness or pue is the most widely used efficiency metric for data center it compare the total energy a facility use with the energy delivered to the it equipment a pue of 1 0 would mean every kilowatt hour goe to computing with nothing spent on cooling power conversion or lighting pue was introduced by the green grid and is now standardized internationally in iso iec 30134 2 it is a useful tool for tracking a single facility performance over time but it is easy to calculate inconsistently and easy to misuse in comparison this guide explain how to measure it properly and how to improve it the definition pue total facility energy it equipment energy both quantity are energy kwh normally measured over a full year using energy rather than instantaneous power matter because cooling energy vary strongly with weather and it load total facility energy include everything serving the data center it equipment cooling plant air handler pump humidifier ups and transformer losse lighting and support space that are part of the data center it equipment energy is the energy consumed by server storage network equipment and other computing device ideally measured at the input to the it equipment the reciprocal of pue it energy divided by total energy is sometime called data center infrastructure efficiency dcie measurement level the green grid and iso iec 30134 2 describe measurement category based on where it energy is metered measuring closer to the it equipment is more accurate because it exclude losse in upstream distribution measurement point for it energy accuracy note ups output basic include pdu and distribution losse as it pdu output intermediate exclude pdu transformer losse it equipment input rack or server advanced most accurate need branch circuit or intelligent rack metering when reporting pue state the measurement point and the period a pue calculated from a single snapshot on a cold day at ups output is not comparable with an annualized figure at the "},{"k":"Guide","u":"/guides/raised-floor-vs-slab-cooling/","t":"Raised floor vs slab cooling","s":"Weighs the advantages and drawbacks of raised access floors and slab floors for data center cooling, and explains which cooling strategies fit each.","nh":"data center cooling and hvac design how raised floor cooling work advantage drawback how slab cooling work advantage drawback side by side comparison density and the raised floor seismic consideration in canada retrofit decision modeling and verification frequently asked question is a raised floor obsolete what floor height do i need key takeaway","nb":"for decade the raised access floor was the default for data center perimeter cooling unit pressurized the space under the floor and perforated tile delivered cold air to the front of rack cable and pipe ran beneath the floor out of sight many modern facility have abandoned the raised floor in favour of slab on grade design with overhead cabling and contained aisle or close coupled and liquid cooling neither approach is universally better the choice depend on rack density cooling technology structural condition operating practice and whether the facility is new or existing how raised floor cooling work a raised floor is a grid of pedestal and removable panel typically set 450 to 900 mm 18 to 36 in above the structural slab in cooling application sometime higher crac or crah unit discharge air into the underfloor plenum creating a modest positive pressure perforated tile or grate in cold aisle release air in front of rack hot exhaust return to the unit through the room or a ceiling plenum advantage flexible air delivery tile can be moved or swapped to follow load space beneath the floor for chilled water piping power and cabling though cabling underfloor is now often discouraged familiar to operator and well understood can be combined with containment for good performance drawback underfloor obstruction cable bundle pipe cable tray cause uneven pressure and airflow air leak through cutout and panel joint causing bypass practical density limit delivering high airflow through tile to a single rack become difficult as rack load rise cost of the floor system and its seismic bracing floor load rating may limit heavy rack immersion tank or liquid cooled cabinet underfloor plenum may need fire detection or suppression depending on the authority having jurisdiction and applicable standard how slab cooling work in a slab design rack sit directly on the concrete floor cooling air is delivered in several way flooded room supply air handler or fan wall supply cold air into the ro"},{"k":"Guide","u":"/guides/retrofitting-legacy-data-centers-for-higher-density/","t":"Retrofitting legacy data centers for higher density","s":"A step-by-step approach to upgrading an older data center for denser equipment, from assessment and quick wins to liquid cooling retrofits carried out while the facility stays live.","nh":"data center cooling and hvac design step 1 assess what you have cooling power structure and space operation step 2 capture quick win step 3 choose a density strategy step 4 select cooling technology close coupled air cooling direct to chip liquid cooling liquid to air cdus as a bridge step 5 plant and distribution step 6 power and structure step 7 phase the work common pitfall frequently asked question should i retrofit or build new can a raised floor room support liquid cooling key takeaway","nb":"many data center in canada were designed for rack of a few kilowatt with perimeter crac or crah unit and a raised floor today the same owner are being asked to host equipment that draw several time as much power per rack including accelerator for ai workload building a new facility is not alway possible or necessary in many case a legacy room can be upgraded to support higher density at least in part retrofitting a live data center is harder than building new work must happen without disrupting operation existing infrastructure constrain choice and limit in power cooling structure and space all interact this guide outline a practical approach step 1 assess what you have start with an honest assessment of the existing facility cooling installed capacity and actual load on each cooling unit redundancy and whether it still hold at current load chilled water plant capacity temperature and spare connection airflow management condition blanking cutout containment rack inlet temperature and hot spot age and condition of equipment power utility service ups and generator capacity distribution to row and rack including pdu and branch circuit capacity space for additional electrical equipment structure and space raised floor load rating and condition structural slab capacity for heavy rack or immersion tank ceiling height and overhead space for piping busway and containment plant room and roof space for added heat rejection operation change window and tolerance for disruption redundancy needed during the work staff skill for new technology such as liquid cooling a cfd model validated with field measurement is a valuable part of this assessment it show where capacity exist and where problem will appear as density rise step 2 capture quick win before adding equipment recover the capacity already installed many legacy room have far more cooling than they use wasted through bypass and recirculation install blanking panel and seal cable cutout remove abandoned cable from the underf"},{"k":"Guide","u":"/guides/server-room-and-telecom-closet-cooling/","t":"Server room and telecom closet cooling","s":"Learn how to estimate the heat load in a small server room or network closet, choose a cooling system that runs year-round, and avoid the failures that cause most overheating calls.","nh":"data center cooling and hvac design start with the real heat load sensible heat ratio what temperature to hold cooling option compared avoid relying on the building system alone portable air conditioner winter operation in canada redundancy and power airflow inside the room monitoring and alarm frequently asked question can i just leave the door open should the room have a fire damper or sprinkler key takeaway","nb":"most organization do not have a data center but almost all of them have a server room a main telecom room or a network closet on every floor these space hold equipment that run 24 hour a day 365 day a year in room that were often designed as storage closet and cooled by whatever building system happened to be nearby the result is familiar to facility manager a closet that overheat on summer weekend a portable air conditioner with a hose taped to the ceiling or a switch that fail every few year this guide explain how to size and select cooling for small it room properly with attention to canadian winter start with the real heat load nearly all the electrical power consumed by it equipment end up as heat in the room the most reliable way to estimate the load is to measure it read the actual power draw from the ups display or smart power distribution unit this is better than nameplate rating which often overstate real consumption by a wide margin add the losse of any ups in the room typically a few percent of the it load for online unit add lighting people if the room is regularly occupied and any heat gain through exterior wall or glazing allow for growth over the life of the cooling equipment based on a realistic it plan rather than a blanket multiplier useful conversion 1 kw of it load is about 3 412 btu h and 1 ton of refrigeration is 3 517 kw 12 000 btu h a closet with two 5 kw rack therefore need roughly 10 kw about 3 ton of sensible cooling before redundancy sensible heat ratio it equipment produce almost entirely sensible heat comfort air conditioner are designed to remove a meaningful share of moisture so their sensible capacity can be noticeably lower than their total rating alway compare equipment on sensible capacity at the expected return air condition the guide on crac unit vs comfort cooling explain this in more detail what temperature to hold the ashrae recommended range for it inlet air is 18 to 27 c 64 to 81 f with broader allowable range depending on"},{"k":"Guide","u":"/guides/water-usage-effectiveness-wue-and-water-free-cooling/","t":"Water usage effectiveness (WUE) and water-free cooling","s":"Explains the water usage effectiveness metric, where data center water goes, and how designs can reduce or eliminate water consumption without giving up efficiency.","nh":"data center cooling and hvac design the definition source wue where data center water goe the energy and water trade off water free cooling option dry cooler air cooled chiller with free cooling coil airside economizer without evaporative stage hybrid and adiabatic system pumped refrigerant economizer reducing water use in existing wet system measuring wue properly frequently asked question what is a good wue doe going water free alway raise pue should wue replace pue doe a closed chilled water loop count toward wue key takeaway","nb":"data center have long been judged on energy but water is now just as visible cooling tower and evaporative system can consume large volume of water and community regulator and customer increasingly ask how much a facility use water usage effectiveness or wue is the metric developed to answer that question this guide explain how wue is calculated where water goe in a data center the trade off between water and energy and the option for water free cooling which are particularly practical in canada climate the definition wue was developed by the green grid and has since been standardized within the iso iec 30134 sery the basic site metric is wue annual site water usage litre annual it equipment energy kwh the result is expressed in litre per kilowatt hour l kwh a lower value mean less water per unit of it energy source wue the green grid also define a source wue which add the water consumed in generating the electricity the data center use this matter because thermal power plant consume water for cooling a site that switche from water cooled to air cooled equipment may lower site wue while raising electricity use and the net effect depend on the grid in province with predominantly hydroelectric generation the water associated with generation is accounted for differently than for thermal plant and the published data on it vary treat source wue as an indicator that depend on assumption and state the assumption used where data center water goe use typical significance cooling tower evaporation usually the largest use in water cooled plant cooling tower blowdown bleed significant depend on cycle of concentration direct or indirect evaporative cooling large in summer where used adiabatic precooling on dry cooler smaller seasonal humidification moderate in cold climate with outdoor air economizer domestic use washroom kitchen small often excluded or reported separately landscape irrigation site dependent usually excluded clearly state what is included in your wue figure some"},{"k":"Guide","u":"/guides/air-change-rates-and-airflow-in-cleanrooms/","t":"Air change rates and airflow in cleanrooms","s":"Learn where typical cleanroom air change rates come from, how to derive airflow from contamination sources and recovery time, and why overdesigning airflow wastes energy.","nh":"cleanroom hvac design two kind of airflow design typical range and where they come from calculating airflow from first principle steady state dilution particle generation a worked example factor beside dilution recovery time heat removal pressurization and exhaust diffuser and return layout unidirectional zone avoid automatic overdesign key takeaway","nb":"air change rate is the most important number in cleanroom hvac design it set the size of the fan air handler ductwork and filter and it drive most of the energy bill it is also one of the least standardized number neither iso 14644 nor eu gmp annex 1 prescribe air change rate for non unidirectional cleanroom so designer rely on industry guidance experience and calculation this guide explain where typical air change rate come from how to calculate airflow more rigorously and what to consider before choosing a number two kind of airflow design cleanroom use two basic airflow approache unidirectional airflow area are designed by velocity air move in parallel stream across the whole area and the airflow rate is the velocity time the area iso 5 and cleaner zone usually use this approach non unidirectional airflow room are designed by air change rate clean air enter through ceiling filter mixe with room air and dilute particle which leave through return the two are compared in unidirectional vs non unidirectional airflow this guide focuse mainly on non unidirectional room where the air change rate is a choice typical range and where they come from commonly cited range trace back to us industry practice including iest recommended practice iest rp cc012 and the era of federal standard 209e they are useful as a sanity check but are wide because real contamination load vary widely iso class old fs 209e class typical air change rate range typical approach iso 8 class 100 000 about 5 to 48 ach non unidirectional iso 7 class 10 000 about 60 to 90 ach non unidirectional iso 6 class 1 000 about 150 to 240 ach non unidirectional or mixed iso 5 class 100 about 0 2 to 0 5 m s 40 to 100 fpm face velocity unidirectional these figure are for illustration only regulated industry have their own minimum for example usp 797 require at least 30 ach of hepa filtered air in iso 7 buffer room and at least 20 ach in iso 8 ante room hospital and pharmacy room in canada may also be subject to csa "},{"k":"Guide","u":"/guides/cleanroom-hvac-design/","t":"Cleanroom HVAC design: an overview","s":"Learn the main building blocks of a cleanroom HVAC system and the decisions that set its cost, performance and energy use, from classification to commissioning.","nh":"cleanroom hvac design start with requirement not equipment classification airflow pattern and air change rate return filtration air handling system architecture pressurization temperature and humidity architecture and construction control and monitoring testing and certification energy key takeaway","nb":"a cleanroom is a room where the concentration of airborne particle is controlled and often temperature humidity and pressure as well the hvac system doe most of that work it supply large volume of filtered air sweep contamination away from the product keep cleaner room pressurized relative to less clean one and hold environmental condition steady cleanroom hvac is expensive to build and operate so the most important design decision happen early what cleanliness level is truly needed where and in what operating state this overview explain the main element and link to more detailed guide on each topic start with requirement not equipment a cleanroom design should begin with a clear statement of what the room must achieve key input include cleanliness class for each room or zone normally expressed as an iso 14644 1 class and for pharmaceutical work also as a gmp grade occupancy state in which the class apply as built at rest or operational process requirement such as heat load exhaust fume vibration and sensitivity to temperature or humidity containment need where the product or process is hazardous and must be kept in rather than contamination kept out regulatory framework for example health canada gmp requirement usp 797 and 800 with napra model standard for pharmacy compounding or the canadian biosafety standard for containment lab personnel flow and material flow which drive the layout of airlock and gowning room these requirement should be captured in a user requirement specification or owner project requirement which later become the basis for testing classification iso 14644 1 classify cleanroom by the maximum allowed concentration of particle at specified size from iso class 1 cleanest to iso class 9 most pharmaceutical and hospital pharmacy cleanroom fall between iso 5 and iso 8 semiconductor fab may require iso 3 to iso 5 in critical area see iso 14644 cleanroom classification explained not every room need the same class a common and cost effective approach i"},{"k":"Guide","u":"/guides/cleanroom-certification-and-testing/","t":"Cleanroom certification and testing","s":"Learn which tests are performed to certify a cleanroom, in what order and how often, and how to read the results and respond to failures.","nh":"cleanroom hvac design the test order matter occupancy state key test method in more detail airflow filter leak test particle count airflow visualization recovery how often to re certify instrument calibration the certification report common failure and cause key takeaway","nb":"a cleanroom is only as good as its last test certification is the process of measuring a cleanroom performance against its specified class and design criteria and documenting the result it is done when a cleanroom is first built at regular interval afterward and after significant change the core standard are iso 14644 1 which define classification by particle concentration and iso 14644 3 which describe test method regulated industry add their own requirement such as eu gmp annex 1 for sterile pharmaceutical usp 797 and the napra model standard for pharmacy compounding and the canadian biosafety standard for containment lab this guide explain what is tested how and when the test iso 14644 3 describe a range of test method not every cleanroom need every test the specification or regulatory framework determine which apply test what it measure typical application airflow volume or velocity supply airflow air change rate unidirectional velocity and uniformity all cleanroom installed filter leak test leak in hepa or ulpa filter seal and housing all cleanroom with terminal filter pressure differential pressure between room and to surrounding all cleanroom airborne particle count classification particle concentration against iso class limit all cleanroom airflow visualization flow pattern turbulence direction at door and critical zone unidirectional zone gmp pharmacy recovery test time to clean up after a contamination event non unidirectional room gmp containment leak test infiltration through gap or into separative device containment isolator temperature and humidity uniformity and stability of condition where specified electrostatic and ion generator test surface charge and ionizer performance electronic semiconductor lighting and sound level illuminance and noise where specified order matter test are performed in a logical sequence because later test depend on earlier one a typical sequence is visual inspection of construction sealing filter housing and cleanliness air"},{"k":"Guide","u":"/guides/cleanroom-energy-efficiency/","t":"Cleanroom energy efficiency","s":"Learn where cleanroom energy goes and the proven measures, from airflow reduction to heat recovery, that lower operating cost while maintaining classification.","nh":"cleanroom hvac design where the energy goe measure 1 right size air change rate measure 2 setback during unoccupied period measure 3 demand based airflow control measure 4 shrink the cleanest zone measure 5 reduce pressure drop measure 6 efficient fan and motor measure 7 minimize makeup air and exhaust measure 8 heat recovery measure 9 smarter temperature and humidity control measure 10 commission and keep commissioning managing risk key takeaway","nb":"cleanroom are among the most energy intensive space in any building large recirculation airflow conditioned makeup air process exhaust and continuous operation can make a cleanroom use many time more energy per square metre than an office most of it goe to hvac much of that energy is avoidable cleanroom are frequently designed with conservative air change rate run at full airflow around the clock and left unchanged for year iso 14644 16 published in 2019 provide a framework for improving energy efficiency in cleanroom without compromising cleanliness this guide explain where the energy goe and which measure work where the energy goe end use driver typical importance recirculation fan air change rate filter and duct pressure drop fan efficiency often the largest single use makeup air conditioning exhaust volume leakage climate humidity requirement large especially in canadian winter cooling fan heat process heat lighting makeup air in summer large humidification and dehumidification humidity setpoint and tolerance significant in cold and humid season reheat overcooling for dehumidification or control often hidden waste process exhaust fan exhaust volume and static pressure vary by process fan power rise steeply with airflow under the fan law it approache the cube of airflow where duct losse dominate hepa filter pressure drop rise more nearly in proportion to velocity so the real exponent is usually somewhat lower but a modest airflow reduction still produce a large reduction in fan power that make air change rate the most powerful lever measure 1 right size air change rate many cleanroom are designed at the high end of historical air change range without calculation room often meet their class with a wide margin a structured review can safely reduce airflow gather particle monitoring and certification data for each room calculate the required airflow from particle generation target concentration recovery time and heat removal as described in air change rate and airfl"},{"k":"Guide","u":"/guides/cleanroom-pressurization-cascades/","t":"Cleanroom pressurization cascades","s":"Learn how pressure differentials keep contamination flowing in the right direction, how to choose airlock types, and how to calculate and control the airflow offsets that create the cascade.","nh":"cleanroom hvac design why pressure differential work typical pressure differential airlock type cascade airlock bubble airlock sink airlock calculating the airflow offset example controlling the cascade monitoring and alarm commissioning a cascade key takeaway","nb":"a cleanroom suite is designed so that air flow from cleaner area to less clean area never the other way the hvac system create this by supplying slightly more air than it remove from the cleanest room so they are at a higher pressure and stepping pressure down room by room toward the corridor this arrangement is called a pressure cascade where the process involve hazardous material the goal change the cascade may need to keep contamination in as well as out that lead to more complex arrangement using airlock as pressure bubble or sink this guide explain how cascade are designed built and controlled why pressure differential work air move through any opening from high pressure to low pressure in a well sealed cleanroom the opening are door gap pass through cable penetration and the door themselve when opened keeping the cleaner room at higher pressure mean that air leak outward through these path carrying particle away rather than drawing them in a pressure differential only protect the room when door are closed when a door open the differential collapse almost immediately and the protection come from the volume of air flowing through the doorway and from airlock typical pressure differential situation typical differential reference between gmp grade about 10 pa 0 04 in w c guidance value eu gmp annex 1 commonly used design range between classified zone 10 to 15 pa 0 04 to 0 06 in w c industry practice usp 797 buffer room to ante room ante room to unclassified at least 0 020 in w c about 5 pa usp 797 usp 800 hazardous drug buffer room to adjacent space 0 010 to 0 030 in w c about 2 5 to 7 5 pa usp 800 iso 14644 4 guidance between different cleanliness level typically 5 to 20 pa iso 14644 4 larger differential are not automatically better above about 20 to 25 pa door become hard to open or close whistling noise appear at gap and the airflow needed to maintain the differential rise very small differential below about 5 pa are difficult to measure reliably and are easil"},{"k":"Guide","u":"/guides/cleanroom-recovery-and-contamination-control-testing/","t":"Cleanroom recovery and contamination control testing","s":"Learn how recovery time, clean-up period, filter integrity, airflow visualization and containment leak tests are performed under ISO 14644-3, and how to read the results.","nh":"cleanroom hvac design why classification alone is not enough recovery testing what recovery time mean how the test is performed reading the result installed filter leak testing airflow visualization containment leak testing pressure velocity and supporting measurement test frequency and state frequently asked question doe every cleanroom need a recovery test what if recovery time is longer than expected key takeaway","nb":"a cleanroom that passe a particle count at rest has proven only one thing on that day with no people and no process running the air was clean enough contamination control testing ask harder question how quickly doe the room clean itself after a burst of particle are the filter and their seal intact doe air move from clean to less clean area or doe it eddy and stall around equipment these test are described in iso 14644 3 the test method part of the iso 14644 sery and many are referenced by eu gmp annex 1 and health canada gmp guidance for sterile product this guide explain what each test doe how it is performed and what the result mean for an owner or operator why classification alone is not enough iso 14644 1 classification is a snapshot of airborne particle concentration at defined location it doe not tell you whether the airflow pattern protect the product whether the room recover after a disturbance or whether a filter seal is quietly bypassing unfiltered air for that reason a full certification or qualification normally combine classification with a set of supporting test the core one are summarized below test what it verify typical reference recovery time how fast the room return to its clean level after a particle challenge iso 14644 3 installed filter leak no leak through hepa or ulpa media gasket or frame iso 14644 3 iest rp cc034 airflow visualization air direction and pattern over critical zone iso 14644 3 eu gmp annex 1 airflow velocity and volume supply velocity uniformity and air change rate iso 14644 3 pressure differential correct cascade between adjacent room iso 14644 3 containment leak no infiltration through ceiling wall or penetration iso 14644 3 temperature and humidity condition within design limit iso 14644 3 recovery testing what recovery time mean recovery time is the time needed for the particle concentration at a location to fall by a stated ratio after the room is deliberately contaminated iso 14644 3 define a 100 1 recovery time meaning"},{"k":"Guide","u":"/guides/containment-labs-bsl-2-and-bsl-3-hvac/","t":"Containment labs: BSL-2 and BSL-3 HVAC","s":"Learn how HVAC requirements change from containment level 2 to level 3 under the Canadian Biosafety Standard, and how to design, control and verify inward airflow and HEPA exhaust.","nh":"cleanroom hvac design containment level at a glance cl2 laboratory cl3 laboratory pressure cascade controlling airflow and pressure designing for failure verification and recertification key takeaway","nb":"biosafety containment laboratory handle microorganism and toxin that could harm worker the community or animal if released the hvac system is one of the main physical barrier unlike a cleanroom where the goal is to keep contamination out a containment lab hvac must keep hazard in even when equipment fail the term bsl 2 and bsl 3 come from us and world health organization guidance in canada the equivalent level are containment level 2 cl2 and containment level 3 cl3 defined by the canadian biosafety standard cbs published by the public health agency of canada and the canadian food inspection agency the current third edition was published in 2022 facility working with regulated human or animal pathogen must meet the cbs physical containment and operational requirement for their level this guide summarize the hvac aspect the cbs itself and the facility licence condition are the governing document containment level at a glance level typical agent key hvac feature cl1 organism unlikely to cause disease in healthy adult normal laboratory ventilation cl2 moderate individual risk low community risk such as many common human pathogen laboratory ventilation biological safety cabinet inward airflow where required by the cbs or risk assessment cl3 serious disease often airborne transmission such as mycobacterium tuberculosis dedicated hvac inward directional airflow hepa filtered exhaust backflow protection alarm room sealing for decontamination cl4 life threatening agent with no treatment beyond the scope of this guide the cbs also define agriculture specific level such as cl2 ag and cl3 ag for large animal work with more stringent requirement cl2 laboratory at cl2 the primary containment device is usually a class ii biological safety cabinet bsc the room hvac provide general laboratory ventilation and support the bsc typical hvac feature include laboratory ventilation with air not recirculated to non lab area laboratory air change rate are often in the range of 6 to 12 air ch"},{"k":"Guide","u":"/guides/fan-filter-units-vs-ducted-hepa-systems/","t":"Fan filter units vs ducted HEPA systems","s":"Learn how fan filter units and centrally ducted HEPA systems differ, and which factors decide the better choice for a given cleanroom size, class and budget.","nh":"cleanroom hvac design how each system work ducted terminal hepa fan filter unit side by side comparison energy fan heat noise control and monitoring when each is a good fit ffus are often a good fit for ducted system are often a good fit for hybrid design and installation point key takeaway","nb":"every cleanroom has to move a large volume of air through hepa or ulpa filter into the room there are two main way to do it in a ducted system central air handler push air through ductwork to passive terminal filter housing in the ceiling in a fan filter unit ffu system each ceiling module contain its own small fan and filter drawing air from a ceiling plenum and pushing it through the filter into the room both approache can achieve any cleanliness class the right choice depend on room size class ceiling space noise heat control and how the owner will operate and maintain the facility many facility combine them how each system work ducted terminal hepa a recirculating air handling unit or a combination of makeup air and recirculation unit provide all the fan power supply duct run to each ceiling filter housing and return air come back through low wall return and return duct or chase airflow to each filter is set by balancing damper the central fan must overcome duct losse plus the pressure drop of the filter fan filter unit each ffu is a self contained module commonly sized to fit a standard ceiling grid opening such as 600 x 1200 mm 2 x 4 ft or 1200 x 1200 mm 4 x 4 ft a small fan usually with an electronically commutated ec motor draw air from a pressurized or neutral plenum above the ceiling and pushe it through the filter return air reache the plenum through wall chase or return grille a separate makeup air unit supply conditioned outdoor air to the plenum and sensible cooling coil may be located in the return path or in dry cooling coil within the plenum side by side comparison factor ducted terminal hepa fan filter unit first cost small room higher driven by ductwork and ahu lower simple installation first cost large ballroom often competitive can rise with large number of unit fan efficiency large central fan can be very efficient small fan are individually less efficient but ec motor and low static help duct losse ductwork add static pressure minimal no suppl"},{"k":"Guide","u":"/guides/gmp-cleanroom-grades-a-to-d/","t":"GMP cleanroom grades A to D","s":"Learn how GMP grades A to D are defined for sterile manufacturing, how they relate to ISO classes, and what each grade means for HVAC design and monitoring.","nh":"cleanroom hvac design what each grade is for particle limit microbial limit hvac design implication by grade grade a grade b c and d pressure differential monitoring temperature and humidity qualification and requalification frequently asked question is grade a the same as iso 5 do non sterile pharmaceutical facility use these grade key takeaway","nb":"pharmaceutical manufacturer working on sterile product use a grading system grade a to grade d rather than iso classe alone the grade come from annex 1 of the eu and pic s good manufacturing practice guide manufacture of sterile medicinal product the current annex 1 was revised in 2022 with most requirement taking effect in august 2023 health canada is a member of pic s and its gmp guidance for drug product draw on the pic s guide and its annexe including annex 1 for sterile product canadian manufacturer exporting to europe must also meet eu requirement directly this guide explain each grade how it is defined and what it mean for the hvac system manufacturer should alway confirm current regulatory expectation with health canada and their quality unit what each grade is for grade typical use airflow a high risk operation where product or sterile surface are exposed aseptic filling open ampoule aseptic connection unidirectional airflow often within an isolator or rab b background environment for grade a aseptic preparation and filling when not in an isolator non unidirectional c less critical stage such as preparation of solution to be filtered or filling of terminally sterilized product non unidirectional d least critical clean area such as handling component after washing non unidirectional the background required for a grade a zone depend on the technology an open grade a zone or restricted access barrier system rab normally sit in a grade b room an isolator can usually sit in a grade c or d background because the isolator itself provide the separation that choice has a large effect on hvac size and operating cost particle limit annex 1 set maximum airborne particle concentration for each grade at rest and in operation the 2022 revision aligned the limit with iso 14644 1 grade at rest 0 5 um at rest 5 um in operation 0 5 um in operation 5 um a 3 520 not specified 3 520 not specified b 3 520 not specified 352 000 2 930 c 352 000 2 930 3 520 000 29 300 d 3 520 000 29"},{"k":"Guide","u":"/guides/hepa-and-ulpa-filter-systems/","t":"HEPA and ULPA filter systems","s":"Learn how HEPA and ULPA filters are classified, how housings and seals affect performance, and how installed filters are leak tested and maintained.","nh":"cleanroom hvac design how high efficiency filter capture particle rating system en 1822 and iso 29463 iest recommended practice what about merv choosing filter efficiency prefiltration housing and seal terminal housing seal type velocity and pressure drop installed filter leak testing photometer method discrete particle counter method replacement and handling key takeaway","nb":"high efficiency particulate air hepa filter are the final barrier between a cleanroom air handling system and the room ultra low penetration air ulpa filter go a step further for the most demanding application a filter is only as good as its installation though a tiny leak in a gasket frame or filter medium can let unfiltered air bypass an otherwise excellent filter this guide explain how hepa and ulpa filter are rated what to look for in housing and seal and how installed filter are tested and maintained how high efficiency filter capture particle hepa filter are made of pleated glass fibre or synthetic media they do not act like a sieve particle are captured by three main mechanism interception impaction larger particle that cannot follow the airflow around fibre and diffusion very small particle moving randomly into fibre each mechanism work best at a different particle size which produce a size at which the filter is least efficient called the most penetrating particle size mpp for typical hepa media at normal velocity mpp is generally between about 0 1 and 0 3 um this explain why hepa filter are very effective against both larger particle and very small one and why rating are tied to the hardest particle to capture rating system several system are used and specification should name one clearly en 1822 and iso 29463 the european standard en 1822 classify filter by efficiency at the mpp iso 29463 use a closely related method with its own class designation en 1822 class minimum efficiency at mpp category e10 85 epa e11 95 epa e12 99 5 epa h13 99 95 hepa h14 99 995 hepa u15 99 9995 ulpa u16 99 99995 ulpa u17 99 999995 ulpa h13 and h14 filter also have local efficiency limit tested by scanning so a filter cannot pass on overall average with a localized weak spot iest recommended practice in north america iest rp cc001 define filter type by test method and efficiency the traditional hepa definition is at least 99 97 percent efficiency at 0 3 um ulpa filter are define"},{"k":"Guide","u":"/guides/hospital-pharmacy-compounding-rooms-usp-797-and-800/","t":"Hospital pharmacy compounding rooms (USP 797 and 800)","s":"Learn how USP 797 and 800 and the NAPRA model standards shape HVAC design for hospital and community pharmacy compounding rooms, and what certification involves.","nh":"cleanroom hvac design key space non hazardous sterile compounding usp 797 hazardous drug compounding usp 800 pressure arrangement hvac design consideration dedicated system biological safety cabinet exhaust airflow control construction temperature control certification key takeaway","nb":"sterile compounding pharmacy prepare intravenous medication chemotherapy total parenteral nutrition and other preparation that must be free of microbial contamination many also handle hazardous drug that pose risk to pharmacy staff the hvac system is central to both goal it create the classified environment that protect the preparation and the negative pressure environment that contain hazardous drug in the united state requirement come from usp general chapter 797 sterile compounding and usp 800 hazardous drug in canada the national association of pharmacy regulatory authority napra publishe model standard for sterile compounding of non hazardous and hazardous preparation which draw heavily on usp and are adopted or adapted by provincial pharmacy regulator hospital facility are also designed to csa z317 2 this guide explain the hvac requirement in general term alway confirm current requirement with the provincial regulator and the applicable edition of each standard key space space purpose typical classification primary engineering control pec biological safety cabinet compounding aseptic isolator or laminar airflow workbench where compounding occur iso 5 buffer room cleanroom room housing the pec iso 7 ante room hand hygiene gowning staging transition from unclassified space iso 7 or iso 8 if it open only to a positive pressure buffer room segregated compounding area sca unclassified area with a pec for limited risk compounding unclassified containment segregated compounding area c sca unclassified negative pressure room for limited hazardous drug compounding unclassified hazardous drug storage storage of antineoplastic and other hazardous drug negative pressure externally exhausted the iso 14644 classification guide explain iso classe non hazardous sterile compounding usp 797 the revised usp 797 official since november 2023 set these main hvac requirement for non hazardous compounding suite air change the iso 7 buffer room need at least 30 air change per hour ach"},{"k":"Guide","u":"/guides/iso-14644-cleanroom-classification/","t":"ISO 14644 cleanroom classification explained","s":"Learn how ISO 14644-1 cleanroom classes are defined, how to read the class limit table, and what a classification test involves under the 2015 edition.","nh":"cleanroom hvac design the iso 14644 family how classe are defined choosing particle size occupancy state what classification doe not cover how a classification test work before counting particle monitoring and re testing writing a good requirement key takeaway","nb":"when someone describe a room as iso 7 or iso 5 they are using the classification system in iso 14644 1 the international standard for cleanroom air cleanliness by particle concentration it replaced the older us federal standard 209e whose class 100 class 10 000 and class 100 000 label are still heard in conversation understanding what the class number mean and what it doe not mean help owner write better requirement and avoid paying for cleanliness they do not need this guide explain the classification system and how a room is tested against it the iso 14644 family iso 14644 is a sery of standard the part most relevant to hvac design and testing are part subject iso 14644 1 classification of air cleanliness by particle concentration iso 14644 2 monitoring to provide evidence of cleanroom performance iso 14644 3 test method airflow pressure filter leak recovery and more iso 14644 4 design construction and start up iso 14644 5 operation iso 14644 7 separative device such as isolator and minienvironment iso 14644 8 airborne molecular contamination iso 14644 16 energy efficiency in cleanroom the current edition of part 1 was published in 2015 and made several significant change from the 1999 edition particularly to sampling how classe are defined iso classe run from iso class 1 the cleanest to iso class 9 the class number n set the maximum permitted concentration of particle at or above a given size using this formula cn 10 n x 0 1 d 2 08 where cn is the maximum concentration in particle per cubic metre and d is the particle size in micrometre each step in class number allow ten time more particle in practice people use the table of class limit in the standard the most commonly used row are shown below iso class 0 1 um 0 3 um 0 5 um 1 um 5 um iso 3 1 000 102 35 8 not specified iso 4 10 000 1 020 352 83 not specified iso 5 100 000 10 200 3 520 832 not specified iso 6 1 000 000 102 000 35 200 8 320 293 iso 7 not specified not specified 352 000 83 200 2 930 iso 8 not speci"},{"k":"Guide","u":"/guides/modular-cleanrooms/","t":"Modular cleanrooms","s":"Learn the main types of modular cleanroom, how their HVAC systems work, and the code, building integration and testing questions owners should resolve before purchase.","nh":"cleanroom hvac design type of modular cleanroom softwall hardwall panelized system hvac option fan filter unit with building air fan filter unit with a dedicated plenum ducted hepa system heat is the most common problem building code and fire protection integration with the building what to ask before buying testing and certification key takeaway","nb":"a modular cleanroom is built from prefabricated component such as wall panel ceiling grid door and fan filter unit rather than conventional construction modular system range from a simple softwall enclosure over a workbench to a complete multi room pharmaceutical suite made of insulated metal panel they are popular because they can be installed quickly modified as need change and sometime relocated modular doe not mean simple though a modular cleanroom still sit inside a building with its own hvac fire protection and code requirement and it still must be tested and certified this guide explain the option and the issue owner most often overlook type of modular cleanroom type construction typical classe common use softwall frame with vinyl curtain wall ceiling mounted fan filter unit iso 7 to iso 8 sometime iso 6 light assembly packaging temporary or local clean zone hardwall rigid frame with acrylic polycarbonate or laminate panel iso 5 to iso 8 electronic medical device laboratory panelized cleanroom panel system insulated sandwich panel with flush joint coved corner walkable or non walkable ceiling iso 5 to iso 8 gmp grade pharmaceutical hospital pharmacy biotech semiconductor pod or prefabricated module factory built room module shipped complete vary rapid deployment remote or temporary facility softwall softwall cleanroom are the least expensive and fastest to install the vinyl curtain do not form a sealed enclosure air escape at the bottom of the curtain which help sweep particle out pressure control is limited and temperature control rely on the surrounding building they suit local protection rather than regulated environment hardwall hardwall cleanroom have rigid wall that allow positive pressure pass through and better sealing they are often freestanding with fan filter unit in the ceiling and air returning through wall opening or out under the wall they can achieve good classe but may need additional cooling panelized system panelized system use flush cleana"},{"k":"Guide","u":"/guides/pharmaceutical-cleanroom-hvac/","t":"Pharmaceutical cleanroom HVAC","s":"Learn how GMP requirements shape HVAC design for sterile and non-sterile pharmaceutical facilities, from contamination control strategy to qualification and ongoing monitoring.","nh":"cleanroom hvac design start with a contamination control strategy sterile manufacturing isolator vs rab non sterile manufacturing recirculation vs once through air pressure regime for potent product temperature and humidity qualification monitoring and change control key takeaway","nb":"in pharmaceutical manufacturing the hvac system is part of the quality system it protect product from contamination protect worker and the environment from potent material and maintain the condition that keep product stable regulator treat hvac as a gmp critical utility which mean it must be designed for its intended purpose qualified monitored and controlled through change management in canada drug manufacturer are licensed by health canada and must follow its good manufacturing practice guide for drug product health canada is a member of pic s and its approach to sterile manufacturing align with pic s and eu gmp annex 1 this guide outline how these requirement translate into hvac design it is general guidance each facility quality unit and regulatory adviser determine the specific requirement start with a contamination control strategy the 2022 revision of annex 1 made the contamination control strategy ccs central for sterile manufacturing a ccs is a documented facility wide plan that identify contamination risk and the control that address them hvac contribute several control filtration of supply air airflow pattern that protect exposed product pressure cascade that keep contamination moving in the right direction segregation of area and product temperature and humidity control monitoring that detect loss of control even for non sterile facility a documented risk assessment often following ich q9 quality risk management principle should drive hvac design choice sterile manufacturing sterile product such as injectable and ophthalmic product use gmp grade a to d grade a zone where product is exposed use unidirectional airflow from hepa filter typically within isolator or restricted access barrier system rab background room use non unidirectional airflow see gmp cleanroom grade a to d for particle and microbial limit key hvac feature for sterile facility terminal hepa filtration for all classified room typically h13 or h14 leak tested after installation and at requ"},{"k":"Guide","u":"/guides/semiconductor-and-electronics-cleanrooms/","t":"Semiconductor and electronics cleanrooms","s":"Learn how semiconductor and electronics cleanrooms differ from pharmaceutical cleanrooms, and the HVAC systems that control particles, chemicals, temperature, humidity and static.","nh":"cleanroom hvac design cleanliness level ballroom bay and minienvironment ballroom cleanroom bay and chase layout minienvironment and foup airflow and filtration airborne molecular contamination temperature and humidity battery dry room process exhaust electrostatic discharge vibration energy key takeaway","nb":"semiconductor fabrication pushed cleanroom technology further than any other industry as circuit feature shrank the particle size that could destroy a chip shrank with them and the industry developed ultra clean environment ulpa filtration minienvironment and control of chemical contamination in the air electronic assembly photonic microelectromechanical system mem battery manufacturing and precision optic use many of the same principle at less extreme level unlike pharmaceutical cleanroom which focus heavily on microbial control these facility care about particle airborne chemical electrostatic discharge vibration and very precise temperature and humidity this guide explain the main hvac consideration cleanliness level requirement vary widely by process facility type typical cleanliness note advanced semiconductor wafer processing iso 3 to iso 5 at the wafer often within minienvironment background bay can be iso 6 or cleaner mature node or specialty semiconductor fab iso 4 to iso 6 depend on process and wafer handling photonic mem compound semiconductor iso 4 to iso 7 often in university or research facility electronic assembly smt line sensor iso 7 to iso 8 or controlled non classified esd control often more important than particle hard disk optic display manufacturing iso 4 to iso 6 in critical area process specific lithium ion battery cell assembly iso 7 to iso 8 often in dry room very low dew point is the main challenge the iso 14644 classification guide explain the class limit ballroom bay and minienvironment ballroom cleanroom early fab used large open ballroom cleanroom with full unidirectional downflow across the entire ceiling this delivered very clean condition everywhere at a very high energy cost bay and chase layout later design separated clean process bay where wafer are handled from service chase where tool maintenance take place under less stringent condition this reduced the area requiring the highest class minienvironment and foup modern fab move "},{"k":"Guide","u":"/guides/temperature-and-humidity-control-in-cleanrooms/","t":"Temperature and humidity control in cleanrooms","s":"Learn why cleanrooms need tighter temperature and humidity control than most spaces, and how system architecture, dew point control and clean humidification deliver it.","nh":"cleanroom hvac design why temperature and humidity matter temperature humidity typical design range setting tolerance system architecture separate latent and sensible load dew point control in summer recirculation coil humidification in canadian winter heat load control and sensor key takeaway","nb":"particle control get most of the attention in cleanroom design but temperature and humidity control is often harder to achieve cleanroom have large recirculation airflow significant equipment heat gowned operator who overheat easily and product or processe that may react to small change in moisture in canada they also face very dry winter and humid summer this guide cover typical requirement how to set realistic tolerance and the system design choice that make stable control possible why temperature and humidity matter temperature operator comfort cleanroom garment hood mask and glove trap heat operator who are too warm sweat and shed more particle and microorganism room with full aseptic gowning are often held cooler than ordinary workplace process stability precision measurement photolithography and some chemical processe are sensitive to temperature change sometime to fraction of a degree product stability many pharmaceutical product and material have temperature limit humidity static electricity low humidity increase electrostatic charge which attract particle to surface and can damage electronic component or affect powder handling microbial growth high humidity encourage microbial growth on surface and in building material moisture sensitive product hygroscopic powder effervescent tablet and some medical device require low humidity corrosion and material behaviour some processe are sensitive to moisture absorbed by material operator comfort humidity combined with gowning affect comfort typical design range requirement vary widely by industry and should be driven by product and process need not habit application typical temperature typical relative humidity pharmaceutical aseptic area gowned about 18 to 21 c 64 to 70 f about 30 to 60 often controlled to a narrower band hospital pharmacy compounding usp 797 20 c 68 f or cooler recommended below 60 recommended general iso 7 and iso 8 room about 20 to 22 c 68 to 72 f about 30 to 60 semiconductor fabrication about 2"},{"k":"Guide","u":"/guides/unidirectional-vs-non-unidirectional-airflow/","t":"Unidirectional vs non-unidirectional airflow","s":"Learn the difference between unidirectional and non-unidirectional cleanroom airflow, the design rules that make each work, and how to choose the right pattern for each zone.","nh":"cleanroom hvac design how unidirectional airflow work where unidirectional airflow is used how non unidirectional airflow work side by side comparison mixed flow and hybrid design common problem unidirectional zone non unidirectional room verifying airflow performance choosing the right approach key takeaway","nb":"cleanroom control airborne particle in one of two way they either sweep particle away from the work with a uniform parallel flow of clean air or they dilute particle by mixing large volume of clean air into the room iso 14644 call the first unidirectional airflow and the second non unidirectional airflow many facility still call them laminar and turbulent flow although true laminar flow in the fluid dynamic sense rarely exist in a cleanroom the choice between them set the cleanliness a zone can achieve its sensitivity to disturbance and its energy use most real facility use both with unidirectional flow only where it is essential how unidirectional airflow work in a unidirectional zone filtered air enter across the whole ceiling vertical flow or a whole wall horizontal flow at a uniform velocity it move in roughly parallel streamline through the work area and leave through a perforated floor low wall return or the opposite wall particle released in the zone are carried downstream and out before they can spread sideway key design feature full filter coverage hepa or ulpa filter cover most of the ceiling or wall typically with filter coverage well above half the area and often close to 100 percent for the cleanest zone uniform velocity velocity is typically in the range of about 0 2 to 0 5 m s 40 to 100 fpm eu gmp annex 1 give a guidance range of 0 36 to 0 54 m s at the working position for grade a uniformity is commonly specified within plus or minus 20 percent of the average unobstructed path equipment work surface and people disturb the flow perforated work surface streamlined equipment and keeping hand and object downstream of critical point help low level or floor return return air must leave on the far side of the work so streamline stay parallel where unidirectional airflow is used gmp grade a zone for aseptic processing semiconductor lithography and other iso 3 to iso 5 area biological safety cabinet laminar flow hood and isolator hospital pharmacy primary eng"},{"k":"Guide","u":"/guides/air-valve-controls-integration-with-bacnet/","t":"Air valve controls integration with BACnet","s":"Learn how air valve and room controllers communicate over BACnet, which points to expose, how to divide control responsibilities, and how to test integration.","nh":"air valve and critical airflow control typical architecture divide control responsibility clearly point to expose per valve per fume hood per room for fan control network design alarm trending and analytic cybersecurity testing the integration frequently asked question should valve controller be btl listed can the bas control the valve directly key takeaway","nb":"critical airflow control system for lab hospital and vivaria are usually supplied by specialist manufacturer each air valve has a controller and room often have a dedicated room level controller that coordinate supply exhaust and fume hood the building automation system bas meanwhile run air handler exhaust fan plant and the operator interface these two system must share information reliably bacnet the open protocol defined by ashrae standard 135 and iso 16484 5 is the most common way to connect them this guide explain the typical architecture the point worth exposing and how to test that integration work for bacnet fundamental see bacnet basic for building owner typical architecture airflow control product are generally available in one of these arrangement native bacnet controller at each valve or room valve controller communicate directly on bacnet ms tp or bacnet ip proprietary room network with a bacnet gateway valve and room controller communicate on the manufacturer own network and a gateway or router present their data to the bas as bacnet object hybrid room level controller are bacnet device while sub device such as hood monitor communicate locally each can work well what matter is how many point are exposed how fast they update and how failure are handled divide control responsibility clearly a key design decision is which system control what a common and robust division is function airflow control system bas fume hood face velocity control monitor room supply and exhaust flow control monitor room offset and pressure control monitor alarm room temperature control reheat or receive setpoint may provide setpoint and schedule occupancy mode execute send schedule or override duct static pressure provide valve feedback control fan exhaust fan and stack velocity provide demand data control alarm annunciation local alarm central alarm and notification life safety airflow function should run locally in the airflow controller and must keep working if the bacnet net"},{"k":"Guide","u":"/guides/air-valve-materials-and-coatings-for-corrosive-exhaust/","t":"Air valve materials and coatings for corrosive exhaust","s":"Learn the corrosion risks in lab and process exhaust, the material and coating options for air valves, and how to match them to the chemicals in use.","nh":"air valve and critical airflow control what make lab exhaust corrosive material and coating option matching material to the chemical special exhaust system perchloric acid hydrofluoric acid radioisotope hood fire and code consideration installation practice that extend life inspection and maintenance frequently asked question do all lab exhaust valve need special coating is stainless steel alway the safest choice can i upgrade material later key takeaway","nb":"fume hood and process exhaust can be one of the harshest environment in a building acid vapour solvent oxidizer and condensing moisture attack metal and degrade some plastic an air valve installed in that airstream must keep moving freely and holding its calibrated flow for decade if its shaft corrode or its cone stick the hood may lose face velocity without anyone noticing until certification this guide explain the corrosion risk in lab exhaust and the material and coating choice manufacturer offer so owner and designer can match the valve to the service what make lab exhaust corrosive several factor combine acid hydrochloric nitric sulfuric hydrofluoric and perchloric acid vapour attack many metal solvent some organic solvent soften or swell certain plastic and coating oxidizer chlorine compound and peroxide can degrade both metal and polymer moisture and condensation vapour that condense on cool surface concentrate the chemical and accelerate attack especially in unheated ceiling space or near exhaust fan in cold weather mixture in a shared exhaust system chemical from many hood mix and combination can be more aggressive than any single one the severity depend on what the lab actually doe a teaching lab using small quantity of dilute reagent is very different from a digestion lab boiling concentrated acid material and coating option air valve body cone shaft spring and fastener are available in several construction product offering differ between manufacturer so the table below describe common category rather than any one product line construction typical description strength limitation uncoated aluminum or galvanized standard for supply and general exhaust low cost light weight not suitable for acidic or wet exhaust baked phenolic or epoxy coating coating applied to aluminum or steel component good resistance to many acid and solvent widely used for fume hood exhaust coating damage expose base metal some solvent and strong oxidizer can attack it stainless steel "},{"k":"Guide","u":"/guides/air-valve-sizing-and-turndown/","t":"Air valve sizing and turndown","s":"Learn how to select air valve size and pressure class from minimum and maximum airflow, why turndown matters in labs, and the common sizing mistakes to avoid.","nh":"air valve and critical airflow control start with the full range of airflow understanding turndown pressure class selection step by step sizing procedure common sizing mistake oversizing for future growth ignoring unoccupied minimum ignoring offset at low flow sizing on duct size noise consideration frequently asked question is a bigger valve safer can one valve serve two fume hood do valve need to be resized when minimum ach is reduced key takeaway","nb":"choosing the size of an air valve look simple find a valve whose rated range cover the design airflow in practice the minimum flow matter as much as the maximum the pressure class affect fan energy and oversizing is one of the most common reason a critical airflow system underperform turndown the ratio of maximum to minimum controllable flow is the property that tie these together this guide walk through how venturi and similar pressure independent air valve are sized what turndown mean in practice and the check that keep a selection sound start with the full range of airflow every valve must handle the highest and lowest flow it will ever be asked to deliver for each valve establish maximum flow for a fume hood the face velocity target time the maximum sash opening for room supply the larger of cooling load hood make up and maximum ventilation minimum flow for a fume hood the closed sash minimum for room supply and general exhaust the unoccupied ventilation rate or the minimum needed to maintain offset intermediate mode purge decontamination occupied and unoccupied setpoint future change space for additional hood or higher load if the owner want flexibility the ratio of maximum to minimum is the turndown the valve must achieve lab with vav hood occupancy setback and aggressive minimum can require high turndown sometime beyond what a single valve offer understanding turndown manufacturer publish a minimum and maximum flow for each valve size and pressure class within that range the valve hold its stated accuracy typical published turndown for venturi valve are in the range of about 8 1 to 20 1 depending on size model and pressure class single dual triple and quad valve assembly extend the maximum while the minimum is set by the smallest controllable position turndown is not just about range accuracy expressed as a percentage of reading matter most at low flow where absolute error in offset can affect room pressure a valve working near its minimum for most of the yea"},{"k":"Guide","u":"/guides/commissioning-and-verifying-venturi-air-valves/","t":"Commissioning and verifying venturi air valves","s":"Learn what to check before, during and after functional testing of venturi air valve systems, and how to document results that the owner can rely on.","nh":"air valve and critical airflow control what make venturi valve commissioning different pre functional check static pressure verification flow verification sampling approach measurement method acceptance room level functional testing fume hood integration documentation ongoing verification frequently asked question can the bas flow reading be used instead of measurement who should commission a venturi valve system what is the most common problem found key takeaway","nb":"venturi air valve arrive from the factory characterized and ready to control that doe not mean the installed system work valve can be installed backward configured with the wrong size in the controller starved of static pressure or paired with a room controller using the wrong offset commissioning is how an owner find these problem before occupant and researcher rely on the system this guide set out a practical approach to commissioning and verifying venturi valve system in laboratory hospital and other critical space it complement the general process in commissioning process from opr to turnover what make venturi valve commissioning different traditional vav commissioning focuse on calibrating flow sensor so the controller read true flow venturi valve have no flow sensor their reported flow is calculated from actuator position and a factory characterization commissioning therefore shift from calibration to verification confirm each valve is configured correctly in its controller confirm each valve has enough pressure drop to be pressure independent measure actual flow at a sample of valve and all critical room to confirm the characterization hold in the installed condition verify the room level sequence offset response time and alarm that make the system safe pre functional check before any airflow testing check installation and configuration a typical checklist valve size type and pressure class match the approved submittal and schedule airflow direction arrow on the valve matche the actual airflow orientation horizontal or vertical matche the factory characterization inlet duct condition meet the manufacturer installation guidance actuator linkage and position feedback are connected and move freely through full stroke controller configuration list the correct valve model size and flow range minimum maximum and mode setpoint are entered as scheduled sash sensor on fume hood are installed and sash dimension are entered correctly room pressure monitor are installed "},{"k":"Guide","u":"/guides/fume-hood-face-velocity-control-and-sash-sensing/","t":"Fume hood face velocity control and sash sensing","s":"Learn how variable air volume fume hoods control face velocity, how sash and velocity sensors work, and what to check when commissioning or certifying them.","nh":"air valve and critical airflow control face velocity target how vav face velocity control work sash position sensing sidewall velocity sensing comparing the two minimum and maximum exhaust monitor and alarm occupancy and sash management testing and certification frequently asked question why doe face velocity drop briefly when i raise the sash is a lower face velocity unsafe can constant volume hood be converted to vav key takeaway","nb":"a chemical fume hood protect its user by pulling air in through the open sash fast enough to capture vapour generated inside that inward air speed the face velocity is the most familiar measure of hood performance in a constant volume hood face velocity rise sharply as the sash is lowered in a variable air volume vav hood the exhaust change with the sash opening so that face velocity stay near a target value vav hood save large amount of conditioned air because exhaust fall whenever sashe are lowered they also add control that must work every time this guide explain how face velocity control work the sensing method available and what to verify face velocity target face velocity is the average air speed through the open sash area it is not a guarantee of containment which also depend on hood design room air current and user behaviour but it is a practical control variable typical target for conventional chemical fume hood are in the range of 0 4 to 0 5 m s 80 to 100 fpm with many institution using 0 5 m s 100 fpm ansi assp z9 5 and csa z316 5 address face velocity and containment criteria some high performance or low flow hood are designed and tested to operate at lower face velocity but only where containment testing support it very high face velocity are not better above roughly 0 6 m s 120 fpm turbulence around the user body can reduce containment the owner chemical hygiene plan or lab ventilation management program normally set the target and provincial occupational health and safety rule may also apply how vav face velocity control work the required exhaust flow is simply the face velocity target multiplied by the open sash area the hood controller need to know one of two thing the open area or the actual face velocity that lead to two control approache sash position sensing sensor measure the sash opening and the controller calculate open area and command the exhaust valve to the matching flow vertical sashe a cable extension sensor or similar position transduc"},{"k":"Guide","u":"/guides/hospital-isolation-room-airflow-control-with-air-valves/","t":"Hospital isolation room airflow control with air valves","s":"Learn how air valves are applied to airborne infection isolation and protective environment rooms, how to handle anterooms and mode switching, and what to verify.","nh":"air valve and critical airflow control requirement that drive the design typical valve arrangement setting the offset anteroom convertible room and mode switching monitoring and alarm emergency and fire mode verification key takeaway","nb":"hospital isolation room rely on airflow to protect people an airborne infection isolation room aiir keep an infectious patient exhaled particle from reaching corridor and other patient a protective environment pe room keep contaminant away from a severely immunocompromised patient in both the hvac system must deliver the right air change rate and keep air moving in the right direction every hour of every day air valve particularly pressure independent venturi valve are widely used for this job because they hold supply and exhaust flow accurately even when duct pressure change elsewhere in the hospital this guide cover how they are applied how the room is controlled and how to verify it requirement that drive the design in canada health care facility hvac is governed by csa z317 2 special requirement for heating ventilation and air conditioning hvac system in health care facility as referenced by provincial health authority and building code many designer also refer to ashrae standard 170 the key isolation room parameter are a minimum total air change rate typically 12 ach for aiir and pe room under ashrae 170 with csa z317 2 value to be confirmed for the edition in force pressure direction negative to adjacent space for aiir positive for pe a minimum pressure differential with 2 5 pa 0 01 in w c commonly cited as a minimum in ashrae 170 and owner often designing for more aiir exhaust ducted directly outdoor with discharge located away from intake hepa filtration of supply air for pe room a permanent mean of monitoring pressure usually a continuous monitor with alarm requirement differ by edition and by provincial health authority so the owner functional program and the authority having jurisdiction should be confirmed early see hospital hvac and csa z317 2 for the broader context typical valve arrangement room type supply exhaust pressure relationship aiir constant volume or two state valve constant volume valve set above supply negative to anteroom and corridor pe "},{"k":"Guide","u":"/guides/laboratory-airflow-control-systems/","t":"Laboratory airflow control systems","s":"Learn the components of a lab airflow control system, the control modes that drive room airflow, and the design and operating choices that affect safety and energy use.","nh":"air valve and critical airflow control component of a lab airflow control system what drive the room airflow hood driven lab load driven lab ventilation driven lab minimum air change rate room pressurization control mode integration with the building performance verification frequently asked question why do lab use so much energy can lab exhaust air be recirculated what is a lab ventilation management program key takeaway","nb":"a laboratory hvac system has job that an office system never face it must capture hazardous fume at fume hood keep the lab negative so contaminant do not spread into corridor dilute any release in the room and do all of this while airflow change minute by minute as researcher open and close sashe the laboratory airflow control system is the set of device and logic that make this happen because lab often use several time the airflow per square metre of an office and much of it is 100 percent outdoor air airflow control is also the single biggest lever on a lab building energy use good control is both a safety system and an energy system component of a lab airflow control system a typical lab room include fume hood exhaust valve one per hood varying exhaust with sash position or face velocity general exhaust valve remove air from the room not exhausted by hood maintaining the minimum air change rate and room offset supply valve deliver conditioned air to the room often with a reheat coil downstream room controller coordinate the valve calculate total and enforce offset fume hood monitor display face velocity or flow status at each hood and alarm locally sensor sash position sensor sidewall velocity sensor room temperature occupancy sensor and sometime a room pressure monitor or air quality sensor the airflow device are commonly venturi air valve or vav terminal with airflow station the comparison is covered in venturi valve vs vav boxe with airflow station what drive the room airflow at any moment the lab supply airflow is set by the largest of several requirement the room controller evaluate each and pick the governing one requirement what set it typical basis hood exhaust demand total of all hood exhaust plus offset sash position and face velocity setpoint minimum ventilation air change per hour for dilution owner lab ventilation management program ansi assp z9 5 cooling load heat from equipment lighting and people room temperature control make up for other exhaust "},{"k":"Guide","u":"/guides/manifolded-lab-exhaust-systems/","t":"Manifolded lab exhaust systems","s":"Learn how manifolded lab exhaust works, its advantages over individual hood fans, how pressure and stack velocity are controlled, and the design checks that matter.","nh":"air valve and critical airflow control how a manifolded system work advantage over individual hood fan manifold static pressure control stack discharge and bypass air redundancy and reliability chemical compatibility and exclusion energy recovery commissioning and operation key takeaway","nb":"older laboratory building often have a separate exhaust fan on the roof for every fume hood each fan run whenever its hood is in use and the roof become a forest of small stack modern lab building more commonly use a manifolded exhaust system in which many hood and general exhaust point connect to a common duct served by a group of large fan manifolding offer redundancy energy saving and better plume dispersion but it also create a shared system that must be controlled carefully this guide explain how it work and what to watch for how a manifolded system work each fume hood and each lab general exhaust connect through its own air valve to a branch duct branche join a main exhaust manifold which run to a fan plenum on the roof or in a penthouse two or more exhaust fan draw from the plenum and discharge through high velocity stack key component include individual air valve controlling each hood and general exhaust point a manifold and branch ductwork sized for combined flow a static pressure sensor in the manifold exhaust fan commonly in an n 1 arrangement a bypass or outdoor air damper at the fan plenum stack or high plume induced flow fan optional heat recovery coil advantage over individual hood fan factor individual hood fan manifolded system redundancy fan failure stop one hood standby fan maintain service diversity each fan sized for its hood maximum fan sized for diversified building demand roof penetration many few plume dispersion many small low momentum plume fewer larger high momentum plume heat recovery difficult practical at the manifold maintenance many fan across the roof fewer fan concentrated access chemical separation inherent require review of compatibility diversity is a significant benefit not every sash is fully open at once so the combined peak is usually lower than the sum of individual maximum choosing a diversity factor need care and an understanding of how the lab will be used aggressive assumption leave no room for growth manifold static pr"},{"k":"Guide","u":"/guides/pressure-independent-airflow-control-without-flow-measurement/","t":"Pressure-independent airflow control without flow measurement","s":"Understand the physics behind sensorless pressure-independent airflow control, how factory characterization replaces field flow sensing, and the conditions it depends on.","nh":"air valve and critical airflow control the basic physic setting the flow characterization replace measurement condition the method depend on pressure drop within the rated range mechanism in good condition reasonable inlet condition correct installation orientation how the bas know the flow verifying performance in the field frequently asked question is open loop control less reliable than closed loop control can i add a flow sensor to a venturi valve how often should valve be re verified key takeaway","nb":"most airflow control in building work by measurement a sensor read the airflow and a controller move a damper until the reading matche setpoint pressure independent air valve take a different approach they hold a set airflow through mechanical design with no sensor reading the flow and no feedback loop correcting it this idea is not new mechanical constant volume regulator have existed for decade and the same principle appear in hydronic as automatic flow limiting valve and pressure independent control valve in critical airflow application it is most familiar in the venturi air valve this guide explain the physic the role of factory characterization and the limit that designer and operator need to respect the basic physic airflow through any opening is related to the open area and the pressure difference across it for a fixed opening flow rise roughly with the square root of the pressure drop double the pressure drop and flow rise by about 41 percent this is why an ordinary damper is pressure dependent if the duct static pressure change so doe the airflow to hold flow constant the open area must shrink as pressure rise and grow as pressure fall in exactly the right proportion a pressure independent air valve doe this with a moving element usually a cone or a flap balanced against a spring higher pressure drop pushe the element toward a closed position reducing area lower pressure drop let the spring move it back increasing area the shape of the valve body and the spring rate are designed so that area time the square root of pressure drop stay nearly constant the result is a valve that deliver close to the same airflow anywhere within its rated pressure range with no electrical input needed for the compensation itself setting the flow characterization replace measurement for variable air volume operation the valve also need a way to change the flow setpoint an actuator move the element base position along a shaft or change the spring preload each position correspond "},{"k":"Guide","u":"/guides/retrofitting-lab-airflow-controls/","t":"Retrofitting lab airflow controls","s":"Learn how to assess an existing lab building, choose retrofit measures such as VAV hoods and lower minimum air changes, and phase the work while labs stay in use.","nh":"air valve and critical airflow control why retrofit assessing the existing building retrofit measure planning and design set the performance target check existing infrastructure address hood suitability plan the bas integration phasing work in occupied lab verifying result safety verification energy verification persistence frequently asked question how much can a lab airflow retrofit save doe reducing air change reduce safety can we keep the existing valve key takeaway","nb":"laboratory building are among the most energy intensive building in canada largely because they move large volume of outdoor air that must be heated cooled and exhausted many were built with constant volume fume hood high fixed air change rate and control that are now obsolete retrofitting the airflow control can reduce energy use substantially while improving safety because modern system monitor and alarm condition older system never measured a lab retrofit is not a simple equipment swap it touche life safety system in occupied research space this guide outline how to assess plan execute and verify the work why retrofit common driver include energy and carbon reducing airflow cut fan heating cooling and reheat energy many institution have carbon target that make lab building a priority obsolete control older airflow controller may be unsupported with no spare part and proprietary software safety concern constant volume hood with no monitor room with unknown pressure direction and failing exhaust valve are common finding changing use lab converted to computational or dry use may no longer need high airflow capacity reducing lab airflow can free up air handler and plant capacity for new research space without new equipment assessing the existing building start with what is actually there and how it perform a thorough assessment include inventory of hood and exhaust device type size sash configuration condition current flow and certification history room by room airflow survey measured supply exhaust air change rate and pressure direction control review controller type age communication sequence and whether setpoint match design hazard review with the health and safety office identify what each lab doe and what ventilation it need air handler and exhaust fan review capacity condition variable speed capability and static pressure utility and trend data energy use operating hour and existing bas trend this often overlap with retro commissioning existing building and an "},{"k":"Guide","u":"/guides/room-pressurization-control-offset-vs-direct-pressure/","t":"Room pressurization control: offset vs direct pressure","s":"Learn how flow offset and direct pressure control maintain room pressure, the strengths and weaknesses of each, and when a cascaded approach makes sense.","nh":"air valve and critical airflow control what create room pressure flow offset control how it work strength weaknesse direct pressure control how it work strength weaknesse comparison cascaded control monitoring vs control choosing a method key takeaway","nb":"many critical space depend on air moving in a predictable direction a laboratory should draw air in from the corridor an airborne infection isolation room should keep pathogen inside a cleanroom or protective environment room should push air out so contaminant cannot enter in each case the hvac system create a pressure difference between the room and its neighbour there are two main way to control that pressure difference flow offset also called volumetric offset or flow tracking and direct pressure control each has real strength and specific failure mode this guide explain both and how to choose what create room pressure a room pressure relative to its surrounding depend on the difference between air supplied and air removed and on how leaky the room is if exhaust exceed supply the shortfall must be made up by air leaking in through door gap crack and penetration and the room run negative the tighter the room the greater the pressure difference for a given flow imbalance the relationship between leakage flow and pressure is roughly that flow rise with the square root of pressure a tight room may reach 10 pa 0 04 in w c with a small offset while a leaky room may barely reach 2 pa with the same offset flow offset control how it work the controller measure or calculate total supply and total exhaust and maintain a fixed difference between them for a negative room exhaust equal supply plus the offset when a fume hood sash open and hood exhaust rise supply rise to match preserving the offset strength stable during door opening when a door open room pressure collapse toward zero but flow do not change air continue to move in the intended direction through the open door and the system doe not chase a pressure signal fast and predictable with fast acting valve the offset track change in hood exhaust within second no dependence on a very low pressure sensor flow based control avoid the difficulty of measuring a few pascal accurately weaknesse pressure is not directly contro"},{"k":"Guide","u":"/guides/shut-off-and-two-position-air-valves/","t":"Shut-off and two-position air valves","s":"Learn how two-position and shut-off air valves work, where they suit better than fully variable control, and how to design and test them for room isolation.","nh":"air valve and critical airflow control two position air valve how they work typical application advantage and limit shut off air valve purpose how tight is tight control and sequencing safe sequencing principle fail safe position integration with the bas testing and verification frequently asked question can a two position valve be converted to variable later is a shut off valve a fire damper do decontamination room alway need bubble tight damper key takeaway","nb":"not every critical space need fully modulating airflow many room operate in just two state occupied and unoccupied normal and isolation operating and decontaminating for these a two position air valve offer the accuracy and pressure independence of a venturi valve with simpler control when a room must be sealed off entirely a shut off valve add the ability to close tightly this guide explain how these valve work where they fit and what to test two position air valve how they work a two position valve is a pressure independent air valve often a venturi type with an actuator that move between two fixed position each position correspond to a calibrated flow because the valve is pressure independent each flow is held steady across the valve rated static pressure range the actuator may be electric using a simple open or closed signal or pneumatic using a solenoid to apply or vent air pressure the two flow are set at the factory or in the field during setup and position switche can confirm which state the valve is in typical application occupied and unoccupied setback a lab or classroom lab drop to a lower air change rate at night constant volume hood with setback a hood exhaust that drop to a reduced flow when the sash is closed or when the lab is unoccupied where the hazard assessment support it convertible isolation room a hospital room that switche between normal and negative pressure mode biosafety cabinet and equipment exhaust switching between an operating and a standby flow vivarium room changing flow between animal holding and procedure mode advantage and limit factor two position valve fully variable valve control complexity simple digital command analog or networked control flow state two fixed flow any flow within range cost lower higher energy saving capture major mode change capture continuous change suitability for vav hood limited required two position valve cannot track continuously changing demand like a vav fume hood where flow change frequently and unp"},{"k":"Guide","u":"/guides/venturi-air-valves/","t":"Venturi air valves explained","s":"Learn how a venturi air valve works, why it is pressure independent without a flow sensor, how it is controlled, and where it is used in critical spaces.","nh":"air valve and critical airflow control what a venturi valve look like how the valve control airflow setting the flow holding the flow when pressure change operating pressure range control option performance characteristic where venturi valve are used limitation and design caution frequently asked question do venturi valve need balancing can a venturi valve be used on a standard office vav system how long do they last key takeaway","nb":"a venturi air valve is a mechanical airflow control device used where the supply and exhaust airflow to a room must be held accurately and changed quickly it is the workhorse of laboratory vivarium and healthcare airflow control and is increasingly used in cleanroom and pharmaceutical facility its defining feature is that it hold a set airflow regardless of change in duct static pressure without relying on a velocity sensor this guide explain how that work how the valve is controlled and what owner and designer should know before specifying one what a venturi valve look like a venturi valve is a round short section of duct with a shaped internal restriction inside sit a cone assembly mounted on a shaft the cone is attached to a spring and the shaft can also be positioned by an actuator or a linkage typical component include a cylindrical body often with a narrowing venturi shaped section a cone or diffuser assembly that slide along a central shaft a calibrated spring sometime with a damping mechanism a shaft position linkage connected to an electric or pneumatic actuator or a fixed setting for constant volume valve a position feedback device on most variable volume model valve come in common round size such as 200 250 300 and 350 mm 8 10 12 and 14 in and are often ganged in dual triple or quad assembly to handle larger flow how the valve control airflow setting the flow the actuator position the cone along the shaft moving the cone change the open area between the cone and the valve body which set the nominal airflow each valve is characterized at the factory the manufacturer measure flow at many position and store a curve relating position to flow the controller use that curve to command the position needed for a given flow setpoint holding the flow when pressure change the spring loaded cone is the clever part when duct static pressure rise the higher pressure pushe the cone further into the venturi compressing the spring and reducing the open area when static pre"},{"k":"Guide","u":"/guides/venturi-valves-vs-vav-boxes-with-airflow-stations/","t":"Venturi valves vs VAV boxes with airflow stations","s":"Compare how venturi valves and sensor-based VAV terminals control airflow, where each performs best, and the questions to ask when choosing between them.","nh":"air valve and critical airflow control how each device achieve pressure independence venturi air valve vav terminal with an airflow station side by side comparison where the difference matter speed of response low flow accuracy fouling and corrosive exhaust energy installation and space choosing between them frequently asked question can a vav box match venturi valve speed are venturi valve alway more accurate is one easier to integrate with the bas key takeaway","nb":"when a laboratory hospital suite or cleanroom need variable airflow with tight room pressure control the design usually come down to two family of device venturi air valve and vav terminal or blade damper fitted with airflow measuring station both can be made pressure independent they get there in very different way and those difference show up in speed accuracy over time energy use and maintenance this guide compare the two honestly neither is right for every project and a well designed system of either type can perform well how each device achieve pressure independence venturi air valve a venturi valve use a spring loaded cone inside a shaped body the actuator set cone position which set the nominal airflow from a factory characterization curve when duct static pressure change the spring and cone move to compensate mechanically holding flow nearly constant across the valve rated pressure range there is no flow sensor and no flow control loop see venturi air valve explained for the detail vav terminal with an airflow station a vav terminal or damper assembly use a flow sensor commonly a multi point pitot array a cross flow sensor or a thermal dispersion probe to measure airflow a controller compare measured flow with setpoint and adjust the damper through a pid loop pressure independence is achieved by feedback when static pressure change flow change the sensor see it and the controller correct for terminal type see vav box type and selection side by side comparison factor venturi air valve vav with airflow station pressure compensation mechanical continuous closed loop control on measured flow response to duct pressure change effectively immediate depend on sensor and loop tuning often several second response to setpoint change commonly around 1 second typically several second to ten of second low flow accuracy set by characterization stable over time limited by sensor signal at low velocity sensor fouling risk none in airstream pitot port and thermal probe can fo"},{"k":"Guide","u":"/guides/vivarium-and-animal-facility-airflow-control/","t":"Vivarium and animal facility airflow control","s":"Learn the airflow requirements for animal holding and procedure rooms, how ventilated cage racks and air valves are integrated, and what to verify in a vivarium.","nh":"air valve and critical airflow control governing guidance key environmental requirement pressure relationship why air valve suit vivaria ventilated caging rack connection option temperature and humidity control reliability and alarm energy opportunity verification key takeaway","nb":"a vivarium or animal research facility place demand on hvac that combine those of a laboratory a hospital and a cleanroom the animal need stable temperature humidity and air quality because change in their environment can affect their welfare and the validity of research staff need protection from allergen and in some facility infectious agent clean area must be protected from soiled area and some room must be isolated from all other airflow control is central to meeting these need this guide cover the main requirement how air valve and ventilated caging are integrated and how to verify performance governing guidance in canada animal facility in research institution follow the guideline of the canadian council on animal care ccac including its guideline on laboratory animal facility many designer also refer to the guide for the care and use of laboratory animal national research council and facility working with infectious agent must meet the canadian biosafety standard building code provincial occupational health and safety regulation and the institution own standard also apply these document generally set performance outcome rather than prescribing a single design the institution animal care committee veterinarian and biosafety staff should help set design criteria key environmental requirement parameter typical approach note air change often 10 to 15 fresh air change per hour in animal room with lower rate possible where ventilated caging is used the nrc guide cite 10 to 15 ach as a general guideline ccac and institutional standard govern temperature narrow band suited to the specy with tight control rodent room commonly within about 20 to 26 c per the nrc guide specy specific range apply relative humidity typically 30 to 70 percent cold canadian winter require humidification pressure set by room function positive for clean barrier area negative for quarantine soiled and containment area defined in the facility pressure map outdoor air usually 100 percent outdoor"},{"k":"Guide","u":"/guides/cannabis-and-greenhouse-growing-facility-hvac/","t":"Cannabis and greenhouse growing facility HVAC","s":"Learn why moisture from plant transpiration dominates grow facility HVAC, how indoor rooms and greenhouses are conditioned, and what Canadian regulations mean for odour and air handling.","nh":"hvac by building type the moisture load vapour pressure deficit indoor grow room system lighting load greenhouse co2 enrichment and safety odour control and canadian regulation energy key takeaway","nb":"indoor growing facility whether licensed cannabis production site or vegetable and flower greenhouse push hvac system in way few other building do plant transpire most of the water they receive into the air grow light add intense heat and grower want tight control of temperature humidity and co2 around the clock since cannabis was legalized in canada in 2018 many facility have learned that undersized or poorly specified hvac lead directly to crop loss from mould and mildew this guide cover the core engineering issue for both sealed indoor grow room and greenhouse the moisture load the defining load in a grow room is latent moisture released by plant nearly all of the irrigation water delivered to plant apart from a small fraction retained in plant tissue and any runoff is transpired into the room air in a densely planted flowering room that can amount to many litre of water per hour this moisture must be removed continuously when light are on plant transpire heavily and the room also need a lot of sensible cooling when light turn off transpiration slow but continue and sensible load drop sharply without dedicated dehumidification the room temperature fall relative humidity climb and condition favour mould such as botrytis bud rot and powdery mildew see sensible and latent heat for background on how these load are calculated vapour pressure deficit grower often specify condition as vapour pressure deficit vpd rather than relative humidity alone vpd is the difference between the water vapour pressure the air could hold when saturated at leaf temperature and the vapour pressure actually present it drive transpiration growth stage typical cannabis practice typical air temperature typical rh typical vpd propagation and clone 24 to 27 c 75 to 81 f 65 to 80 0 4 to 0 8 kpa vegetative 22 to 28 c 72 to 82 f 55 to 70 0 8 to 1 2 kpa flowering 20 to 26 c 68 to 79 f 40 to 55 1 0 to 1 5 kpa late flowering and drying cooler vary lower vary vary these are illustrative range from com"},{"k":"Guide","u":"/guides/commercial-kitchen-ventilation-and-nfpa-96/","t":"Commercial kitchen ventilation and NFPA 96","s":"Learn how kitchen exhaust hoods, grease ducts, fans, fire suppression and make-up air work together, what NFPA 96 requires, and how to keep a kitchen system safe and balanced.","nh":"hvac by building type how the code framework fit together system component hood type i and type ii hood hood style and exhaust rate grease duct exhaust fan and termination fire suppression make up air demand control kitchen ventilation inspection and cleaning balancing and commissioning key takeaway","nb":"commercial kitchen ventilation remove heat smoke moisture and grease laden vapour from cooking it is also a fire safety system grease that collect in hood and duct is fuel and kitchen exhaust fire can spread quickly through a building if the system is poorly built or maintained for that reason commercial kitchen exhaust is governed by nfpa 96 ventilation control and fire protection of commercial cooking operation which is referenced by the national building code of canada and provincial code this guide explain how a kitchen ventilation system work the main nfpa 96 requirement and what owner and operator need to do to keep it safe and effective how the code framework fit together in canada several document interact national building code of canada nbc and provincial building code require commercial cooking ventilation system to conform to nfpa 96 national fire code of canada and provincial fire code address ongoing inspection cleaning and maintenance nfpa 96 set requirement for hood grease duct fan clearance fire suppression and maintenance ulc s646 cover listed exhaust hood and related control for commercial and institutional kitchen csa b149 1 govern gas appliance installation including interlock between gas appliance and ventilation in some jurisdiction ashrae standard 154 provide guidance on ventilation for commercial cooking operation including exhaust rate and energy topic the edition of nfpa 96 that apply depend on what the province has adopted the local building and fire official are the authority having jurisdiction system component a complete kitchen ventilation system include exhaust hood over the cooking appliance with grease filter or extractor grease duct from the hood to the exhaust fan exhaust fan usually on the roof fire suppression system protecting the hood duct and appliance make up air to replace exhausted air control that interlock fan make up air suppression and gas appliance hood type i and type ii hood hood type used for key feature type i ap"},{"k":"Guide","u":"/guides/fitness-centre-hvac/","t":"Fitness centre HVAC","s":"Learn why fitness centres need more ventilation and cooling than typical commercial space, how to design for workout areas, studios and locker rooms, and how to keep energy use under control.","nh":"hvac by building type why exercising people are a large load ventilation requirement demand controlled ventilation design temperature and humidity studio and specialty room locker room and shower odour noise converting existing space key takeaway","nb":"fitness center are often built in space designed for something else former retail unit office floor or warehouse bay the hvac that served a clothing store or an office is rarely adequate for a room full of people on treadmill and in spin classe exercising people release several time more heat and moisture than people sitting at desk and they notice immediately when a room is stuffy or too warm this guide cover the main design driver for gym studio and locker room whether in a standalone club a community recreation center or a corporate fitness room why exercising people are a large load metabolic heat output rise sharply with activity the ashrae handbook of fundamental tabulate heat gain from occupant by activity level approximate value activity approximate total heat gain per person latent share seated office work 115 to 130 w 390 to 450 btu h roughly 40 light bench work or walking 220 to 300 w 750 to 1 000 btu h roughly 60 to 65 athletic and heavy exercise 525 to 635 w 1 800 to 2 200 btu h roughly 60 a busy spin class of 30 people can therefore produce as much heat as a much larger office floor with a high proportion of it as moisture from sweat and breathing cardio equipment with motor and display add further load see internal heat gain from people lighting and equipment ventilation requirement ventilation is designed to ashrae 62 1 through part 6 of the nbc or the provincial code the standard assign high people based rate to exercise area space type ashrae 62 1 people outdoor air rate area outdoor air rate default occupant density health club aerobic room 10 l s per person 20 cfm 0 3 l s per m2 0 06 cfm ft2 40 per 100 m2 health club weight room 10 l s per person 20 cfm 0 3 l s per m2 0 06 cfm ft2 10 per 100 m2 value should be confirmed against the edition referenced by the governing code locker room and shower are typically handled through exhaust requirement rather than outdoor air rate see the ashrae 62 1 ventilation rate procedure for how these combine into s"},{"k":"Guide","u":"/guides/hospital-hvac-and-csa-z317-2/","t":"Hospital HVAC and CSA Z317.2","s":"Learn what CSA Z317.2 covers, how it shapes hospital HVAC design and operation, how it relates to ASHRAE 170, and what owners should plan for in new and renovated facilities.","nh":"hvac by building type what csa z317 2 is scope and structure relationship with ashrae 170 key design theme air movement from clean to less clean ventilation and air change filtration humidity reliability and redundancy outdoor air intake commissioning and verification construction and renovation in occupied hospital operation and maintenance frequently asked question doe csa z317 2 apply to long term care home and clinic is compliance required for renovation how often should critical room be tested key takeaway","nb":"hospital hvac system do far more than keep people comfortable they help control the spread of infection protect vulnerable patient support surgical procedure and keep critical area operating through equipment failure and power outage in canada the primary standard for these system is csa z317 2 special requirement for heating ventilation and air conditioning hvac system in health care facility this guide explain what the standard cover how it is applied and what owner designer and facility manager should expect when planning a new hospital a renovation or an upgrade to an existing system what csa z317 2 is csa z317 2 is a canadian standard developed by the csa group with input from engineer infection prevention and control specialist facility manager and health authority it set minimum requirement for the design construction commissioning operation and maintenance of hvac system in health care facility it has been revised several time and the edition that apply to a project is usually set by the provincial health authority the owner design standard or the building code adoption in that province it belong to a family of related csa standard including csa z8000 canadian health care facility which cover planning and design more broadly csa z317 1 covering special requirement for plumbing in health care facility csa z317 13 covering infection control during construction renovation and maintenance requirement vary by province and by health authority some jurisdiction mandate the standard directly other reference it through funding agreement or design guideline confirm which edition apply before design start scope and structure the standard addresse the whole life of the hvac system key area include area what it cover ventilation air change rate outdoor air rate and air movement by space type pressure relationship required direction of airflow between space temperature and humidity design range for each space type filtration minimum filter efficiency and arrangement by sp"},{"k":"Guide","u":"/guides/hotel-and-multi-unit-residential-hvac/","t":"Hotel and multi-unit residential HVAC","s":"Learn the common HVAC approaches for hotels and multi-unit residential buildings, how corridor and suite ventilation work, and the issues that cause most complaints from guests and residents.","nh":"hvac by building type which code apply in suite heating and cooling option ventilation strategy pressurized corridor system in suite heat recovery ventilator centralized ventilation with ducted supply compartmentalization and air leakage hotel specific consideration common problem found during testing key takeaway","nb":"hotel condominium and rental apartment building share a defining feature many small separately occupied unit stacked on top of each other each with its own occupant expecting individual control that shape everything from equipment selection to how odour noise and smoke move through the building the two building type differ in some important way hotel room turn over nightly and sit empty much of the time while apartment are occupied continuously by people who cook shower and do laundry but the underlying hvac problem are similar enough to treat together which code apply in canada multi unit residential building fall under different part of the building code depending on size part 9 house and small building building of three storey or less in building height and up to 600 m2 about 6 460 ft2 in building area ventilation follow section 9 32 which is prescriptive and residential in character part 3 and part 6 larger building including most hotel mid rise and high rise apartment part 6 require hvac system designed to good engineering practice with ventilation typically referencing ashrae 62 1 for common area for dwelling unit code and designer often refer to ashrae 62 2 or csa f326 for residential ventilation provincial code in alberta bc and ontario adopt the nbc structure with local amendment and energy requirement vary considerably bcs energy step code and toronto green standard for example push residential building toward much higher performance than the base code confirm specific with the authority having jurisdiction in suite heating and cooling option system typical application strength limitation packaged terminal air conditioner and heat pump ptac pthp hotel some rental low cost simple replacement individual control noisy through wall air leakage limited efficiency in deep cold vertical stacked fan coil with 2 or 4 pipe hydronic condo hotel rental quiet central plant efficiency 2 pipe system cannot heat and cool simultaneously water source heat pump on a common l"},{"k":"Guide","u":"/guides/ice-arena-hvac-and-dehumidification/","t":"Ice arena HVAC and dehumidification","s":"Learn why humidity control is the central HVAC problem in ice arenas, how dehumidification and low-emissivity ceilings prevent fog and dripping, and how to manage air quality and energy use.","nh":"hvac by building type why arena have moisture problem design condition dehumidification method low emissivity ceiling air quality resurfacer and combustion the ice plant and refrigeration safety heat recovery spectator and support area diagnosing problem in existing arena key takeaway","nb":"canada has thousand of indoor ice arena many owned by municipality and run on tight operating budget an arena is an unusual building a sheet of ice kept well below freezing sit inside an enclosure where spectator expect to be reasonably warm player generate heat and moisture and the roof structure above is exposed to cold radiation from the ice getting the hvac right is mostly a matter of controlling moisture when arena humidity is not controlled the result are obvious fog over the ice condensation dripping from the roof deck onto the playing surface soft or bumpy ice rusting steel and mould in the roof assembly why arena have moisture problem three thing combine in an arena a very cold surface the ice surface is typically maintained around 4 to 7 c 19 to 25 f depending on the use with hockey ice generally kept colder and harder than figure skating ice moisture source outdoor air brought in for ventilation people spectator and player and the flood water laid down by the ice resurfacer which is often hot water cold building surface the roof structure radiate heat to the cold ice so the underside of the roof deck can drop below the dew point of the arena air even when the air itself is above freezing whenever the air dew point is higher than the temperature of a surface moisture condense on that surface over the ice warm humid air cooled near the surface become fog on the roof deck it form condensation that drip onto the ice or freeze into frost that later melt a good grounding in psychrometric make the relationship clear design condition typical design target for community arena are parameter typical range ice surface temperature 4 to 7 c 19 to 25 f air temperature over ice 10 to 15 c 50 to 59 f spectator area temperature 10 to 15 c often with radiant heat at seating space dew point kept below the coldest building surface often about 0 to 4 c 32 to 39 f the key number is dew point not relative humidity holding the arena dew point a few degree below the coldest surfac"},{"k":"Guide","u":"/guides/indoor-pool-hvac-and-dehumidification/","t":"Indoor pool HVAC and dehumidification","s":"Learn how indoor pool natatoriums are dehumidified and ventilated, what temperatures and humidity to design for, and how to protect the building envelope and occupants from moisture and chloramines.","nh":"hvac by building type the evaporation load design temperature and humidity dehumidification approache ventilation and chloramine air distribution pressurization and the envelope material and corrosion operating consideration key takeaway","nb":"indoor pool are among the most punishing environment a building can contain large amount of water evaporate from the pool surface every hour the air is warm and humid and it carry chlorine compound that corrode metal and irritate swimmer eye and lung in a canadian winter that warm wet air sit just inside wall and roof that are well below freezing on the outside poorly designed or operated pool hvac lead to failure that are expensive and sometime dangerous condensation and mould inside wall corroded roof structure rotting window frame and air quality complaint this guide cover the principle behind a reliable natatorium system the evaporation load the main hvac load in a natatorium is moisture evaporating from the pool the evaporation rate depend on water surface area larger pool evaporate more water temperature and air condition evaporation is driven by the difference between the vapour pressure at the water surface and the vapour pressure in the air warmer water and drier air increase evaporation activity splashing wave water feature slide and swimmer increase the effective surface area an active leisure pool can evaporate far more than a quiet lap pool of the same size air velocity over the water the ashrae handbook application volume chapter on natatorium provide the standard evaporation equation and activity factor spa and hot tub have high evaporation rate relative to their size because of their high water temperature and agitation design temperature and humidity typical design condition follow ashrae guidance pool type typical water temperature typical air temperature relative humidity competition and lap pool 25 to 28 c 77 to 82 f 1 to 2 k above water 50 to 60 recreational and leisure pool 27 to 29 c 80 to 85 f 1 to 2 k above water 50 to 60 therapy pool 29 to 35 c 85 to 95 f 1 to 2 k above water within comfort limit 50 to 60 whirlpool and spa 36 to 40 c 97 to 104 f as for adjacent pool hall 50 to 60 keeping the air temperature slightly above the water temperat"},{"k":"Guide","u":"/guides/industrial-process-ventilation/","t":"Industrial process ventilation","s":"Learn how local exhaust and dilution ventilation protect workers in industrial facilities, how hoods and ducts are sized, and which Canadian regulations and standards apply.","nh":"hvac by building type regulation that apply hierarchy of control local exhaust ventilation hood and capture velocity duct transport velocity air cleaning and discharge dilution ventilation make up air testing and maintenance key takeaway","nb":"industrial facility generate airborne contaminant that ordinary comfort hvac cannot handle welding fume solvent vapour metal and wood dust mist from machining and heat from furnace and oven industrial process ventilation remove these at the source or dilute them to safe level protecting worker and in many case preventing fire and explosion this guide cover the core concept used to design and evaluate industrial ventilation system in canada the standard practical reference throughout north america is the acgih manual industrial ventilation a manual of recommended practice for design which most of the typical value below come from regulation that apply in canada workplace exposure to airborne contaminant is regulated provincially or federally for federally regulated workplace each province set occupational exposure limit oel commonly based on acgih threshold limit value though some province set their own the employer is responsible for keeping exposure below these limit relevant regulation and standard include provincial occupational health and safety regulation such as the alberta ohs code bcs occupational health and safety regulation administered by worksafebc and ontario regulation under the occupational health and safety act the national building code and national fire code and provincial version for building fire separation and hazardous process requirement nfpa 91 for exhaust system conveying vapour mist and particulate solid nfpa 652 and related standard such as nfpa 654 and nfpa 664 for combustible dust hazard fire code in many jurisdiction reference these nfpa 33 for spray finishing operation csa z94 4 where respiratory protection is used as a supplementary control requirement vary by province and by authority having jurisdiction so the regulatory basis should be confirmed at the start of every project hierarchy of control ventilation is an engineering control which sit above administrative control and personal protective equipment in the hierarchy of control"},{"k":"Guide","u":"/guides/isolation-rooms-negative-and-positive-pressure/","t":"Isolation rooms: negative and positive pressure","s":"Learn the difference between airborne infection isolation and protective environment rooms, the key HVAC parameters for each, and how to verify they are working.","nh":"hvac by building type the two room type airborne infection isolation room protective environment room key design parameter room construction matter anteroom airflow within the room exhaust discharge monitoring and alarm control switchable room surge capacity testing and verification key takeaway","nb":"isolation room use air pressure to control where airborne particle go there are two basic type and they do opposite job a negative pressure room keep infectious particle from leaving the room a positive pressure room keep contaminant from entering mixing them up or letting either lose its pressure defeat the purpose this guide explain both room type the hvac parameter that define them how anteroom fit in and how owner can confirm the room are working in canada design is governed by csa z317 2 with ashrae standard 170 as a common reference the two room type airborne infection isolation room an airborne infection isolation room aiir house patient with disease spread by airborne particle such as tuberculosis measle or varicella the room is kept at negative pressure relative to the corridor so air flow into the room through door gap and is exhausted outdoor infectious particle are diluted by high air change rate and removed protective environment room a protective environment pe room house severely immunocompromised patient such as some transplant or oncology patient the room is kept at positive pressure so air flow out to the corridor and supply air passe through hepa filter fungal spore and other contaminant in corridor air are kept out key design parameter the value below reflect ashrae 170 csa z317 2 govern in canada and its requirement should be confirmed for the edition that apply as well as any additional health authority requirement parameter aiir pe room pressure relationship negative to adjacent space positive to adjacent space minimum pressure differential 2 5 pa 0 01 in w c 2 5 pa 0 01 in w c minimum total air change 12 ach 12 ach minimum outdoor air 2 ach 2 ach exhaust directly outdoor not recirculated return may be recirculated supply filtration per standard for patient room hepa pressure monitoring continuous monitoring with alarm continuous monitoring with alarm room construction sealed ceiling sealed penetration self closing door same owner often design"},{"k":"Guide","u":"/guides/laboratory-hvac-and-fume-hood-exhaust/","t":"Laboratory HVAC and fume hood exhaust","s":"Learn how lab HVAC systems protect occupants, the types of fume hoods and how they are exhausted, the standards that apply in Canada, and the key design and testing checks.","nh":"hvac by building type standard that apply primary and secondary containment fume hood type face velocity and hood location room airflow fume hood exhaust duct material construction exhaust fan and stack energy in lab building testing and certification key takeaway","nb":"laboratory hvac is first a safety system it must capture and remove hazardous fume at their source dilute any release in the room prevent contaminant from spreading to other space and discharge exhaust where it will not return comfort and energy efficiency matter too but they come after safety this guide give an overview of lab hvac and fume hood exhaust for owner facility manager and designer related article cover laboratory airflow control system and manifolded lab exhaust system in more depth standard that apply several standard guide lab ventilation in canada csa z316 5 fume hood and associated exhaust system cover design installation and testing of fume hood and their exhaust ansi assp z9 5 laboratory ventilation is widely used and introduce the laboratory ventilation management program nfpa 45 fire protection for laboratory using chemical addresse fire safety including hood exhaust requirement ashrae standard 110 set the method of testing fume hood performance the national building code of canada and provincial building and fire code govern fire separation exhaust and ventilation the canadian biosafety standard apply to lab handling biological agent provincial occupational health and safety regulation also apply and many institution have their own lab design standard primary and secondary containment lab ventilation provide two level of protection primary containment capture contaminant at the source mainly through fume hood biosafety cabinet snorkel and other local exhaust secondary containment rely on room airflow dilution by air change and negative pressure so that any escaped contaminant stay in the lab and are exhausted primary containment is the most important general room air change cannot make up for a hood that fail to capture fume hood type hood type how it work typical consideration constant volume conventional fixed exhaust face velocity rise as sash close simple energy intensive high face velocity at low sash constant volume bypass bypass opening "},{"k":"Guide","u":"/guides/long-term-care-home-hvac/","t":"Long-term care home HVAC","s":"Learn how HVAC systems in long-term care homes protect frail residents, which Canadian standards apply, and how to plan for cooling, infection control and power outages.","nh":"hvac by building type which standard apply thermal comfort for older adult cooling is now essential ventilation and infection control odour control humidity resilience and emergency power maintenance and verification key takeaway","nb":"long term care home house some of the most vulnerable people in canada older adult many with dementia chronic illness and limited mobility who live in the building full time and depend on staff for most of their care the hvac system in a long term care home is part home comfort system part health care infrastructure the covid 19 pandemic and recent extreme heat event exposed weaknesse in many older home including shared room without adequate ventilation and building without air conditioning design expectation and provincial requirement have changed significantly as a result which standard apply long term care home are regulated provincially both through building code and through the provincial ministry responsible for long term care relevant document include the national building code and provincial building code which classify most long term care home as care occupancy group b division 3 with specific fire safety and hvac implication csa z8004 long term care home operation and infection prevention and control published in 2022 which addresse operation and infection control in long term care including the built environment csa z317 2 special requirement for heating ventilation and air conditioning hvac system in health care facility its scope cover health care facility generally and many province and funder apply it in whole or in part to long term care see hospital hvac and csa z317 2 provincial design manual such as ontario long term care home design manual which set expectation for room configuration ventilation and environmental condition for funded home ashrae 62 1 and ashrae 170 referenced for ventilation in some jurisdiction and project requirement differ considerably by province and by funding program the first step on any project is confirming which document the ministry the authority having jurisdiction and the owner require thermal comfort for older adult older adult tend to be less able to regulate body temperature may not feel heat or cold reliably and "},{"k":"Guide","u":"/guides/museum-and-archive-environmental-control/","t":"Museum and archive environmental control","s":"Learn how museums and archives control temperature, humidity and air quality to protect collections, how ASHRAE control classes work, and how to balance preservation with a Canadian building envelope.","nh":"hvac by building type how collection are damaged ashrae control classe the canadian winter problem system design storage and archive monitoring and verification key takeaway","nb":"museum gallery archive and library use hvac for a purpose most building do not protecting object painting wooden furniture paper photograph textile and natural history specimen all respond to temperature and humidity some crack or warp when humidity swing some corrode or grow mould when it is too damp and some like film and certain plastic deteriorate chemically at a rate that roughly double with every few degree of temperature increase designing these system in canada add another layer because maintaining museum level humidity in a cold winter can damage the building itself how collection are damaged the canadian conservation institute cci describe ten agent of deterioration several are directly influenced by hvac incorrect relative humidity too high above roughly 65 to 75 percent lead to mould and corrosion too low cause some material to shrink and crack rapid fluctuation cause mechanical stress in composite object such as panel painting and furniture incorrect temperature high temperature accelerate chemical decay temperature also drive rh change in display case and storage pollutant outdoor pollutant such as ozone nitrogen oxide and sulphur dioxide as well as indoor pollutant off gassing from building material display case and other object light and ultraviolet radiation not directly hvac but daylighting design and glazing affect both light exposure and thermal load the goal is not a single perfect number modern conservation guidance focuse on avoiding damaging extreme and limiting short term fluctuation which often cause more harm than a stable but slightly different set point ashrae control classe the ashrae handbook application volume chapter on museum gallery archive and library define climate control classe that describe how tightly temperature and rh are held the chapter is the standard reference for designer in north america in simplified term class general description typical use aa precision control small short term fluctuation no seasonal rh change mos"},{"k":"Guide","u":"/guides/office-building-hvac/","t":"Office building HVAC","s":"Learn how office HVAC systems are designed and operated, how to choose between system types, and what owners should watch for during fit-outs and over the building's life.","nh":"hvac by building type what drive office hvac load ventilation common office system type the shift toward decoupled system comfort target tenant fit out energy performance frequently asked question why is my office too cold in summer should we reduce ventilation when the office is half empty key takeaway","nb":"office building make up a large share of canada commercial floor space from three storey suburban building to downtown tower in toronto calgary and vancouver their hvac system look straightforward on paper keep people comfortable during business hour and supply enough outdoor air in practice office are where most comfort complaint tenant dispute and avoidable energy waste happen this guide cover the main design driver the system commonly used and the operational issue that matter most to owner and property manager what drive office hvac load office load are dominated by the building envelope at the perimeter and by internal gain in the core perimeter zone typically the outer 4 to 5 m 13 to 16 ft from the exterior wall see solar gain conduction through glazing and winter heat loss a south or west perimeter office can need cooling on a sunny january afternoon while a north office on the same floor need heat interior zone see only internal gain from people lighting and equipment they need cooling almost year round even in a canadian winter internal gain have dropped significantly over the past two decade as led lighting and laptop replaced fluorescent fixture and desktop tower older design assumption of 15 to 20 w m2 1 4 to 1 9 w ft2 for plug load are often higher than actual measured load in modern office because of these difference good zoning separate perimeter from core and separate each exposure a single thermostat serving both a glass corner office and an interior meeting room will satisfy neither ventilation office ventilation is designed to ashrae 62 1 through part 6 of the nbc or the provincial building code for office space the standard specify 2 5 l s per person 5 cfm plus 0 3 l s per m2 0 06 cfm ft2 with a default density of 5 people per 100 m2 conference room are much denser and need roughly three to four time the outdoor air per unit area of open office because actual occupancy in many office now vary widely from day to day with hybrid work demand control"},{"k":"Guide","u":"/guides/operating-room-hvac-design/","t":"Operating room HVAC design","s":"Learn how operating room HVAC systems protect the surgical field, the design parameters set by CSA Z317.2 and ASHRAE 170, and what to verify at commissioning.","nh":"hvac by building type design goal typical design parameter airflow pattern unidirectional supply over the table low return interference from light and equipment pressurization temperature and humidity control filtration reliability unoccupied setback commissioning and verification frequently asked question do operating room need hepa filter can operating room use 100 percent outdoor air why doe humidity matter in surgery key takeaway","nb":"an operating room hvac system is part of the surgical environment it deliver clean air over the surgical site dilute airborne particle shed by staff keep contaminant from entering from corridor and hold temperature and humidity at level suited to both patient and surgical team it must do this reliably day after day often with little margin for downtime this guide cover the core design principle typical parameter and the check that confirm an operating room perform as intended in canada csa z317 2 govern health care hvac as outlined in hospital hvac and csa z317 2 and ashrae standard 170 is a common reference design goal an operating room hvac system aim to supply clean filtered air directly over the surgical field sweep airborne particle away from the patient and toward return keep the room positive to adjacent corridor and space maintain temperature and humidity within a defined range with surgeon adjustable setpoint provide high reliability and maintain condition during equipment failure keep noise and draft at acceptable level for the surgical team typical design parameter the value below reflect ashrae 170 and are widely used as a starting point csa z317 2 set the governing requirement in canada and some of its value differ so confirm against the edition that apply to the project parameter typical value ashrae 170 note total air change minimum 20 ach many design use more to meet cooling load outdoor air minimum 4 ach often higher in practice pressure positive to adjacent space achieved by supply exceeding return and exhaust temperature adjustable about 20 to 24 c 68 to 75 f some procedure need lower or higher setpoint relative humidity maximum 60 percent with a lower limit set by the standard humidification needed in canadian winter air recirculation permitted through the central system with high efficiency filtration room level recirculating unit restricted final filtration high efficiency per the standard hepa used for some procedure and by owner choice airflo"},{"k":"Guide","u":"/guides/places-of-worship-and-assembly-spaces/","t":"Places of worship and assembly spaces","s":"Learn how to heat, cool and ventilate places of worship and other assembly spaces that sit empty most of the week and fill to capacity for a few hours, often in tall or historic buildings.","nh":"hvac by building type the intermittent occupancy challenge ventilation tall space and stratification noise pipe organ artwork and historic finishe pre conditioning and setback other assembly space control key takeaway","nb":"place of worship community hall auditorium and theatre share an unusual load profile they may sit empty or lightly used for most of the week then fill with hundred of people for a service concert or event lasting a few hour many have tall ceiling large window and heavy masonry construction some are historic building with irreplaceable finishe organ and artwork designing hvac for these space is less about peak efficiency and more about delivering comfort quickly when people arrive keeping quiet during service and performance and not wasting energy on an empty building the rest of the week the intermittent occupancy challenge a typical worship space might be used for a few hour on one or two day a week with smaller room used for meeting classe and community program on other day this affect every design decision pre conditioning the space must reach comfortable condition before people arrive heavy masonry building take a long time to warm up from a deep setback peak occupancy load a full sanctuary or hall generate a large burst of heat moisture and co2 within minute low annual operating hour expensive high efficiency equipment may take a long time to pay back compared with building occupied full time volunteer operation many congregation and community group rely on volunteer to set schedule and operate equipment so control must be simple and preferably remotely accessible ventilation ashrae 62 1 list place of religious worship with a people outdoor air rate of 2 5 l s per person 5 cfm plus an area rate of 0 3 l s per m2 0 06 cfm ft2 at a default density of 120 people per 100 m2 auditorium and theatre have similar rate for a 400 m2 4 300 ft2 sanctuary seating 480 people that work out to roughly 1 300 l s 2 700 cfm of outdoor air at full occupancy because full occupancy is rare demand controlled ventilation with co2 sensor is a natural fit it ramp outdoor air up during service and back down during smaller gathering without relying on volunteer to change setting many olde"},{"k":"Guide","u":"/guides/retail-and-shopping-centre-hvac/","t":"Retail and shopping centre HVAC","s":"Learn how HVAC is designed for standalone stores, strip plazas and enclosed malls, including the landlord and tenant split, entrance control, food service exhaust and common energy pitfalls.","nh":"hvac by building type the landlord and tenant split load in retail space grocery store rooftop unit entrance and building pressure food court and restaurant enclosed mall common area energy opportunity frequently asked question who pay for hvac replacement in a retail lease why are the checkout lane alway cold key takeaway","nb":"retail building range from a single store in a strip plaza to enclosed regional shopping center with hundred of tenant a food court and a cinema the hvac challenge differ with scale but some theme are constant high and variable occupancy large door opening heavy lighting in older store long operating hour and a split of responsibility between landlord and tenant that shape almost every design decision the landlord and tenant split in most canadian retail property responsibility for hvac is divided by the lease typical arrangement include strip plaza and power center each tenant has one or more dedicated rooftop unit owned or maintained by the tenant or by the landlord with cost recovered through common area maintenance charge enclosed mall the landlord operate central system for common area such as concourse washroom and food court tenant may receive chilled water condenser water or heating hot water from the base building or they may install their own rooftop unit anchor store large department store and grocer usually operate independently with their own system the lease and the landlord tenant design criteria define what the tenant receive tonnage allowance connection point exhaust provision and control integration requirement weak tenant criteria are a frequent source of long term problem such as tenant adding undersized unit or kitchen exhaust without make up air load in retail space retail load vary widely by tenant type space type main load note general merchandise lighting people envelope led retrofit have cut lighting load substantially grocery refrigerated case people lighting display case remove heat and moisture from the sale floor electronic display equipment lighting higher plug load than typical retail food court and restaurant cooking equipment people exhaust and make up air dominate the design mall concourse skylight people solar gain through skylight can be large occupant density vary sharply by time of day and season ashrae 62 1 list a default of 1"},{"k":"Guide","u":"/guides/school-hvac-design/","t":"School HVAC design","s":"Learn what drives HVAC design in K-12 schools, from classroom ventilation and noise limits to system selection, controls and the realities of tight school budgets.","nh":"hvac by building type ventilation drive the design co2 as a performance indicator acoustic common system type heating in cold climate gymnasium theatre and special space summer use and cooling control and operation frequently asked question do school in canada have to meet ashrae 62 1 are portable hepa filter a substitute for ventilation key takeaway","nb":"school are some of the most demanding building an hvac designer work on classroom pack 25 to 30 people into a modest floor area occupancy swing from full to empty several time a day and the building sit largely unused for two month each summer add tight capital budget small maintenance staff and the fact that the occupant are children who cannot adjust a thermostat or open a window on their own and the design priority become clear a good school system deliver enough outdoor air to keep student alert stay quiet enough for teaching heat reliably through a prairie or northern ontario winter and is simple enough for a district maintenance crew to keep running for 30 year ventilation drive the design in most canadian jurisdiction mechanical ventilation in school is designed to ashrae standard 62 1 through the reference in part 6 of the national building code nbc or the provincial equivalent the ventilation rate procedure combine a per person rate with a per area rate space type ashrae 62 1 people outdoor air rate area outdoor air rate default occupant density classroom age 5 to 8 5 l s per person 10 cfm 0 6 l s per m2 0 12 cfm ft2 25 per 100 m2 classroom age 9 and up 5 l s per person 10 cfm 0 6 l s per m2 0 12 cfm ft2 35 per 100 m2 science laboratory 5 l s per person 10 cfm 0 9 l s per m2 0 18 cfm ft2 25 per 100 m2 multi use assembly 3 8 l s per person 7 5 cfm 0 3 l s per m2 0 06 cfm ft2 100 per 100 m2 value should alway be confirmed against the edition of 62 1 referenced by the governing code for a typical 75 m2 800 ft2 classroom with 28 student and a teacher the breathing zone outdoor air work out to roughly 190 l s 400 cfm before applying zone air distribution effectiveness and system ventilation efficiency that is a lot of cold air to heat in january which is why energy recovery matter so much in canadian school see our guide on the ashrae 62 1 ventilation rate procedure for the full calculation co2 as a performance indicator carbon dioxide concentration is a useful "},{"k":"Guide","u":"/guides/warehouse-and-distribution-centre-heating-and-ventilation/","t":"Warehouse and distribution centre heating and ventilation","s":"Learn the practical options for heating and ventilating large warehouses and distribution centres in a cold climate, and how to handle dock doors, forklift emissions and sprinkler freeze protection.","nh":"hvac by building type what drive warehouse heating load typical setpoint heating system option radiant heating direct fired heating destratification ventilation dock door cooling energy opportunity key takeaway","nb":"warehouse and distribution center are large tall and lightly occupied but they still need to be heated through canadian winter and ventilated for the people and vehicle working inside with clear height of 10 to 12 m 32 to 40 ft or more dozen of dock door and floor area measured in hectare the heating strategy has a major effect on operating cost this guide cover the main heating system ventilation requirement and the detail that cause problem in practice what drive warehouse heating load unlike office warehouse load are dominated by the envelope and by air entering the building roof and wall losse a large roof area mean envelope insulation level matter a lot energy code set minimum insulation for heated warehouse though requirement vary by province and by whether the space is classed as semi heated infiltration through dock door each time a dock door open without a sealed trailer cold outdoor air pour in in a busy cross dock facility this can be the largest single heating load ventilation air required outdoor air for occupant and to dilute forklift emission stratification warm air rise so temperature near a 12 m roof can be 5 to 10 k higher than at floor level with conventional forced air heating increasing roof losse internal gain from people and lighting are small though conveyor motor and battery charger add some heat a sound heating load calculation should account for door operation not just steady state envelope losse typical setpoint warehouse temperature are usually set to protect good and provide reasonable working condition rather than office comfort area typical winter setpoint general storage unoccupied 5 to 10 c 41 to 50 f or as stored good require active picking and storage area 13 to 16 c 55 to 61 f shipping and receiving dock 10 to 15 c 50 to 59 f office lunchroom washroom 20 to 22 c 68 to 72 f sprinklered area with wet pipe system must be kept at or above 4 c 40 f under nfpa 13 which set the absolute minimum for most heated warehouse some stored prod"},{"k":"Guide","u":"/guides/ashrae-90-1-vs-necb/","t":"ASHRAE 90.1 vs NECB","s":"Learn the practical differences between ASHRAE Standard 90.1 and the NECB, how their compliance paths and modelling rules work, and which one applies to a Canadian project.","nh":"code and standard in canada who publishe them and how often where each apply in canada structure climate zone compliance path prescriptive path trade off path performance path hvac provision compared necb 2020 tier choosing between them key takeaway","nb":"two document dominate energy efficiency requirement for larger commercial and institutional building in canada ashrae standard 90 1 energy standard for site and building except low rise residential building and the national energy code of canada for building necb depending on the province and the project a designer may be required to use one allowed to choose between them or asked to use one for code compliance and the other for a green building rating they aim at the same goal and cover similar ground but their structure climate definition and modelling rule differ in way that matter to hvac design who publishe them and how often feature ashrae 90 1 necb publisher ashrae co sponsored by ies national research council of canada update cycle about every three year 2016 2019 2022 and so on about every five year 2011 2015 2017 2020 2025 legal status voluntary standard unless adopted or referenced model code that become law when adopted primary market united state used internationally canada unit inch pound and si edition si because necb edition come out less often and province adopt them later still the edition in force in canada may lag the newest version of either document by several year where each apply in canada province adopting the necb many province including alberta use the necb for building outside the scope of part 9 british columbia the bc building code allow compliance with either the necb or ashrae 90 1 edition it reference or through the performance based energy step code ontario supplementary standard sb 10 set compliance path based on ashrae 90 1 or the necb with ontario specific modification green building program leed project in canada have historically been able to use ashrae 90 1 appendix g or a canadian alternative compliance path based on the necb for energy performance credit depending on the rating system version see provincial building code and hvac for more on how each province apply them structure both document follow similar subject division"},{"k":"Guide","u":"/guides/ashrae-standard-170-for-healthcare-ventilation/","t":"ASHRAE Standard 170 for healthcare ventilation","s":"Learn what ASHRAE Standard 170 requires for healthcare ventilation, how to read its design tables, and where Canadian projects follow CSA Z317.2 instead.","nh":"code and standard in canada what standard 170 cover reading the ventilation table typical value for key space pressure relationship and differential pressure filtration requirement standard 170 and csa z317 2 in canada applying the standard on a project frequently asked question is ashrae standard 170 mandatory in canada doe standard 170 apply to medical clinic how is compliance verified key takeaway","nb":"ansi ashrae ashe standard 170 ventilation of health care facility is the most widely cited north american document for healthcare hvac design it set minimum air change rate outdoor air quantity pressure relationship filtration and temperature and humidity range for space from operating room to patient bedroom many hospital owner design team and infection prevention staff use it as a shared reference in canada the picture is a little different the governing national standard for healthcare hvac is csa z317 2 special requirement for heating ventilation and air conditioning hvac system in health care facility and most provincial health authority require it standard 170 still matter here designer use it for comparison us based equipment vendor and consultant work from it and some private clinic and outpatient facility reference it this guide explain what standard 170 contain how its table are used and how to handle it alongside z317 2 what standard 170 cover standard 170 apply to hospital outpatient facility nursing home and similar healthcare occupancy it is developed jointly with the american society for health care engineering ashe and is incorporated by reference into the fgi guideline for design and construction used across the united state the standard is maintained under continuous revision with new edition and addenda published every few year so alway confirm which edition a project or contract cite its main content fall into four area design requirement for space ventilation set out in a large table listing each space type with its required value system requirement such as filtration efficiency for different space category outdoor air intake separation from exhaust source and humidification and duct lining limit specific space with extra rule including operating room airborne infection isolation aii room protective environment pe room and pharmacy compounding area planning and commissioning expectation including the use of an infection control risk assessment d"},{"k":"Guide","u":"/guides/accessibility-and-hvac-controls/","t":"Accessibility and HVAC controls","s":"Learn which accessibility requirements apply to HVAC controls in Canadian buildings, how to locate and specify user controls, and where the rules vary by province.","nh":"code and standard in canada where the requirement come from what count as a control key design requirement mounting height clear floor space and approach operation visibility and feedback balancing accessibility with sensor accuracy residential and multi unit building checking accessibility during construction frequently asked question do all thermostat need to be at accessible height are app based control enough who is responsible for thermostat location key takeaway","nb":"most of the hvac system is hidden in ceiling and mechanical room but some of it is meant to be touched thermostat override button fan speed switche operable window control and room temperature setpoint adjuster are all user control and in canada they fall under accessibility requirement in the building code and related standard getting this right is not difficult but it is often overlooked because the hvac designer the control contractor and the architect each assume someone else is handling it this guide explain the requirement that typically apply how they interact with good sensor placement and how to coordinate control so they work for everyone who use the building where the requirement come from accessibility in canadian building is governed by several overlapping document national building code of canada nbc section 3 8 accessibility which set requirement for accessible route washroom and control in building within its scope provincial building code which adopt the nbc with change ontario building code has its own barrier free provision british columbia has adopted updated accessibility requirement and quebec construction code has its own text csa b651 accessible design for the built environment a detailed technical standard referenced by many code government owner and institution accessibility legislation such as the accessibility for ontarian with disability act aoda the accessible canada act for federally regulated organization and similar provincial act in manitoba nova scotia british columbia and elsewhere owner standard particularly for university hospital and government building which often exceed the code requirement vary by province and by building type and edition change treat the authority having jurisdiction and the project accessibility consultant if there is one as the final word what count as a control code generally apply accessibility rule to control that are intended to be operated by occupant for hvac this usually include room thermostat and"},{"k":"Guide","u":"/guides/csa-b149-gas-installations-and-hvac-equipment/","t":"CSA B149 gas installations and HVAC equipment","s":"Learn how the CSA B149 series applies to boilers, furnaces, rooftop units, unit heaters and make-up air units, and what designers and owners need to know about venting, air supply and approvals.","nh":"code and standard in canada the b149 family who enforce it appliance approval venting appliance venting category vent termination common venting air supply for combustion and ventilation direct fired equipment clearance access and location gas piping commissioning and inspection key takeaway","nb":"most canadian commercial building still burn natural gas or propane somewhere in boiler furnace rooftop unit unit heater radiant heater make up air unit or water heater every one of these installation is governed by the csa b149 sery of code for hvac designer b149 affect equipment location venting combustion and ventilation air clearance and gas piping for owner it determine who can do the work and what has to be inspected this guide give an overview of how b149 apply to hvac equipment it is not a substitute for the code or for a licensed gas fitter the b149 family standard scope csa b149 1 natural gas and propane installation code appliance equipment piping venting and air supply csa b149 2 propane storage and handling code csa b149 3 code for the field approval of fuel related component on appliance and equipment csa b149 5 installation code for propane fuel system and tank on highway vehicle csa b149 6 code for digester gas landfill gas and bioga generation and utilization b149 1 is the one that affect hvac most directly it is updated on a regular cycle the 2025 edition was published in early 2025 and province adopt edition on their own schedule who enforce it gas safety is provincially regulated b149 1 is adopted through provincial legislation and enforced by safety authority and inspector alberta under the safety code act with gas permit issued by accredited municipality or agency british columbia technical safety bc under the safety standard act ontario the technical standard and safety authority tssa under the technical standard and safety act and its fuel regulation province may amend b149 1 and they license gas fitter and gas technician in classe that limit the input rating of equipment each class may work on a permit is generally required before installing or altering a gas appliance or gas piping see provincial building code and hvac appliance approval b149 1 require gas appliance to be certified by an accredited certification organization to the applicab"},{"k":"Guide","u":"/guides/csa-b52-mechanical-refrigeration-code/","t":"CSA B52 mechanical refrigeration code","s":"Learn how CSA B52 governs refrigeration and air conditioning systems in Canada, how refrigerant quantity limits are checked, when a machinery room is needed and what the 2023 edition changed.","nh":"code and standard in canada how b52 become law the three classification occupancy classification system classification refrigerant safety group quantity limit in occupied space a2l refrigerant and the 2023 edition machinery room installation testing and inspection practical tip key takeaway","nb":"csa b52 mechanical refrigeration code is the canadian standard for the safe design construction installation operation and inspection of refrigeration system it cover far more than industrial refrigeration plant chiller rooftop unit split system vrf heat pump and data center cooling all contain refrigerant and b52 determine how much refrigerant can be used where equipment can go and what safety measure are required the code matter more now than it did a decade ago the phase down of high gwp hfc refrigerant is pushing the industry toward mildly flammable a2l refrigerant and toward natural refrigerant such as co2 ammonia and hydrocarbon each with safety consideration that b52 addresse how b52 become law like the national model code b52 is a voluntary standard until adopted province adopt it through their pressure equipment boiler and refrigeration or safety standard legislation and building code reference it for refrigeration system administering authority include tssa in ontario technical safety bc and absa in alberta among other the current edition is csa b52 23 province have adopted it on different date ontario tssa for example adopted it effective october 2024 some jurisdiction may still enforce the previous edition so confirm which apply before design see provincial building code and hvac the three classification applying b52 start with three question what kind of occupancy what kind of system and what kind of refrigerant occupancy classification b52 classify space by how easily occupant can recognize and escape a refrigerant leak category include institutional occupancy such as hospital and care home where people may not be able to leave on their own public assembly residential commercial large mercantile industrial and mixed occupancy institutional occupancy have the most restrictive limit system classification system are classified by the probability that a leak will reach an occupied space high probability system refrigerant containing part are located in or "},{"k":"Guide","u":"/guides/fire-dampers-and-smoke-control-under-canadian-codes/","t":"Fire dampers and smoke control under Canadian codes","s":"Learn the difference between fire dampers, smoke dampers and fire stop flaps, where the NBC requires them, how installation affects performance, and what ongoing inspection and testing involves.","nh":"code and standard in canada the three device where the code require them fire damper smoke damper fire stop flap installation matter interaction with fan shutdown and fire alarm inspection and testing in existing building renovation frequently asked question can a fire damper be installed without an access door are smoke detector in duct the same as smoke damper key takeaway","nb":"ductwork is a potential highway for fire and smoke every time a duct passe through a fire rated wall or floor it create an opening in a barrier that the building code rely on to contain a fire fire damper smoke damper and fire stop flap close those opening when needed they are simple device but they are installed out of sight often in hard to reach location and they only work if they are correctly installed and periodically tested this guide explain the device where canadian code require them and how owner can keep them working the three device device purpose how it close canadian standard fire damper maintain the fire resistance rating of a fire separation where a duct passe through usually a fusible link that melt at about 74 c 165 f releasing a spring or gravity closed blade curtain can ulc s112 smoke damper leakage rated damper limit the movement of smoke through duct as part of a smoke control or containment strategy motorized actuator closing on signal from smoke detector or the fire alarm system can ulc s112 1 fire stop flap protect opening in the ceiling membrane of a fire rated floor ceiling or roof ceiling assembly such as at diffuser fusible link and hinged insulated flap can ulc s112 2 combination fire and smoke damper meet both fire damper and smoke damper requirement in one assembly they typically use a heat responsive device plus an actuator controlled by the fire alarm system dynamic fire damper are rated to close against airflow so they are used where fan may still be running when the damper close static fire damper are only for system that shut down on fire alarm using a static damper in a system that keep running can result in a damper that doe not close fully where the code require them requirement come mainly from part 3 of the national building code nbc and the provincial code based on it the exact provision should be read from the edition in force but in general fire damper fire damper are required where a duct penetrate a fire separation that"},{"k":"Guide","u":"/guides/mechanical-permits-and-engineering-seals-in-canada/","t":"Mechanical permits and engineering seals in Canada","s":"Learn who regulates engineers in each province, when mechanical drawings must be sealed, how permits and letters of assurance work, and what owners and contractors should expect during construction.","nh":"code and standard in canada who regulate engineer what an engineering seal mean when mechanical design must be sealed province specific practice alberta british columbia ontario permit field review during construction delegated design practical advice for owner key takeaway","nb":"most commercial hvac work in canada need some form of permit and much of it need drawing sealed by a professional engineer owner are sometime surprised by this especially for project that seem small like replacing rooftop unit or adding cooling to a server room contractor sometime find that a design they built in one province is not accepted in another this guide explain how professional engineering regulation and permitting work for mechanical system in canada with a focus on alberta british columbia and ontario requirement differ by province and municipality so the authority having jurisdiction ahj alway has the final word who regulate engineer engineering is a self regulated profession in canada governed separately in each province and territory to practise engineering or to seal drawing in a province an engineer must be licensed by that province regulator a licence in ontario doe not allow someone to seal drawing for a project in alberta province regulator firm level authorization alberta apega association of professional engineer and geoscientist of alberta permit to practice british columbia engineer and geoscientist bc permit to practice required for firm since 2021 ontario professional engineer ontario peo certificate of authorization in addition to individual licensing firm offering engineering service to the public must hold the appropriate firm authorization each regulator set rule for the use of seal document authentication and the obligation to practise only within one competence what an engineering seal mean when a professional engineer seal a drawing specification or report they are taking professional responsibility for it the seal indicate the document was prepared by the engineer or under their direct supervision and control and that it is final for its stated purpose regulator publish guideline on authenticating document including how to handle preliminary drawing revision and electronic seal a seal is not a guarantee that the building will perfor"},{"k":"Guide","u":"/guides/national-building-code-of-canada-hvac-requirements/","t":"National Building Code of Canada: HVAC requirements","s":"Learn how the National Building Code is structured, where its HVAC requirements live, which standards it references, and how provinces adopt and amend it.","nh":"code and standard in canada edition and adoption how the nbc is organized part 3 versus part 9 building part 6 heating ventilating and air conditioning fire and smoke requirement affecting hvac energy efficiency alternative solution practical tip for owner and designer key takeaway","nb":"the national building code of canada nbc is the model code on which most canadian building regulation is based it is published by the national research council of canada nrc and developed by the canadian board for harmonized construction code on its own the nbc has no legal force it become law only when a province territory or municipality adopt it with or without change for hvac designer contractor and building owner understanding how the nbc is organized make it much easier to find the requirement that apply to a project and to see why the answer often depend on the province this guide give an overview it doe not replace reading the code edition in force where you are building edition and adoption the nbc is updated on a roughly five year cycle the 2020 edition is the basis for most provincial code currently in force and the nrc released the 2025 edition of the national model code around the turn of 2026 province adopt new edition on their own timeline often a year or more after publication and frequently with amendment some jurisdiction publish their own code based on the nbc alberta national building code alberta edition british columbia bc building code with the city of vancouver publishing its own vancouver building by law ontario ontario building code a regulation under the building code act that follow the nbc structure but has many difference quebec construction code of quebec chapter i building based on the nbc with quebec amendment other province and territory generally adopt the nbc directly with limited amendment see provincial building code and hvac for detail on alberta bc and ontario how the nbc is organized the nbc is divided into three division division a compliance objective and functional statement it define what the code is trying to achieve and allow alternative solution division b acceptable solution the technical requirement most people think of as the code division c administrative provision division b is organized into part the part most re"},{"k":"Guide","u":"/guides/provincial-building-codes-and-hvac-alberta-bc-and-ontario/","t":"Provincial building codes and HVAC: Alberta, BC and Ontario","s":"Learn which code editions and regulators govern HVAC work in Alberta, BC and Ontario, how they differ from the national model codes, and what that means for design and permitting.","nh":"code and standard in canada the common foundation summary comparison alberta british columbia ontario gas and refrigeration code in practice practical advice key takeaway","nb":"building regulation in canada is a provincial responsibility the national model code published by the national research council are the starting point but each province decide which edition to adopt when and with what change larger city sometime add their own requirement on top for hvac work the building code is only one piece gas installation refrigeration system boiler and pressure vessel and electrical work are each governed by separate code and regulator this guide summarize the situation in alberta british columbia and ontario where most of our work take place code adoption change regularly so alway confirm the edition in force on the date of permit application with the local authority having jurisdiction the common foundation all three province base their building code on the national building code of canada nbc and most of the hvac content of part 6 and part 9 is similar across them they also reference many of the same standard including ashrae 62 1 for ventilation csa b149 1 for gas csa b52 for refrigeration csa z317 2 for health care hvac and nfpa 96 for commercial kitchen exhaust see our overview of the national building code hvac requirement the difference tend to be in energy efficiency administration professional involvement and a handful of technical amendment summary comparison topic alberta british columbia ontario building code national building code 2023 alberta edition in force since may 2024 2024 bc building code in force since march 2024 vancouver has its own by law 2024 ontario building code in force since january 2025 basis nbc 2020 with alberta amendment nbc 2020 with bc amendment nbc structure with extensive ontario specific content large building energy necb with tiered performance necb or ashrae 90 1 compliance path plus the bc energy step code and zero carbon step code where adopted locally supplementary standard sb 10 referencing ashrae 90 1 or necb with ontario modification gas installation csa b149 1 under the safety code act csa b149 "},{"k":"Guide","u":"/guides/seismic-restraint-of-hvac-equipment-in-canada/","t":"Seismic restraint of HVAC equipment in Canada","s":"Learn when HVAC equipment, ductwork and piping need seismic restraint in Canada, which codes apply, and how restraints are designed, installed and inspected.","nh":"code and standard in canada seismic hazard in canada code requirement nbc part 4 csa s832 other reference what need restraint design responsibility coordination with vibration isolation existing building frequently asked question do building in calgary or edmonton need seismic restraint can vibration isolator double as seismic restraint who inspect seismic restraint key takeaway","nb":"when an earthquake strike the structure of a modern building is designed to stay standing its mechanical system are a different story unless they are restrained unanchored rooftop unit can slide off curb chiller can walk off their isolator and swinging pipe can break at joint and flood a building in past earthquake worldwide damage to nonstructural component has often been what kept building closed afterward the national building code of canada nbc require mechanical and electrical component to be designed to resist seismic force in many part of the country this guide explain where those requirement come from what they cover and how seismic restraint is designed and verified on canadian project seismic hazard in canada seismic hazard vary widely across the country the highest hazard is in southwestern british columbia including vancouver and victoria along the coast to haida gwaii and in part of yukon moderate hazard zone include the ottawa and st lawrence valley including montreal and quebec city and part of the charlevoix region much of the prairy including edmonton and calgary has low hazard though restraint may still be required for some building and component the nbc provide seismic hazard value for each location derived from the geological survey of canada national seismic hazard model the 2020 edition of the nbc adopted an updated hazard model which changed design value in some location alway use the hazard value from the code edition in force in your province code requirement nbc part 4 nbc part 4 subsection 4 1 8 cover earthquake design it include requirement for element of structure nonstructural component and equipment often called operational and functional component ofc the code provide a formula for the lateral design force on a component which depend on the site spectral acceleration and site class soil condition the building importance category with higher factor for post disaster building such as hospital fire hall and emergency operation center a c"},{"k":"Guide","u":"/guides/stairwell-pressurization-and-smoke-control-systems/","t":"Stairwell pressurization and smoke control systems","s":"Learn why high buildings use stair pressurization and other smoke control measures, how the systems are designed around pressure and door force limits, and how they are tested and kept working.","nh":"code and standard in canada code basis how stair pressurization work single injection and multiple injection compensated and non compensated system the pressure window stack effect in canadian winter cold outdoor air other smoke control approache testing and commissioning common problem key takeaway","nb":"in a fire smoke is usually more dangerous than flame it spread quickly through building reduce visibility and contain toxic gase in a high rise building occupant may need several minute to descend the stair and firefighter use the same stair to reach the fire floor keeping exit stair clear of smoke is therefore one of the most important life safety function in a tall building stairwell pressurization is the most common way to do this in canada fan blow outdoor air into the stair shaft so that the stair is at a higher pressure than the floor around it when a door to a smoky floor is opened air flow out of the stair rather than smoke flowing in code basis requirement for limiting smoke movement in high building come from part 3 of the national building code nbc and the provincial code based on it the nbc additional requirement for high building generally apply to building with a floor level more than 18 m 59 ft above grade and to certain other building based on occupancy the code set an objective exit stair and certain other area must be protected from smoke contamination for a period long enough to allow evacuation and firefighting rather than prescribing a single method the nbc explanatory note describe several acceptable measure for high building these include pressurizing exit stair with mechanical fan providing vestibule between floor area and stair sometime ventilated or pressurized venting smoke from the fire floor through shaft or exterior opening using building air handling system to exhaust the fire floor and pressurize adjacent floor elevator hoistway protection particularly for firefighter elevator provincial code may modify these measure ontario for example has its own detailed provision in the ontario building code designer must confirm with the authority having jurisdiction which approach is acceptable for a given building for broader context see fire damper and smoke control under canadian code how stair pressurization work a stair pressurization syste"},{"k":"Guide","u":"/guides/ashrae-standard-180-inspection-and-maintenance/","t":"ASHRAE Standard 180 inspection and maintenance","s":"Learn how ASHRAE Standard 180 defines a minimum inspection and maintenance program for commercial HVAC, and how to apply its tables in a real building.","nh":"operation and maintenance purpose and scope program element the equipment table example task structure using standard 180 in practice writing maintenance contract auditing an existing program tying maintenance to performance canadian consideration frequently asked question is ashrae standard 180 required by law in canada doe following standard 180 guarantee good performance how doe standard 180 relate to commissioning key takeaway","nb":"maintenance contract and in house program often grow by habit task get added after a failure other are dropped when budget tighten and nobody can say whether the result is adequate ansi ashrae acca standard 180 standard practice for inspection and maintenance of commercial building hvac system provide a reference point it define the minimum element of a maintenance program and list inspection task for common hvac equipment standard 180 was developed jointly by ashrae and the air conditioning contractor of america acca it is not adopted by canadian building code but owner property manager and contractor across canada use it to write maintenance specification audit existing program and set expectation in service contract this guide explain how it is organized and how to put it to work purpose and scope the standard stated purpose is to establish minimum hvac inspection and maintenance requirement that preserve a system ability to achieve acceptable thermal comfort energy efficiency and indoor air quality it apply to commercial building and to hvac system in other building that are similar in type and complexity it doe not cover residential system in single family home or highly specialized process system although its approach can be adapted two idea run through the standard a maintenance program is a managed process not just a list of task it need an inventory documented plan record and periodic review condition indicator tell you whether a task need to be performed and whether a system is performing acceptably measurement and observation drive maintenance rather than habit alone program element standard 180 require an inspection and maintenance program to include several core element in practical term they are identify system and equipment create an inventory of hvac system and component within the program scope determine performance objective define what each system must achieve such as space temperature range ventilation rate or pressure relationship these often co"},{"k":"Guide","u":"/guides/belt-drives-vs-direct-drives/","t":"Belt drives vs direct drives","s":"Learn how belt drives and direct drives differ in energy use, maintenance and adjustability, and when converting a fan to direct drive makes sense.","nh":"operation and maintenance how each drive work belt drive direct drive comparison energy consideration maintenance consideration belt drive with vfd when to convert to direct drive frequently asked question are synchronous belt alway better than v belt is an ec motor the same as direct drive can i just remove the belt and couple the motor key takeaway","nb":"every fan need a way to transmit power from the motor to the impeller in commercial hvac there are two basic approache a belt drive use pulley called sheave and one or more belt to connect the motor shaft to the fan shaft a direct drive mount the impeller on the motor shaft or couple the two directly so they turn at the same speed belt drive were the standard for decade because they let designer set fan speed by choosing sheave size variable frequency drive vfd and electronically commutated ec motor have changed that making direct drive practical for a much wider range of fan this guide compare the two and explain when a change make sense how each drive work belt drive the motor sheave and fan sheave are sized to give the required fan speed a smaller motor sheave or larger fan sheave slow the fan adjustable pitch motor sheave allow fine tuning during air balancing belt may be standard v belt which wedge into groove in the sheave they are common inexpensive and forgiving of minor misalignment but they slip and stretch over time cogged or notched v belt which flex more easily around small sheave run cooler and lose less energy than standard v belt synchronous belt which have teeth that mesh with toothed sheave they do not slip and have lower losse but they are less forgiving of misalignment transmit more noise and vibration and offer no slip protection if the fan jam direct drive the fan impeller is mounted directly on the motor shaft or connected by a flexible coupling fan speed equal motor speed so speed control come from a vfd or an ec motor with integrated speed control plenum fan in modern air handler and fan array are almost alway direct drive comparison factor belt drive direct drive transmission losse losse in belt and bearing higher with poor tension or alignment no belt losse speed setting sheave selection adjustable sheave vfd or ec motor control routine maintenance belt tension alignment belt replacement extra bearing motor bearing only no belt dust belt d"},{"k":"Guide","u":"/guides/chiller-maintenance-and-oil-analysis/","t":"Chiller maintenance and oil analysis","s":"Learn which maintenance tasks keep commercial chillers efficient and reliable, how to read operating logs and approach temperatures, and what oil analysis reveals.","nh":"operation and maintenance operating log the foundation approach temperature heat exchanger maintenance tube cleaning eddy current testing refrigerant management oil analysis what oil analysis measure using the result other routine task frequently asked question how often should chiller oil be changed can i tell if my chiller is wasting energy who should perform chiller maintenance key takeaway","nb":"a chiller is usually the largest single energy user in a building hvac system and one of the most expensive piece of equipment to replace it is also complex a compressor heat exchanger refrigerant oil control and safety device all have to work together good maintenance keep a chiller running efficiently and catche problem while they are still inexpensive to fix this guide cover the core maintenance practice for water cooled and air cooled chiller in commercial building with particular attention to operating log heat exchanger condition and oil analysis exact task vary by chiller type and manufacturer so alway follow the manufacturer maintenance manual alongside this general guidance operating log the foundation most chiller problem show up in operating data before they cause a failure recording key reading regularly either manually or through the building automation system provide a baseline and reveal trend typical log point include entering and leaving chilled water temperature and flow or pressure drop entering and leaving condenser water temperature and flow or pressure drop evaporator and condenser refrigerant pressure and saturation temperature compressor motor current and percentage load oil pressure oil temperature and oil level discharge temperature and superheat purge run time and pump out count for low pressure chiller alarm trip and run hour modern chiller controller record much of this automatically the value come from someone reviewing it a trend that drift slowly over month is easy to miss without regular review approach temperature the approach temperature is the difference between the refrigerant saturation temperature and the leaving water temperature in a heat exchanger it is one of the best indicator of heat exchanger condition heat exchanger approach what a rising value suggest evaporator leaving chilled water temperature minus evaporator saturation temperature fouled tube low refrigerant charge oil logging low water flow condenser condenser sat"},{"k":"Guide","u":"/guides/coil-cleaning-and-its-energy-impact/","t":"Coil cleaning and its energy impact","s":"Learn how dirt on heating, cooling and condenser coils affects airflow, capacity and energy use, and how to decide when and how to clean them.","nh":"operation and maintenance how fouling affect performance higher airside pressure drop reduced heat transfer condenser coil and compressor efficiency indoor air quality measuring coil condition when to clean cleaning method precaution verifying the result frequently asked question will cleaning a coil lower my energy bill can coil be cleaned while the system run how do i know if the fluid side is fouled key takeaway","nb":"coil are where an hvac system actually move heat air passe over thin fin bonded to tube carrying chilled water hot water steam or refrigerant and heat transfer through the metal anything that coat those fin or block the gap between them make the coil work less well dust lint pollen cottonwood seed grease and biological growth all accumulate over time even with good filtration a fouled coil quietly cost energy and capacity the fan work harder to push air through it and the chiller boiler or compressor work harder to deliver the same heat transfer this guide explain how fouling affect performance how to measure it and how to clean coil without damaging them how fouling affect performance higher airside pressure drop debris on the coil face and between fin reduce the open area for airflow pressure drop across the coil rise in a constant volume system the fan move less air against the higher resistance which reduce capacity and can upset air balance in a variable air volume system the fan speed up to maintain duct static pressure using more energy because fan power rise steeply with airflow and pressure even a modest increase in pressure drop can be noticeable see reducing fan energy for the underlying relationship reduced heat transfer dirt and biofilm act as insulation on the fin surface for a given entering air and fluid condition a fouled coil transfer less heat for a chilled water coil the result is a warmer leaving air temperature or a need for colder water or more water flow to compensate this pushe chiller and pump harder and can contribute to low delta t syndrome in chilled water plant condenser coil and compressor efficiency air cooled condenser coil on rooftop unit condensing unit and air cooled chiller are especially sensitive when a condenser coil is fouled it cannot reject heat as easily so the refrigerant condensing temperature and pressure rise the compressor then work against a higher pressure ratio drawing more power and delivering less cooling in seve"},{"k":"Guide","u":"/guides/cooling-tower-maintenance-and-legionella-control/","t":"Cooling tower maintenance and Legionella control","s":"Learn how cooling tower maintenance, water treatment and a written water management plan reduce Legionella risk, and which Canadian and industry requirements apply.","nh":"operation and maintenance why legionella grow in cooling tower standard and regulation the water management program water treatment physical maintenance seasonal and idle operation worker safety frequently asked question how often should cooling tower water be tested for legionella do closed circuit fluid cooler carry the same risk who should prepare the water management plan key takeaway","nb":"cooling tower reject heat from chiller and other equipment by evaporating a small portion of the water circulating through them the same condition that make them effective warm water large wetted surface constant exposure to outdoor air and nutrient also make them a potential breeding ground for legionella bacteria when contaminated water is carried out of the tower as drift people nearby can inhale droplet and develop legionnaire disease a serious form of pneumonia cooling tower have been linked to community outbreak in canada and elsewhere including the 2012 outbreak in quebec city that led quebec to introduce mandatory cooling tower regulation this guide cover the maintenance practice water treatment and management plan that control the risk along with the standard and regulation owner should know why legionella grow in cooling tower legionella bacteria occur naturally in fresh water at low level they multiply when condition favour them water temperature in the range of roughly 25 to 45 c 77 to 113 f which matche typical condenser water temperature stagnant water such as in idle tower dead leg and bypass piping biofilm sediment scale and corrosion product that provide shelter and nutrient inadequate or inconsistent biocide treatment biofilm is the critical factor bacteria in biofilm are shielded from biocide so a tower with clean water chemistry but heavy biofilm can still harbour legionella standard and regulation document what it cover ansi ashrae standard 188 legionellosis risk management for building water system requiring a water management program ashrae guideline 12 practical guidance on managing legionella risk in building water system cti guideline wtb 148 cooling technology institute best practice for cooling tower legionella control quebec safety code provision for cooling tower mandatory registration maintenance program water sampling and reporting for cooling tower in quebec provincial and municipal public health rule requirement vary and some munici"},{"k":"Guide","u":"/guides/filter-change-strategies/","t":"Filter change strategies","s":"Learn when to change HVAC filters in commercial buildings, how to use pressure drop to decide, and how to balance filter cost against fan energy and air quality.","nh":"operation and maintenance how filter load the main strategy fixed calendar pressure drop trigger life cycle cost optimum hybrid setting up a pressure based program prefilter and final filter bypass the hidden problem special situation frequently asked question how often should commercial filter be changed do higher merv filter waste energy should airflow be rebalanced after changing filter type key takeaway","nb":"changing filter is the most familiar hvac maintenance task and one of the most often done poorly filter get changed on a calendar whether they need it or not or they are left until they collapse into the coil neither approach is ideal the best strategy balance three thing the cost of the filter and labour the fan energy used to push air through them and the air quality and equipment protection they provide this guide explain the main strategy for deciding when to change filter in commercial building how to set them up properly and common mistake to avoid how filter load as a filter capture particle its resistance to airflow or pressure drop increase a new filter start at its initial resistance which depend on its media depth and face velocity over time the pressure drop climb slowly at first and then faster as the media fill rising pressure drop has two effect in a constant volume system airflow fall as resistance rise unless the fan is rebalanced less airflow mean less ventilation cooling and heating capacity in a variable air volume system the fan speed up to maintain duct static pressure using more energy for most mechanical filter efficiency stay the same or rise slightly as they load some electrostatically charged media lose efficiency as the charge is masked by captured particle manufacturer state a recommended final resistance at which the filter should be replaced beyond that point filter can deform leak at the seal or in extreme case rupture the main strategy strategy basis strength weaknesse fixed calendar change every set number of week or month simple to schedule and budget filter often changed too early or too late pressure drop trigger change when measured pressure drop reache a set value respond to actual loading protect airflow need working gauge or sensor and someone to read them life cycle cost optimum change at the pressure drop that minimize total filter labour and energy cost lowest total cost require analysis and good data hybrid pressure trigg"},{"k":"Guide","u":"/guides/hvac-troubleshooting-hot-and-cold-complaints/","t":"HVAC troubleshooting: hot and cold complaints","s":"Learn a step-by-step method for diagnosing hot and cold complaints in commercial buildings, and the most common causes at the zone, system and plant level.","nh":"operation and maintenance start with the complaint measure the actual condition zone level cause terminal unit check override and setpoint system level cause plant level cause design and envelope limitation a troubleshooting procedure frequently asked question why are some people alway cold when other are comfortable doe lowering the thermostat setpoint cool a room faster when is air balancing needed key takeaway","nb":"hot and cold complaint are the most common call a facility team receive they are easy to dismiss as personal preference and sometime that is part of the story more often though a persistent complaint point to a real problem a failed actuator a mislocated sensor a zone serving incompatible space or a system that cannot meet the load good troubleshooting is systematic instead of turning down the setpoint and hoping work from the occupant outward from the room to the terminal unit to the air handler to the central plant this guide lay out that process and the most common cause found at each level start with the complaint before touching equipment collect information where exactly one desk one room one side of the floor or the whole building when morning only afternoon monday sunny day cold snap too hot or too cold and how often constant discomfort point to a different cause than intermittent discomfort other symptom draft stuffiness noise humidity odour what changed new tenant renovation furniture move new equipment schedule change pattern in time and location are powerful clue afternoon overheating on west facing perimeter office suggest solar gain monday morning cold complaint suggest a warm up or optimal start problem one cold office surrounded by comfortable one suggest a terminal unit fault measure the actual condition occupant feel temperature radiant effect air movement and humidity together ashrae standard 55 describe how these factor combine measure rather than relying on the thermostat display air temperature at desk height in the occupied zone compared with the zone sensor reading surface temperature of window and exterior wall using an infrared thermometer air movement near the occupant looking for draft from diffuser or cold window relative humidity if stuffiness or dryness is mentioned a discrepancy between the zone sensor and the occupied zone is common see thermal comfort and ashrae standard 55 for how these factor interact zone level cause most complai"},{"k":"Guide","u":"/guides/operator-training-and-o-m-manuals/","t":"Operator training and O&M manuals","s":"Learn what a good O&M manual and systems manual contain, how to plan effective operator training, and how to keep documentation useful after turnover.","nh":"operation and maintenance o m manual versus system manual what a good o m manual contain what a good system manual contain planning effective training start with a training plan match training to the audience make it practical record it turnover and the first year keeping documentation alive frequently asked question when should o m manual be delivered how much training time is enough who should attend training key takeaway","nb":"a new building can have well designed properly installed hvac system and still perform poorly within a year the usual reason is that the people operating it do not fully understand how it is meant to work setting get changed to solve a complaint alarm are silenced sequence are overridden and the building gradually drift away from its design intent operator training and good documentation are the defence against that drift they are often the last item delivered on a construction project squeezed in during the final week and they deserve more attention than they usually get this guide cover what owner should expect from o m manual system manual and training and how to make them useful o m manual versus system manual the two term are often confused document content typical author primary purpose operation and maintenance o m manual product data installation instruction maintenance procedure part list warranty test report for each piece of equipment contractor compiled from manufacturer literature reference for maintaining individual component system manual how system work together design intent sequence of operation setpoint operating procedure troubleshooting recommissioning guidance commissioning authority with design team and contractor understanding and operating the building as a whole a traditional o m manual answer how do i maintain this pump a system manual answer how is the heating plant supposed to operate and why both are needed ashrae guideline 1 4 procedure for preparing facility system manual describe the system manual in detail and the commissioning process described in ashrae guideline 0 and standard 202 call for one csa z320 building commissioning also addresse documentation and training in the canadian context green building program such as leed include system manual and training requirement within their enhanced commissioning credit what a good o m manual contain for each system and major piece of equipment equipment schedule with tag number matching"},{"k":"Guide","u":"/guides/planning-equipment-replacement-and-capital-budgets/","t":"Planning equipment replacement and capital budgets","s":"Learn how to build a multi-year HVAC capital plan, estimate remaining equipment life, prioritize replacements by risk, and avoid like-for-like replacement traps.","nh":"operation and maintenance start with an inventory estimating remaining life typical service life condition assessment obsolescence prioritizing replacement avoid the like for like trap building the budget reserve fund and condominium facility condition index frequently asked question should i replace equipment before it fail how accurate are capital plan cost estimate how often should the plan be updated key takeaway","nb":"hvac equipment doe not last forever and replacing it is expensive without a plan replacement tend to happen as emergency a boiler fail in january a chiller compressor seize in july and the owner pay premium price for whatever can be installed fastest a capital plan turn those emergency into scheduled project with time to compare option apply for incentive and budget properly this guide explain how to build a practical multi year capital plan for hvac equipment from inventory and condition assessment through prioritization and budgeting it apply to single building and portfolio and to owner ranging from commercial landlord to condominium corporation and public institution start with an inventory a capital plan is only as good as its asset list for each major piece of equipment record type manufacturer model capacity and serial number year of installation or manufacture location and the area or system it serve refrigerant type fuel type and efficiency rating where relevant maintenance history major repair and known problem if a preventive maintenance program and cmm already exist much of this information is already available see preventive maintenance program for hvac estimating remaining life typical service life published service life data give a starting point ashrae maintain a service life and maintenance cost database and its handbook have long included a table of median equipment service live these figure describe typical lifespan under normal condition actual life depend heavily on maintenance operating hour environment and original quality equipment commonly cited median service life range year packaged rooftop unit 15 to 20 air cooled chiller reciprocating scroll screw 20 to 25 water cooled centrifugal chiller 20 to 30 galvanized steel cooling tower 15 to 20 steel firetube and watertube boiler 20 to 30 cast iron sectional boiler 30 to 35 base mounted pump 20 or more centrifugal fan 20 to 25 vav terminal unit 20 or more building automation controller 10 to 15 "},{"k":"Guide","u":"/guides/preventive-maintenance-programs-for-hvac/","t":"Preventive maintenance programs for HVAC","s":"Learn how to set up and run a preventive maintenance program for commercial HVAC systems, and how to balance time-based, condition-based and run-to-failure strategies.","nh":"operation and maintenance maintenance strategy building the program 1 create an asset inventory 2 rank criticality 3 define task and frequency 4 choose a cmm 5 assign resource 6 measure and improve typical task category linking pm to control and data measuring program performance frequently asked question how often should hvac equipment be serviced is preventive maintenance worth the cost what is the link between pm and commissioning key takeaway","nb":"every commercial hvac system get maintained one way or another the question is whether that maintenance is planned or whether it happen in a rush after a chiller trip on the hottest day of july a preventive maintenance pm program is the planned version a documented set of inspection and task carried out on a schedule recorded and reviewed so the program improve over time well run pm program keep equipment reliable protect comfort and indoor air quality hold energy use close to design and extend equipment life this guide walk through how to build one whether you manage a single office building or a portfolio maintenance strategy a good program use more than one strategy chosen to fit each asset strategy how it work best suited to reactive run to failure repair or replace only after failure low cost non critical item with easy replacement such as small exhaust fan time based preventive task at fixed interval or runtime hour filter belt lubrication inspection required by code or warranty condition based task triggered by measured condition such as filter pressure drop filter coil water treatment item with variable wear rate predictive trend analysis to forecast failure such as vibration or oil analysis chiller large fan and pump critical equipment reliability centerd strategy chosen per failure mode based on consequence critical facility such as hospital and data center most building start with time based task and add condition based and predictive method for their most important equipment pure reactive maintenance is reasonable for some asset but should be a deliberate choice not a default building the program 1 create an asset inventory list every maintainable asset air handler rooftop unit fan pump chiller boiler cooling tower terminal unit heat exchanger humidifier damper control panel and so on for each record a unique asset tag that matche the physical label and the drawing location area served and system manufacturer model serial number and installation date key"},{"k":"Guide","u":"/guides/seasonal-changeover-checklists/","t":"Seasonal changeover checklists","s":"Learn what to check when switching commercial HVAC systems between heating and cooling seasons in Canada, with step-by-step spring and fall checklists.","nh":"operation and maintenance timing the changeover spring changeover heating to cooling cooling tower and condenser water chiller air handler and rooftop unit heating system control fall changeover cooling to heating freeze protection cooling tower and chiller heating plant air side and terminal unit control making checklist work frequently asked question can changeover be fully automated when should freezestat be tested what is the biggest risk in changeover key takeaway","nb":"canadian building live through two very different season a system that ran flat out heating at minus 30 c minus 22 f in january may be rejecting heat at 30 c 86 f in july many system handle the transition automatically but plenty of equipment need a deliberate changeover cooling tower to be filled and treated chiller to be started boiler to be reduced or shut down and freeze protection to be verified before the first cold night a changeover done well prevent a predictable set of problem frozen coil in october a chiller that will not start on the first hot day in may and a cooling tower that sat stagnant for month this guide provide practical spring and fall checklist that can be adapted to most commercial building timing the changeover spring and fall shoulder season in canada can swing between heating and cooling within a single day some practical point on timing do not wait for the first heat wave or cold snap start changeover task early enough to fix problem before they matter plan for overlap many building need both heating and cooling available during shoulder season particularly with perimeter heating and interior cooling load coordinate contractor chiller boiler water treatment and control contractor book up quickly in spring and fall check the forecast freeze protection must be in place before the first hard frost which arrive early in edmonton and calgary and later in vancouver and toronto system with automatic changeover such as many vrf and heat pump system still benefit from a seasonal check of setpoint control and outdoor unit spring changeover heating to cooling cooling tower and condenser water inspect the tower basin fill drift eliminator distribution system and fan before filling clean and disinfect the tower according to the water management plan before start up see cooling tower maintenance and legionella control reinstall any component removed for winter and close drain fill the system check makeup water and float valve and verify water treatment"},{"k":"Guide","u":"/guides/vibration-analysis-for-hvac-equipment/","t":"Vibration analysis for HVAC equipment","s":"Learn how vibration measurement and spectrum analysis reveal developing faults in HVAC rotating equipment, which standards apply, and how to use the results in maintenance.","nh":"operation and maintenance what is measured reading a vibration spectrum standard and acceptance criteria program approache route based monitoring online monitoring setting up a program vibration and variable speed drive vibration isolation versus vibration analysis frequently asked question is vibration analysis worth it for a small building how often should reading be taken can vibration analysis replace oil analysis on chiller key takeaway","nb":"rotating equipment tell you when something is wrong long before it fail a fan with a worn bearing a pump with a misaligned coupling or a motor with a loose foundation all vibrate in characteristic way vibration analysis measure and interpret that vibration to find developing problem early while repair can still be planned for hvac system the main candidate are large fan pump chiller cooling tower fan and gearboxe and air compressor this guide explain what vibration analysis measure how common fault show up which standard apply and how to fit vibration monitoring into a maintenance program what is measured vibration is the oscillating motion of a machine around its resting position it can be described in three related way displacement the distance the surface move usually in micrometre mil most useful at low frequency velocity how fast the surface move usually in mm s in s the most common general measure of machine condition across typical hvac speed acceleration the rate of change of velocity in g or m s2 most sensitive at high frequency so useful for early bearing defect and gear problem reading are taken with an accelerometer mounted on bearing housing in three direction horizontal vertical and axial overall vibration level is a single number summarizing total vibration spectrum analysis break vibration down by frequency which is what allow a technician to diagnose the cause reading a vibration spectrum most fault produce vibration at frequency related to the shaft running speed often called 1x a fan turning at 1 200 rpm has a 1x frequency of 20 hz the pattern of peak at multiple or fraction of running speed point to the likely problem fault typical spectral signature common cause in hvac imbalance high 1x mainly radial dirt buildup on fan blade lost balance weight wheel erosion misalignment high 1x and 2x often strong axial motor and pump coupling misalignment belt sheave misalignment looseness many harmonic of running speed loose bolt cracked base worn bearing f"}]